North Gateway 4-PT200211T M C I T Y O F
S
CONSTRUCTION DEVELOPMENT PERMIT APPLICATION
Name of Applicant Clay Cristy Date Submitted 2/4/2020
Address of Applicant
1903 Central Dr. Bedford, TX 76021
Phone Number (817) 281-0572 Fax Number
Location of Construction (address, if available):State Highway 121
Subdivision North Gateway Plaza Section # Block # OLot #
OR Survey/Abstract # C. Squires Acreage 1327
Location description (attach vicinity map):
121 Frontage and Denton Tap Rd.
1. Type of proposed construction or development:
C' Residential (' Alteration of a natural waterway drainage course
C� Non -Residential C Other (describe & attach drawing or sketch)
C' Placement of Fill (in right-of-way or on private property)
2. Description of Construction Permit requested:
❑x Paving
xQ F'1
Sidewalk
Drive Approach
x]Excavation
Fire Lane
Bridge
Median or Landscape
� Water Main
� R.C.P.
Sanitary Sewer Main
Flume
Inlet
� Box Culvert
x❑ Rip Rap
x❑ Fill Area
x❑ Drainage Channel Excavation
Slope Protection/Retaining Wall
x❑ Parking Lot
Provide an attachment containing the name and 24 -hr. contact phone number
of supervisors) for every contractor working under this general permit.
3.A11 construction shall be in compliance with, but not limited to, the City of Coppell Subdivision
Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The
contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance.
4. Applicant shall provide a copy of approved plans, specifications and the related cost estimate or
contract for the purpose of permit fee calculation verification.
CONSTRUCTION DEVELOPMENT PERMIT APPLICATION
Page 2
5.A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with
the City of Coppell Fee Ordinance. See Page 3 for calculation formula.
Amount Due: $ ti r, tig -; ? Date Paid: 2 -) $ - ZoZo
NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the
right-of-way not approved by the City Engineer.
➢Any work requiring closure of a lane of traffic, street, or alley must be approved in
advance by the Engineering Dept., with notification to the following prior to
closure:
Police Department @ 972-304-3600 Street Department @ 972462-5150
Fire Department @ 972-304-3512 Engineering Dept. @ 972-304-3679
➢Attach barricade plan / trench safety plan of a lane or street closure. (Required)
➢It is a requirement of this permit that As -Built Drawings be turned in at the end of
this project. As-Builts consist of 1 set full size paper copy, 1 set full size mylar and a
CD with Autocad.dwg files.
NOTE: Street closures are allowed from 9:00 a.m. unti13:30 p.m. ONLY
unless otherwise approved by City Engineer.
➢A pre-
construction meeting is required prior to beginning work related to this permit.
Contact the inspector assigned to your project to schedule the meeting.
Printing your name indicates your acceptance of the terms and conditions of this form:
Clay Cristy
817-281-0572
Contact Number
Contact Number
FOR CITY USE ONLY
Is the fill area located in an identified flood hazard area? C' Yes C''�No
If YES, a Floodplain Development Permit is required before any construction can begin.
Is additional information required? C Yes P/
No
Are other federal, state, or local permits required? C Yes
\P07PERMIT APPLICATION APPROVED C PERMIT APPLICATION DENIED
City Approval
llate
r�
Applicant shall indemnify artd forever hold harmless against the City of Coppell each a�td every claim, demand
or cause of action that may be made or come against it by reason of or if any way arising out of the closure,
blocking, excavating, cutting, tunneling, or other work by the applicant under permit front the City, if such
permit is granted.
t w I T V Page 3
OFFELL
24
14
..
INSPECTION FEE CALCULATION SHEET
Project Name IHatCreekBurger Date 1 /27/2020
As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and inspected by
the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering
Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees are
due on or before the date of the Pre -construction Meeting.
