Loading...
Freeport NIP(7.5)-LR010910 GEOTECHNICAL AND J ENVlRONHENTAL CONSULTANTS REPORTED TO: CONC~D~ER TEST REPORT / ' Freeport 9 (~oppell Road at Bethel Road  Coppell, Texas Duke-Weeks Realty Co'ration /REPORT NO. 147 5495 Belt LineRoad, $,uite"e~.,''''~ REG PROJECT NO. 7888 Dallas, Texas 75240 SAMPLE DATE: 09-10-01 ATTN: Mr. Jeff Langston TECHNICIAN: R. Hollings CONTRACTOR: Butler Construction Location of Sample J SetNumberl J LocatiOnpanel: W-6 I Quantity Represented40/100 I Design Information Is°urce °f C°ncrete IPotter Mix Identification 9337 I Specified Strength P's'i' I 4000 Test Results No. ID Date Tested 1 2823 09-12-01 2823 09-17-01 2823 10-08-01 2823 10-08-01 J Age@ Total Load J Compressive J Average Test lbs. Strength p.s.i. Strength p.s.i. 2 105180 3720 7 13842O 4900 28 170580 6040 28 170730 6040 6O4O Cylinder Data JSet J No. I 1 Cylinder I Time of ID SlumpI Sample I Concrete Air Temp. Temp. 2823 5.00 7:50AM 63 Air Entrainment Ticket Number 70 3.6 614301 Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Butler Construction/Mr. David Husted (1) Pacheco Koch, Inc./Mr. Jack Evans (1) City of Coppel/Mr. Lee Stone (1) City of Coppel/Mr. Larry Davis (1) HBC Engineering/Mr. Bob Baker Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je 2424 STUTZ DR. ,* SUITE 400 ,, DALLAS, TX 75235 ,, TEL [214] 350 5600 * FAX [214] 350 0019 GEOTECHNICAL AND ~ J~J r-"l I i F~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston REPORT NO. 148 REG PROJECT NO. 7888 SAMPLE DATE: 09-10-01 TECHNICIAN: R. Hollings CONTRACTOR: Butler Construction Location of Sample Quantity Represented I S et Number I Location 1 Sidewalk: 5'S, 5'E of S.W. building corner 10/100 Design Information ISource of Concrete I Mix Identification I Specified Strength p.s.i. Potter 9349 3000 Test Results Set Cylinder I No. ID Date Tested 1 2824 09-17-01 2824 10-08-01 2824 11-08-01 2824 Hold Age @ Total Load I Compressive Average Test lbs.I Strength p.s.i. Strength p.s.i. 7 118040 4180 28 155000 5490 28 158190 5600 H 5550 Cylinder Data Set Cylinder I Time of ID SlumpJ Sample I ConcreteI Air I Ticket Air Temp. Temp. Entrainment Number 2824 5.00 10:00AM 76 75 3.8 614301 Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Butler Construction/Mr. David Husted (1) Pacheco Koch, Inc./Mr. Jack Evans (1) City of Coppel/Mr. Lee Stone (1) City of Coppel/Mr. Larry Davis (1) HBC Engineering/Mr. Bob Baker Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je 2424 STUTZ DR. * SUITE 400 * DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019