Westbury Manor-LR 991207FUGRO SOUTH, INC.
2880 virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
CLIENT:
PROJECT:
FIELD DENSrFY REPORT
Ryland Homes REPORT DATE: December 7, 1999
Westbury Manor, Coppell, Texas PROJECT NO.: 0781-2277
Page 1
DATE PERFORMED: November 29, 1999
Number
1
TEST
NO.
58
59
60
61
62
63
65
66
67
68
MOISTURE/DENSITY RELATION~
Material Proctor Results
Description Maximum Dry Density (pct) Optimum Moisture (%)
Dark brown and red tan calcareous sandy clay 104.7 19.4
TEST RESULTS
PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF
NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY
I 24 inch RCP storm, old line removal 99.6 20.1 95.1
backfill, station 3+30, final
1 24 inch RCP storm, new line backfill, 100.9 17.0 96.9
station 4+30, final
1 24 inch RCP storm, old line removal 99.0 23.2 99~
backfill, station 3+00, 4 feet below grade
1 24 inch RCP storm, old line removal 99.6 21.4 95;1
backfill, station 3+00, 2 feet below grade
1 24 inch RCP storm, new line backfill, 104.2 20.2 99.5
station 4+30, 4 feet below grade
1 24 inch RCP storm, new line backfill, 99.5 19.8 95.0
station 4+30, 2 feet below grade
1 27 inch RCP storm, new storm drain, 105.6 18.8 100.9
station 2+00, 4 feet below grade
I 27 inch RCP storm, new storm drain, 104.9 19.8 100.2
station 2+00, 2 feet below grade
1 27 inch RCP storm, new storm drain, 105.2 18.6 100.5
station 2+00, final
1 27 inch RCP storm, old storm drain 105.4 18.8 100.6
removal backfill, station 2+00, 4 feet
below grade
1 27 inch RCP storm, old storm drain 104.8 19.5 100.1
removal backfill, station 2+00, 2 feet
below grade
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 820-7328
CLIENT:
PROJECT:
FIELD DENSITY REPORT
Ryland Homes REPORT DATE: December 7, 1999
Westbury Manor, Coppell, Texas PROJECT NO.: 0781-2277
Page 2
DAYE PERFORMED: November 29, 1999
TEST
NO.
TEST RESULTS
PROCTOR LOCATION UNIT DRY
NO. WEIGHT
MOISTURE
CONTENT PERCENT
PERCENT OF
MAXIMUM DENSITY
69
Remarks:
1 27 inch RCP storm, old storm drain 103.2
removal backfill, station 2+00, final
All densities meet project specifications unless otherwise noted.
20.1
98.6
Mike Flute
Fugro South Technician
FUGRO SOUTH INC.
SMH/bg
Distribution:
Ryland Homes - Mark Gaines /
City of Coppell - Larry Davis/
Goodwin & Marshall - David Gregory
Site Concrete, Inc. - Melissa Uselding
Reviewed by: