Loading...
PA9702-LR000321CONCRETE COMPRE ,3IVE STRENGTH TES' a division of ~r~ff~C!~ll 8901 Carpenter Frwy,, Suite #109 Dallas, Tex~ 75~7 DateofService: 03/13/2~ ReportNo.: 0006860 ReportDate 03/21/2~ Client No.: COPPELL Project No.: 94991118 Client: City of Co ~11 Proj~t: Cop~ll Aq~tic~ecrea~on C~ Attn: Bra~Reid 3~ Bl~k of Parkway Blvd 732 DeForest Coppcll TX 75019 Cop~ll, Texa~rj. ~51 Services: Obtain samples of ~esh concrete at the placement l~ations, peffo~ required field test and cast compresslye s~cngth samples. PROJECT DATA co~rrnAcxon: Hisaw & Assoc. MtX t.n.: 38 CONCRETE SUPPLIER: Nelson Brothers pLACEMENT DATE: 03/13/2000 UATCnTWm: 7:57am PLANT: Lewisville TIME SAMELED: 8:45a111 n¥: Chris Eubanks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TElVIPERATURE (F) - AIR 55 F CONCRETE: 63 F SLXYMP: 5.0" Max TRUCK NO: 221 TICKET NO: 83001 AIR: N/A AIRCONTENT(%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Running track. ASTM C-172 ASTM C-39 SAMPLE LOCATION: Running track NW comer REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMERESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.00 03/20/2000 7 96820 3420 I 2 6.00 03/20/2000 7 100350 3550 Average 3490 1 3 6.00 04/10/2000 28 I 4 6.00 04/10/2000 28 Technician: Chris Eubanks Started: 7:00am Finished: 10:30am ~ ~gi~nring, Inc. Report Distribution: ( 1 ) City of Coppell ( 1 ) City of Coppe II - Engineerin g (1) Brinkhiy Sargent Architects (1) City of Coppell - Bldg. fusp. Paul D. Smith, P.E. (l) Turner Engineers (I) City ofCoppell - Leisure Serv Dept Senior Project Engineer (1) Hisaw & Associates This repott is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of I