PA9702-LR000321CONCRETE COMPRE ,3IVE STRENGTH TES'
a division of ~r~ff~C!~ll
8901 Carpenter Frwy,, Suite #109
Dallas, Tex~ 75~7
DateofService: 03/13/2~ ReportNo.: 0006860 ReportDate
03/21/2~
Client No.: COPPELL Project No.: 94991118
Client: City of Co ~11 Proj~t: Cop~ll Aq~tic~ecrea~on C~
Attn: Bra~Reid 3~ Bl~k of Parkway Blvd
732 DeForest
Coppcll TX 75019 Cop~ll, Texa~rj. ~51
Services: Obtain samples of ~esh concrete at the placement l~ations, peffo~ required field test and cast
compresslye s~cngth samples.
PROJECT DATA
co~rrnAcxon: Hisaw & Assoc. MtX t.n.: 38
CONCRETE SUPPLIER: Nelson Brothers pLACEMENT DATE: 03/13/2000 UATCnTWm: 7:57am
PLANT: Lewisville TIME SAMELED: 8:45a111 n¥: Chris Eubanks
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear
STRENGTH: 4000 psi @ 28 Days TElVIPERATURE (F) - AIR 55 F CONCRETE: 63 F
SLXYMP: 5.0" Max TRUCK NO: 221 TICKET NO: 83001
AIR: N/A AIRCONTENT(%): N/A UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Running track.
ASTM C-172
ASTM C-39
SAMPLE LOCATION: Running track NW comer
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER MEASURED MAXIMUM COMERESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 6.00 03/20/2000 7 96820 3420
I 2 6.00 03/20/2000 7 100350 3550
Average 3490
1 3 6.00 04/10/2000 28
I 4 6.00 04/10/2000 28
Technician: Chris Eubanks Started: 7:00am Finished: 10:30am ~ ~gi~nring, Inc.
Report Distribution:
( 1 ) City of Coppell ( 1 ) City of Coppe II - Engineerin g
(1) Brinkhiy Sargent Architects (1) City of Coppell - Bldg. fusp. Paul D. Smith, P.E.
(l) Turner Engineers (I) City ofCoppell - Leisure Serv Dept Senior Project Engineer
(1) Hisaw & Associates
This repott is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.