Loading...
Coppell Cross 1P-CS 980528PHIL BURLeSON 1933-1995 JONATHAN J. BATES PHIL BURLESON. JR SENATOR DAVID H. CAIN THOMAS L DAVIS TIMOTHY A DUFFY MICHAEL P GIBSON ALAN J. HOStEttER. P.C k(EllY H. k(OLB JAY J. MURRAY, P.C TOM PAPPAS JACk( C. PATE k(EMBLE WHITE of COUNSEL: RICHARD A ANDERSON BURLt~SON, PATt~ & GIBSON, L.L.P. ATTORNEYS AND COUNSELORS AT LAW A LIMITED LIABILITY PARTNERSHIP INCLUDING PROFESSIONAL CORPORATIONS May 28,1998 AKARD PLAZA BUILDING 2414 N. Ak(ARD, SUITE 700 DALLAS, TX 7EiE:OI TELEPHONE (E~ 14) 871-4900 FACSIMILE Jim Witt, City Manager City of Coppell P.O. Box 478 Dallas, Texas 75019 Mike Martin, Engineering Department City of Coppell P.O. Box 478 Dallas, Texas 75019 Greg Jones, Building Department City of Coppell P.O. Box 478 Dallas, Texas 75019 Travis Crump, Fire Marshall City of Coppell 500 Southwestern Blvd Coppell, Texas 75019 RE: Coppell Crossing; Request for permission to commence steel construction prior to completion of concrete; Request that as-built drawings delivered to City exclude a reproducible copy Gentlemen: This law firm represents Mockingbird Management Company and the Coppell Crossing Limited Partnerships. By this letter, formal written request is made to allow my client to commence steel construction prior to completion of fire lanes and parking lots and to request that my client not be required to deliver a reproducible copy of the as-built drawings. It is my understanding that the theory behind the City's requirement that all paving areas be completed prior to commencing steel construction is for the fighting of fires. We would request an exception based upon the following. The area to be paved is very large and will surround two May28,1998 Page 2 buildings to be built. My client proposes that it be allowed to frame the building using the columns, beams, and girders (all made of steel) concurrent with the ongoing utility work. My client will maintain an earthen fire lane at all times during this process pending completion of the poured concrete fire lane and parking lot. When the utility contractors are out of the way, the parking lot and fire lanes would be poured and completed prior to exterior gyprock rock and prior to any masonry put on the buildings. With respect to as-built drawings, my client does not want to facilitate a third party having such easy access to the proprietary trade secrets contained within such as-built drawings. My client has no problem in delivering as-built drawings to the City; however, it is my client's formal request that the requirement to deliver reproducible as-built drawings be waived. Thank you for your attention to this matter. Please do not hesitate to contact the undersigned or Mitchell Vexler at 940-241-2353 if you have any questions with regard to the matters raised by this correspondence. ~~ tlaomas L. ~avis -- TLD/rg cc: Mitchell Vexler