Loading...
151 Coffee Addition-PT210420A copy of the approved permit must be on the job site at all times w' i7 ��� Page i of S CObFF�y;t�,RIGHT-GF-WAIF USE PERMIT APPLICATION Rev.08/2020 Permit Valid for 120 Days From Date of Approval h a i All activity authorized by this permit shall be in accordance with CHAPTER 283 of the Texas Local Government Code and the City of Coppell Public Rights -of -Way Management ordinance No. 2001-944 Date of Submittal: April 16, 2_021 Applicant's Job # / Work Order # 3484323 Project Name / Location and Address: 151 Denton Tap Rd . Permit Fee: $100.00 (No fee for applications submitted on behalf of Utility Companies with a current Public Rights -of -Way Management Ordinance Registration). S.P.C.O.A. Certificate # Utility Company Information: E] Oncor Electric Delivery [I Atmos Energy El Frontier 0 Spectrum El Level 3 0 Other: Utility Company Representative: Kym Teeters E-mail Address: kymberly.teeters@oncor.com Telephone: 9723238924 Contractor Information: General Contractor: Oncor General Contractor Representative: Kym Teeters E-mail Address: kymberly.teeters@oncor.com Telephone: 9727506595 Project Information: General Description of Proposed Construction (Attach Plan & Profile, See Page S for Example): Install pole and oh transformer to serve coffee shop; note the existing poles cant be utilized to serve this customer Estimated Start Date: April 30, 2021 Estimated Completion Date; May 15, 2021 Has 811 and/or utility companies been contacted 48 hours prior to locate existing utilities? Yes r_1 No M If No, state reason: Locates will be requested 48 hours prior to digging Is removal of existing streets, alleys or sidewalks necessary? Yes El Nom If YES, repair must have a City inspection prior to completion. Call 972-3043679. Is closure of any traffic lanes or driveway approaches necessary? Yes 0 NoEl If YES, a traffic control plan in accordance with TMUTCD standards must be submitted, and the following departments must be notified of the location and duration of the closure: Police Department, 972-304-3600 Fire Department, 972-304-3512 Street Department, 972-462-5150 Engineering Department, 972-304-3679 Traffic lane closures are allowed from 9:30 a.m until 3:30 p.m. ONLY unless otherwise approved by the City Engineer. --Work activity is permitted from 7:00 a.m. until 7:00 p.m., Monday through Friday only.-- Right of Way Use Permit Application Page 2 of 5 This application, with signatures of Utility and Contractor representatives, must be submitted to the Engineering Department for approval prior to commencing work. Printing your name and date on this form indicates your acceptance of the terms and conditions of this application. Applicant shall indemnify andforever hold harmless against the City of Coppell each and every claim, demand, or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granterk SIgnaturW of Utility Company Representative Signature of Contractor Representative D APPROVED City Representative ❑ DENIED Comments: 4-1�--)] Date Date 04/20/2021 Date E-mail address to return completed permit:�kymberly.teetersAoncor.com Submit permit application by e-mail to enginee cojppiglltx. qy, or deliver application to the Engineering Department, Town Center Business Park, 255 E Parkway Blvd, Coppell, TX 75019 SUMMARY OF REQUIREMENTS FOR WORK WITHIN THE CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS 1. A copy of the valid approved City of Coppell permit is required on the project site at all times. 2. Property owners (commercial and residential) adjacent to the project must be notified of the project timeline and provided contractor names and phone numbers. No access to private property without prior coordination with property owner. 3. Proper erosion control measures must be taken, in accordance with the Coppell Erosion Control Ordinance No. 91-514. 4. Follow Texas MUTCD standards for work in traffic zones. Lane closures require the use of a flashing arrow board for advance warning. 5. Grading shall be restored or improved, and sod replaced when necessary. Right of Way Use Permit Application Page 3 of 5 6. Irrigation repairs must be performed in a timely manner. 7. Follow OSHA trench safety guidelines at all times. 8. Repair existing utilities that are damaged, including but not limited to: Clean -outs, water valves, wastewater manholes, water lines, wastewater lines and storm sewer lines. 9. Density tests may be required, at applicant's expense, in trench lines (ASTM). 10. Protection and repair of traffic control devices and signage is the responsibility of the contractor. 11. No work is to be done in collector roadways before 9:30 a.m. or after 3:30 p.m. 12. Prior request of work activity on weekends and holidays must be submitted in writing. 13. Utility line locates must be performed in advance of construction by calling 811 or logging on to the Texas811 Portal at: http://www.texas8ll.oriz. Additional utility contacts are as follows: COPPELL PUBLIC WORKS - OPERATIONS COPPELL PUBLIC WORKS - ENGINEERING 972-462-5150 HOMEOWNER ASSOCIATIONS Planning Department: H.O.A. List F.E.M.A. 940-898-5399 DALLAS WATER UTILITIES 214-670-5111 AT&T 800-924-9420 COSERV Gas & Electric 940-321-7800 FRONTIER COMMUNICATIONS 800-584-3384 SPECTRUM CABLE 833-780-1880 972-304-3679 DENTON COUNTY LEVEE DISTRICT 972-315-5019 T.C.E.Q. Region 4 817-588-5800 IRVING WATER UTILITIES 972-721-2281 ATMOS ENERGY 888-286-6700 EXPLORER PIPELINE 918-493-5100 ONCOR ELECTRIC DELIVERY 888-313-6862 14. Debris must be removed from work area daily and disposed of properly outside the City. 15. Streets, sidewalks and alleys must be kept clear of construction materials and debris. 16. "Clean-up" requires returning work area to pre -construction condition or better. Right of Way Use Permit Application T }{ H • C I T V - O R COPPELL s COMPLETION VERIFICATION NOTICE Page 4 of 5 Contact Coppell Public Works Operations at 972/462-5150 to schedule an inspection with Utility and Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name: Project Location or Address: Sub -contractor Company Name: 24 hr. Contact Number: Date of Verification Appointment: Time: -INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL - Inspected by: of Utilities Maintenance Division on and found to be []acceptable, ❑not acceptable because: Follow-up needed? ❑No ❑ Yes, follow-up scheduled for: Inspected by: of Streets Maintenance Division on and found to be []acceptable, ❑not acceptable because: Follow-up needed? ❑No ❑ Yes, follow-up scheduled for: A copy of this completed notice can be e-mailed to the Coppell Public Works Operations Division, or delivered to the address below: City of Coppell Public Works Department, Operations Division 816 S. Coppell Road Coppell, TX 75019