Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Westbury Manor-LR 990401
FUGRO SOUTH, INC. 2880 Vino Lane; O~, Tax~ 75229 (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CUENT: Ryland Homes PROJECT: Westbury Manor, Coppell, Texas Report Date: April 1, 1999 Project No.: 0781-2277 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 70 CONCRETE TEMP. (°F) (As'r~ c-lo~4): 85 TIME BATCHED: 8:45 am TIME SAMPLED: 9:07 am WEATHER CONDITION: Cloudy LOCATION OF PLACEMENT: Site Concrete CONCRETE SUPPUER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (,~'"m c.,~1): WATER ADDED (g~l): SLUMP (in.) (ASTM C-t~): Castlebury, alley, station 5+30 Site Batch 8284 4.8 0 2.9 TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (l~i) (p~i) WMC 49 7 04/09/99 ,83000 2940 3600/2,8 da~s WMC 50 28 04/30/99 WMC 51 28 04130199 VVMC 52 Hold ' ' Fracture mode is (A) unless olhen~se noted Specifications: Making & ASTM C-31 T"tlng ASTM C'143, TYpesof [~ 1~ [~ I-'] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Jesse Blackstone Ryland Homes - Mark Gaines / City of Coppell - Larry Davis- Goodwin & Marshall - David Gregory Site Concrete, Inc. - Melissa Uselding FUGRO SOUTH INC. Reviewed By: ~ ~ FUGRO SOUTH, INC. 2880 V1rgo Lane; Dallas, Texa~ 75229 Ph (972) 484-8301; ;ax (972) 620-7328 CLIENT: PROJECT: .... DATE PERFORMED: March 23, 1999 Contractor~ on Site: site Concrete Remarks: LIME STABILIZED SOIL PULVERIZATION REPORT Ryiend Homes REPORT DATE: Apr~ 1, 1999 Westbury Manor, Copl~, Texas PROJECT NO: 0781-2277 Pulverization/Gradation tests w~ i:~rform~. Loc~tions and results are listed below:. LIME STABILIZED SOIL PULVERIZATION TEST RESULTS Percent Passing Percent Passing . Location 1 3/4" Sieve ~4 Sieve London Way, Station 12+00 100 70 London Way, Station 9+00 100 69 London Way, Station 6+00 100 68 London Way, Station 3+00 100 71 London Way, North Alley 100 64 London Way, South Alley 100 66 Project Requirements: Minimum 100% Minimum 60% SPECIFICATIONS: SDHPT Item 260.4 (1972) ~4 Sieve SDHPT Item 260.4 (1982X3/4" Sieve Mike Flute Fugro South Technician FUGRO SOUTH, INC. Reviewed By:~ SMH/kp Distribution: Ryland Homes - Mark Gaines City of Coppeil - Larry Davis Goodwin & Marshall - David Gregory Site Concrete, Inc. - Metissa Useiding FUGRO SOUTH, INC. 2880 Virgo La,~; Dallas, T~xii 75229 Ph (972) 484-8301; Fax (972) 620-7326 LIME STABILIZED SOIL PULVERIZATION REPORT CLIENT: PROJECT: Rytend Homes REPORT DATE: April 1, 1999 Westbury Manor, Coppell, Texas PROJECT NO: 0781-2277 DATE PERFORMI;D: March' 24, 1999 . Contractors on Site: Site Concrete Remarks: Pulverization/Gradation tests were performed. Locations and results are listed below: LIME STABILIZED SOIL PULVERIZATION TEST RESULTS Percent Passing Percent Passing L_nc~__f_ion I 3/4" Sieve #4 Sieve 1 Westbury Ct., Station 1+00 2 Westbury Dr., Station 1+00 3 Westbury Dr., Station 4+50 Project Requirements: 100 68 100 67 100 67 Minimum 100% Minimum 60% SPECIFICATIONS: SDHPT Item 260.4 (1972) #4 Sieve SDHPT Item 260.4 (1982)[3/4" Sieve Mike Flute Fugro South Technician FUGRO SOUTH, INC. Reviewed By: ~ ~'~~ SMH/kp Disl]'ibufion: Ryland Homes - Mark Gaines ,/- City of Coppell - Larry Davis Goodwin & Marshall - David Gregory Site Concrete, Inc. - Melissa Uselding