Loading...
Magnolia Fish-CS011217T H E C 1 T Y O F COPPELL ~ ~~ ~ r ~' -- o F x A s X 8 9 December 17, 2001 Phillip Barnett, P.E. Barnett Engineering, Inc. P.O. Box 2230 Weatherford, TX 76086 RE: Magnolia Fisheries Final Acceptance Dear Mr. Barnett: A final inspection of paving and utilities for the referenced project has been confirmed by representatives of the City of Coppell. The work performed on the above referenced project generally meets the guidelines and specifications of the City of Coppell that govern projects of this type. The as-built drawings have been received from the contractor. cc: Ken Griffin, Director of Engineering & Public Works Rhonda Brothers, Engineering Secretary Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal 2S5 PARKWAY * P. O.BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * fAX 972/304 3673