ST9601-LR 981013 TEAM CONSULTANTS, INC.
2970 S. Walton Walker, Suite 101 Dallas, Texas 7521 !
2 14/331-4395
Mr. Robert Caudill SUMMARY OF FIELD COMPACTION TESTS
Tiseo Paving DATE: 10/13/98 JOB TITLE: Wrangler Drive
PO Box 270040 REPORT NO: 35
Dallas, Texas 75227 JOB NO: 985142 Coppell
CONTRACTOR: Scava
FIELD COMPARISON
MATERIAL DESCRIPTION TEST TEST % OF
AND M C U D W M C U D W MAX.
NO. LOCA__TION CLASSIFICATION
5x3 Cuivert % c % c DENS. REM. ARKS
I. Sta. 32+50, 3.0' below surface Tan and brown calcareous clay 25. I 98.0 23.0 100.6 97.4 *
2. Sta. 35+00, 2.5' below surface Tan and brown calcareous clay 25.5 96.4 23.0 100.6 95.8 ·
3. Sta. 38+00, 2.5' below surface Tan and brown calcareous clay 25.3 96. l 23.0 100.6 95.5 *
4. Sta. 41+00, 2.5' below surface Dark brown sandy clay 24.0 93.2 24.2 94.7 98.4 *
REMARKS: * Meets specifications
Time On: 12:00
Time OFF: 1:30
Tech. Time: 1.5 hrs,
Trip Charge:
Iw SIGNS;'::
cc: City of Coppell/Larry Davis Larry Sneath, Technician