In order to verify the inspection fee due, please provide a copy of the development contracts) and this spreadsheet with
completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following
improvements:
Grand Total (total of 6569.32
both colored fields)
Submit by E-mail Print Form
PUBLIC IMPROVEMENTS
CONTRACT AMOUNT
X 4% =
PRIVATE IMPROVEMENTS
CONTRACT AMOUNT
X 2% _
Paving
0.00000000
0.00000000
147000.00
2940.00
Water
0.00000000
0.00000000
48000.00
960.00
Sanitary Sewer
0.00000000
0.00000000
20250.00
405.00
Storm Sewer
0.00000000
0.00000000
Alleys
0.00000000
0.00000000
0.00
0.00
Sidewalks
0.00000000
0.00000000
22250.00
445.00
Other
0.00000000
0.00000000
90966.00
1819.32
Total
0.00000000
0.00000000
328466.00
6569.32
Grand Total (total of 6569.32
both colored fields)
Submit by E-mail Print Form
INVOICE (INV-20-00021507)
FOR THE CITY OF COPPELL TEXAS
BILLING CONTACT
RSPD HOLDING INC
10580 John W Elliott Dr, 80
Frisco, Tx 750332001
INVOICE NUMBER INVOICE DATE INVOICE DUE DATE INVOICE STATUS INVOICE DESCRIPTION
INV-20-00021507 02/07/2020 02/07/2020 NONEPaid In Full
REFERENCE NUMBER FEE NAME TOTAL
CONS19-10-015035 Civil Inspection Fee - Private $6,569.32
$6,569.32 SUB TOTAL150 W Sh 121 Coppell, TX 75019
TOTAL $6,569.32 REMITTANCE INFORMATION
City Of Coppell
P.O. Box 9478
Coppell, TX 75019
Page 1 of 1February 18, 2020 255 Parkway Boulevard, Coppell Texas 75019
INVOICE (INV-19-00019893)
FOR THE CITY OF COPPELL TEXAS
BILLING CONTACT
RSPD HOLDING INC
10580 John W Elliott Dr, 80
Frisco, Tx 750332001
INVOICE NUMBER INVOICE DATE INVOICE DUE DATE INVOICE STATUS INVOICE DESCRIPTION
INV-19-00019893 12/12/2019 12/12/2019 NONEDue
REFERENCE NUMBER FEE NAME TOTAL
CONS19-10-015035 IMPACT: Roadway Impact Fee $22,725.00
$22,725.00 SUB TOTAL150 W Sh 121 Coppell, TX 75019
TOTAL $22,725.00 REMITTANCE INFORMATION
City Of Coppell
P.O. Box 9478
Coppell, TX 75019
Page 1 of 1December 12, 2019 255 Parkway Boulevard, Coppell Texas 75019
Description:Brand: Design Type:
Address:DMA: Building SF:3,383
City:CM:# of Seats:
Site No:Date prepared: 12/31/2019 Dist. Model Date:
Entity No:Tax Rate: 8.25%Site SF:
Freight Rate:
Staging Rate:
PROJECT COST DETAIL
II. SITE WORK Qty Units Unit Cost Total Cost
Demolition/Land Clearance $9,687
Site Clearing / Grubbing 1 CY 4987.00 $4,987 02-220
SURVEYOR 1 4700.00 $4,700 02-220
~Other 0 0.00 $0
Building/Concrete/Other Removal $0
Remove Existing Buildings 0 LS 0.00 $0
Remove Existing Structures 0 LS 0.00 $0 02-220- INCLUDED
Remove Existing Utilities 0 LS 0.00 $0
~Remove Existing Paving 0 SF 0.00 $0
Remove Underground Rock 0 CY 0.00 $0
Other $0
Other 0 0.00 $0
Grading(Excavation,Backfill,Compaction)$83,605
Level / Grading / Excavation (Existing Soils)1 CY 70105.00 $70,105 02-315
Import Fill / Grading 0 CY 0.00
Export Spoils 0 CY 0.00 02-315 INCLUDED
Finish Grading 0 LS 0.00
Soil Stabilization 0 SF 0.00 02-315 INCLUDED
Soild & Concrete Testing 1 13500.00 $13,500
