Loading...
Spectrum-PT20110211/02/2020Scott Latta T N X. C I T T • O r COPPELL 4 A 6 t f UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE Page 4 of 4 Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name SPECTRUM Project Location / Applicant's Work Order # pt appBcable)PID 2472685 LOCATION : 740 MEADOWLARK LN Subcontractor Company Name ARCHEY WAY 24 hr.Contact Number 972-689-9282 Date of Verification Appointment Time of Verification Appointment INFORMATION BELOW TO BE COMPLETED BY CITY ❖Inspected by WORKS PERSONNEL of Utilities Maintenance Division on and found to be acceptable / not acceptable because Follow-up needed? C Yes C No Follow-up scheduled for ❖Inspected by of Streets Maintenance Division on and found to be acceptable / not acceptable because Follow-up needed? C Yes C No Follow-up scheduled for A copy of this completed notice can be provided to the address or e-mailed by using the button below: City of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570 Submit by E-mail Print Form