Loading...
North Gateway 4-PT200211T M C I T Y O F S CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Name of Applicant Clay Cristy Date Submitted 2/4/2020 Address of Applicant 1903 Central Dr. Bedford, TX 76021 Phone Number (817) 281-0572 Fax Number Location of Construction (address, if available):State Highway 121 Subdivision North Gateway Plaza Section # Block # OLot # OR Survey/Abstract # C. Squires Acreage 1327 Location description (attach vicinity map): 121 Frontage and Denton Tap Rd. 1. Type of proposed construction or development: C' Residential (' Alteration of a natural waterway drainage course C� Non -Residential C Other (describe & attach drawing or sketch) C' Placement of Fill (in right-of-way or on private property) 2. Description of Construction Permit requested: ❑x Paving xQ F'1 Sidewalk Drive Approach x]Excavation Fire Lane Bridge Median or Landscape � Water Main � R.C.P. Sanitary Sewer Main Flume Inlet � Box Culvert x❑ Rip Rap x❑ Fill Area x❑ Drainage Channel Excavation Slope Protection/Retaining Wall x❑ Parking Lot Provide an attachment containing the name and 24 -hr. contact phone number of supervisors) for every contractor working under this general permit. 3.A11 construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance. 4. Applicant shall provide a copy of approved plans, specifications and the related cost estimate or contract for the purpose of permit fee calculation verification. CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2 5.A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with the City of Coppell Fee Ordinance. See Page 3 for calculation formula. Amount Due: $ ti r, tig -; ? Date Paid: 2 -) $ - ZoZo NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the right-of-way not approved by the City Engineer. ➢Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department @ 972-304-3600 Street Department @ 972462-5150 Fire Department @ 972-304-3512 Engineering Dept. @ 972-304-3679 ➢Attach barricade plan / trench safety plan of a lane or street closure. (Required) ➢It is a requirement of this permit that As -Built Drawings be turned in at the end of this project. As-Builts consist of 1 set full size paper copy, 1 set full size mylar and a CD with Autocad.dwg files. NOTE: Street closures are allowed from 9:00 a.m. unti13:30 p.m. ONLY unless otherwise approved by City Engineer. ➢A pre- construction meeting is required prior to beginning work related to this permit. Contact the inspector assigned to your project to schedule the meeting. Printing your name indicates your acceptance of the terms and conditions of this form: Clay Cristy 817-281-0572 Contact Number Contact Number FOR CITY USE ONLY Is the fill area located in an identified flood hazard area? C' Yes C''�No If YES, a Floodplain Development Permit is required before any construction can begin. Is additional information required? C Yes P/ No Are other federal, state, or local permits required? C Yes \P07PERMIT APPLICATION APPROVED C PERMIT APPLICATION DENIED City Approval llate r� Applicant shall indemnify artd forever hold harmless against the City of