~Other 0 0.00 $0
Site Construction $182,891
~Concrete paving 1 SY $132,670.00 $132,670 02-750
~Concrete curbs / gutters 1 LF $8,960.00 $8,960 02-771
~Concrete walk-ways 1 SF $22,250.00 $22,250 02-775
~Asphalt paving 0 SY $0.00
~Lot striping / Powerwash 1 LS $1,500.00 $1,500 02-750
~Trash enclosure / concrete pad 0 EA $0.00 02-800
Yard lighting - footings / piping 1 EA $5,000.00 $5,000 02-700
Wheel stops 0 EA $0.00 INCLUDED
Misc. drainage / flumes / etc.0 LF $0.00
HC Signs, Hand Rails, Misc.1 LS $2,675.94 $2,676
Bollards 0 EA $0.00
Wood Fence - Cedar @ 6'0 LF $0.00
Retaining Wall(s) - Concrete @ 4'0 LF $0.00
Transformer Pad 1 EA $2,750.00 $2,750 02-760 & 02-580
Concrete Footing 0 LS $0.00
Electrical to OCB and Clearance Bar for lighting 0 LS $0.00
Curved wall behind Ext. MB & OCB 0 LS $0.00
EXPANSION CAULKING 1 LS $5,370.00 $5,370
~Bike Rack 1 EA $1,715.00 $1,715 02-871 2 EA
Utilities $131,775
~Water Meter/ Service Entrance 1 LF $48,000.00 $48,000 02-510 - 02-511
~Gas Service Entrance 0 LF $0.00
~Sanitary Sewer 1 LF $20,250.00 $20,250 02-530
Cleanouts 0 EA $0.00
~Grease trap 1 LS $10,000.00 $10,000 02-540
~Electrical Service / Transformer / Overhead 1 LF $48,896.00 $48,896 02-580
Telephone 0 LF $0.00 INCL
Storm Sewer 8"1 LF $4,629.00 $4,629 02-630
Storm Drain Inlet 1 EA $0.00 $0
Cable / Misc. Communications 0 LS $0.00
Backflow Preventer / Checkvalve 0 EA $0.00
Rock Trenching / Backfill 0 LF $0.00
Other 0 LS $0.00
~Other 0 $0.00
Landscape & Irrigation $67,975
Landscape / Irrigation 1 SF 66475.00 $66,475 02-900
Hydro Mulch 0 SF 0.00
SLEEVING 1 SF 1500.00 $1,500 02-900
~Other 0 0.00
Additional site work not covered $7,361
Termite Control LS 0.00
SWPP / CONSTRUCTION ENTRANCE 1 LS 7361.00 $7,361 02-370 - 02-371 01-001
Other 0 0.00 $0
Offsite - City Streets $0
~Concrete Sidewalks 0 SF 0.00
~Concrete Curb / Gutter 0 LF 0.00
~Concrete Paving / Aprons 0 SY 0.00 $0
~Asphalt Paving 0 SY 0.00 $0
~Traffic Lights / Access Control 0 LS 0.00 $0
Landscaping / Irrigation 0 SF 0.00 $0
Street Lighting / Power 0 LS 0.00 $0
Storm Drainage / Structures 0 LS 0.00 $0
Misc. Utility Installs / Relocation 0 LS 0.00 $0
Erosion Control 0 SF 0.00 $0
Detention / Retention 0 SF 0.00 $0
Traffic Control 0 LS 0.00 $0
~Other 0 LS 0.00
Offsite - Sanitary Sewer $0
~Sanitary Sewer Install / Relocation 0 LF 0.00 $0
Sanitary Sewer Manholes / Structures 0 EA 0.00 $0
Clean Outs / Misc. 0 EA 0.00 $0
Storm Sewer 0 0.00 $0
~Other 0 0.00 $0
Offsite - Water Supply $0
~Water Service Install / Relocation 0 LF 0.00 $0
Fire Hydrant (s)0 EA 0.00 $0
Water Meter(s)0 EA 0.00 $0
Horizontal Borings 0 LF 0.00 $0
Other 0 0.00 $0
~Other 0 0.00 $0
SITE COSTS SUB-TOTAL: $483,294
HAT CREEK BURGER COMPANY
150 West SH 121
Coppell, TX 75019
$0
SITE COSTS TOTAL: $587,536
0 $0
Proposal X Commitment
Jerry Kachel Builder, Inc.
General Contractor
Laura Lewis -Estimator
Signature
12/31/2019
Proposal Date