Coppell each a�td every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit front the City, if such permit is granted. t w I T V Page 3 OFFELL 24 14 .. INSPECTION FEE CALCULATION SHEET Project Name IHatCreekBurger Date 1 /27/2020 As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and inspected by the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees are due on or before the date of the Pre -construction Meeting. In order to verify the inspection fee due, please provide a copy of the development contracts) and this spreadsheet with completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following improvements: Grand Total (total of 6569.32 both colored fields) Submit by E-mail Print Form PUBLIC IMPROVEMENTS CONTRACT AMOUNT X 4% = PRIVATE IMPROVEMENTS CONTRACT AMOUNT X 2% _ Paving 0.00000000 0.00000000 147000.00 2940.00 Water 0.00000000 0.00000000 48000.00 960.00 Sanitary Sewer 0.00000000 0.00000000 20250.00 405.00 Storm Sewer 0.00000000 0.00000000 Alleys 0.00000000 0.00000000 0.00 0.00 Sidewalks 0.00000000 0.00000000 22250.00 445.00 Other 0.00000000 0.00000000 90966.00 1819.32 Total 0.00000000 0.00000000 328466.00 6569.32 Grand Total (total of 6569.32 both colored fields) Submit by E-mail Print Form INVOICE (INV-20-00021507) FOR THE CITY OF COPPELL TEXAS BILLING CONTACT RSPD HOLDING INC 10580 John W Elliott Dr, 80 Frisco, Tx 750332001 INVOICE NUMBER INVOICE DATE INVOICE DUE DATE INVOICE STATUS INVOICE DESCRIPTION INV-20-00021507 02/07/2020 02/07/2020 NONEPaid In Full REFERENCE NUMBER FEE NAME TOTAL CONS19-10-015035 Civil Inspection Fee - Private $6,569.32 $6,569.32 SUB TOTAL150 W Sh 121 Coppell, TX 75019 TOTAL $6,569.32 REMITTANCE INFORMATION City Of Coppell P.O. Box 9478 Coppell, TX 75019 Page 1 of 1February 18, 2020 255 Parkway Boulevard, Coppell Texas 75019 INVOICE (INV-19-00019893) FOR THE CITY OF COPPELL TEXAS BILLING CONTACT RSPD HOLDING INC 10580 John W Elliott Dr, 80 Frisco, Tx 750332001 INVOICE NUMBER INVOICE DATE INVOICE DUE DATE INVOICE STATUS INVOICE DESCRIPTION INV-19-00019893 12/12/2019 12/12/2019 NONEDue REFERENCE NUMBER FEE NAME TOTAL CONS19-10-015035 IMPACT: Roadway Impact Fee $22,725.00 $22,725.00 SUB TOTAL150 W Sh 121 Coppell, TX 75019 TOTAL $22,725.00 REMITTANCE INFORMATION City Of Coppell P.O. Box 9478 Coppell, TX 75019 Page 1 of 1December 12, 2019 255 Parkway Boulevard, Coppell Texas 75019 Description:Brand: Design Type: Address:DMA: Building SF:3,383 City:CM:# of Seats: Site No:Date prepared: 12/31/2019 Dist. Model Date: Entity No:Tax Rate: 8.25%Site SF: Freight Rate: Staging Rate: PROJECT COST DETAIL II. SITE WORK Qty Units Unit Cost Total Cost Demolition/Land Clearance $9,687 Site Clearing / Grubbing 1 CY 4987.00 $4,987 02-220 SURVEYOR 1 4700.00 $4,700 02-220 ~Other 0 0.00 $0 Building/Concrete/Other Removal $0 Remove Existing Buildings 0 LS 0.00 $0 Remove Existing Structures 0 LS 0.00 $0 02-220- INCLUDED Remove Existing Utilities 0 LS 0.00 $0 ~Remove Existing Paving 0 SF 0.00 $0 Remove Underground Rock 0 CY 0.00 $0 Other $0 Other 0 0.00 $0 Grading(Excavation,Backfill,Compaction)$83,605 Level / Grading / Excavation (Existing Soils)1 CY 70105.00 $70,105 02-315 Import Fill / Grading 0 CY 0.00 Export Spoils 0 CY 0.00 02-315 INCLUDED Finish Grading 0 LS 0.00 Soil Stabilization 0 SF 0.00 02-315 INCLUDED Soild & Concrete Testing 1 13500.00 $13,500 ~Other 0 0.00 $0 Site Construction $182,891 ~Concrete paving 1 SY $132,670.00 $132,670 02-750 ~Concrete curbs / gutters 1 LF $8,960.00 $8,960 02-771 ~Concrete walk-ways 1 SF $22,250.00 $22,250 02-775 ~Asphalt paving 0 SY $0.00 ~Lot striping / Powerwash 1 LS $1,500.00 $1,500 02-750 ~Trash enclosure / concrete pad 0 EA $0.00 02-800 Yard lighting - footings / piping 1 EA $5,000.00 $5,000 02-700 Wheel stops 0 EA $0.00 INCLUDED Misc. drainage / flumes / etc.0 LF $0.00 HC Signs, Hand Rails, Misc.1 LS $2,675.94 $2,676 Bollards 0 EA $0.00 Wood Fence - Cedar @ 6'0 LF $0.00 Retaining Wall(s) - Concrete @ 4'0 LF $0.00 Transformer Pad 1 EA $2,750.00 $2,750 02-760 & 02-580 Concrete Footing 0 LS $0.00 Electrical to OCB and Clearance Bar for lighting 0 LS $0.00 Curved wall behind Ext. MB & OCB 0 LS $0.00 EXPANSION CAULKING 1 LS $5,370.00 $5,370 ~Bike Rack 1 EA $1,715.00 $1,715 02-871 2 EA Utilities $131,775 ~Water Meter/ Service Entrance 1 LF $48,000.00 $48,000 02-510 - 02-511 ~Gas Service Entrance 0 LF $0.00 ~Sanitary Sewer 1 LF $20,250.00 $20,250 02-530 Cleanouts 0 EA $0.00 ~Grease trap 1 LS $10,000.00 $10,000 02-540 ~Electrical Service / Transformer / Overhead 1 LF $48,896.00 $48,896 02-580 Telephone 0 LF $0.00 INCL Storm Sewer 8"1 LF $4,629.00 $4,629 02-630 Storm Drain Inlet 1 EA $0.00 $0 Cable / Misc. Communications 0 LS $0.00 Backflow Preventer / Checkvalve 0 EA $0.00 Rock Trenching / Backfill 0 LF $0.00 Other 0 LS $0.00 ~Other 0 $0.00 Landscape & Irrigation $67,975 Landscape / Irrigation 1 SF 66475.00 $66,475 02-900 Hydro Mulch 0 SF 0.00 SLEEVING 1 SF 1500.00 $1,500 02-900 ~Other 0 0.00 Additional site work not covered $7,361 Termite Control LS 0.00 SWPP / CONSTRUCTION ENTRANCE 1 LS 7361.00 $7,361 02-370 - 02-371 01-001 Other 0 0.00 $0 Offsite - City Streets $0 ~Concrete Sidewalks 0 SF 0.00 ~Concrete Curb / Gutter 0 LF 0.00 ~Concrete Paving / Aprons 0 SY 0.00 $0 ~Asphalt Paving 0 SY 0.00 $0 ~Traffic Lights / Access Control 0 LS 0.00 $0 Landscaping / Irrigation 0 SF 0.00 $0 Street Lighting / Power 0 LS 0.00 $0 Storm Drainage / Structures 0 LS 0.00 $0 Misc. Utility Installs / Relocation 0 LS 0.00 $0 Erosion Control 0 SF 0.00 $0 Detention / Retention 0 SF 0.00 $0 Traffic Control 0 LS 0.00 $0 ~Other 0 LS 0.00 Offsite - Sanitary Sewer $0 ~Sanitary Sewer Install / Relocation 0 LF 0.00 $0 Sanitary Sewer Manholes / Structures 0 EA 0.00 $0 Clean Outs / Misc. 0 EA 0.00 $0 Storm Sewer 0 0.00 $0 ~Other 0 0.00 $0 Offsite - Water Supply $0 ~Water Service Install / Relocation 0 LF 0.00 $0 Fire Hydrant (s)0 EA 0.00 $0 Water Meter(s)0 EA 0.00 $0 Horizontal Borings 0 LF 0.00 $0 Other 0 0.00 $0 ~Other 0 0.00 $0 SITE COSTS SUB-TOTAL: $483,294 HAT CREEK BURGER COMPANY 150 West SH 121 Coppell, TX 75019 $0 SITE COSTS TOTAL: $587,536 0 $0 Proposal X Commitment Jerry Kachel Builder, Inc. General Contractor Laura Lewis -Estimator Signature 12/31/2019 Proposal Date