Loading...
Cotton Belt-PN210426A copy of the approved permit must be on the job site at all times Page 1 of 5RIGHT-OF-WAY USE PERMIT APPLICATION Rev.08/2020 Permit Valid for 120 Days From Date of Approval All activity authorized by this permit shall be in accordance with CHAPTER 283 of the Texas Local Government Code and the City of Coppell Public Rights-of-Way Management ordinance No. 2001-944 Date of Submittal:__________________ Applicant’s Job # / Work Order #_____________________ Project Name / Location and Address:__________________________________________________ Permit Fee: $100.00 (No fee for applications submitted on behalf of Utility Companies with a current Public Rights-of-Way Management Ordinance Registration). S.P.C.O.A. Certificate # ____________________ Utility Company Information: Oncor Electric Delivery Atmos Energy Frontier Spectrum Level 3 Other:________________________________________________________ Utility Company Representative:____________________________________________________ E-mail Address:__________________________________Telephone:______________________ Contractor Information: General Contractor:______________________________________________________________ General Contractor Representative:_________________________________________________ E-mail Address:__________________________________Telephone:______________________ Project Information: General Description of Proposed Construction (Attach Plan & Profile, See Page 5 for Example): Estimated Start Date:_______________ Estimated Completion Date:_________________ Has 811 and/or utility companies been contacted 48 hours prior to locate existing utilities? Yes No If No, state reason:_________________________________________________ Is removal of existing streets, alleys or sidewalks necessary? Yes No If YES, repair must have a City inspection prior to completion. Call 972-304-3679. Is closure of any traffic lanes or driveway approaches necessary? Yes No If YES, a traffic control plan in accordance with TMUTCD standards must be submitted, and the following departments must be notified of the location and duration of the closure: Police Department, 972-304-3600 Fire Department, 972-304-3512 Street Department, 972-462-5150 Engineering Department, 972-304-3679 Traffic lane closures are allowed from 9:30 a.m until 3:30 p.m. ONLY unless otherwise approved by the City Engineer. --Work activity is permitted from 7:00 a.m. until 7:00 p.m., Monday through Friday only.-- Right of Way Use Permit Application Page 2 of 5 This application, with signatures of Utility and Contractor representatives, must be submitted to the Engineering Department for approval prior to commencing work. Printing your name and date on this form indicates your acceptance of the terms and conditions of this application. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand, or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. ________________________________________ ___________________________________ Signature of Utility Company Representative Date ________________________________________ ___________________________________ Signature of Contractor Representative Date ________________________________________ ___________________________________ APPROVED City Representative Date DENIED Comments: E-mail address to return completed permit:__________________________________________________ Submit permit application by e-mail to engineer@coppelltx.gov, or deliver application to the Engineering Department, Town Center Business Park, 265 E Parkway Blvd, Coppell, TX 75019 SUMMARY OF REQUIREMENTS FOR WORK WITHIN THE CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS 1.A copy of the valid approved City of Coppell permit is required on the project site at all times. 2.Property owners (commercial and residential) adjacent to the project must be notified of the project timeline and provided contractor names and phone numbers. No access to private property without prior coordination with property owner. 3.Proper erosion control measures must be taken, in accordance with the Coppell Erosion Control Ordinance No. 91-514. 4.Follow Texas MUTCD standards for work in traffic zones. Lane closures require the use of a flashing arrow board for advance warning. 5.Grading shall be restored or improved, and sod replaced when necessary. 04/26/2021Scott Latta X Please contact City of Coppell Public Works Operations at 972-462-5150 to coordinate relocation of the Coppell 15" sanitary sewer line. Right of Way Use Permit Application Page 3 of 5 6.Irrigation repairs must be performed in a timely manner. 7.Follow OSHA trench safety guidelines at all times. 8.Repair existing utilities that are damaged, including but not limited to: Clean-outs, water valves, wastewater manholes, water lines, wastewater lines and storm sewer lines. 9. Density tests may be required, at applicant’s expense, in trench lines (ASTM). 10.Protection and repair of traffic control devices and signage is the responsibility of the contractor. 11.No work is to be done in collector roadways before 9:30 a.m. or after 3:30 p.m. 12.Prior request of work activity on weekends and holidays must be submitted in writing. 13.Utility line locates must be performed in advance of construction by calling 811 or logging on to the Texas811 Portal at: http://www.texas811.org. Additional utility contacts are as follows: COPPELL PUBLIC WORKS - OPERATIONS COPPELL PUBLIC WORKS - ENGINEERING 972-304-3679 DENTON COUNTY LEVEE DISTRICT 972-315-5019 T.C.E.Q. Region 4 817-588-5800 IRVING WATER UTILITIES 972-721-2281 ATMOS ENERGY 888-286-6700 EXPLORER PIPELINE 918-493-5100 ONCOR ELECTRIC DELIVERY 888-313-6862 972-462-5150 HOMEOWNER ASSOCIATIONS Planning Department: H.O.A. List F.E.M.A. 940-898-5399 DALLAS WATER UTILITIES 214-670-5111 AT&T 800-924-9420 COSERV Gas & Electric 940-321-7800 FRONTIER COMMUNICATIONS 800-584-3384 SPECTRUM CABLE 833-780-1880 14. Debris must be removed from work area daily and disposed of properly outside the City. 15.Streets, sidewalks and alleys must be kept clear of construction materials and debris. 16.“Clean-up” requires returning work area to pre-construction condition or better. Right of Way Use Permit Application Page 4 of 5 Contact Coppell Public Works Operations at 972/462-5150 to schedule an inspection with Utility and Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name:___________________________________________________________ Project Location or Address:_______________________________________________________ Sub-contractor Company Name:____________________________________________________ 24 hr. Contact Number:____________________________________________________________ Date of Verification Appointment:_________________________ Time:____________________ -INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL- Inspected by:_________________ of Utilities Maintenance Division on _______________ and found to be acceptable, not acceptable because:___________________________ Follow-up needed? No Yes, follow-up scheduled for:__________________________ Inspected by:__________________ of Streets Maintenance Division on _______________ and found to be acceptable, not acceptable because:___________________________ Follow-up needed? No Yes, follow-up scheduled for:__________________________ A copy of this completed notice can be e-mailed to the Coppell Public Works Operations Division, or delivered to the address below: City of Coppell Public Works Department, Operations Division 816 S. Coppell Road Coppell, TX 75019 COMPLETION VERIFICATION NOTICE Lane Closure Request Form For City permit reasons, please turn in request 3 weeks prior to implementation (TxDOT ROW approval may take 4 to 7 weeks) Date of request 1/28/2021 Contact Person / Phone number Hunter Lord 972-921-2616 City where work will be performed Coppell Location and cross street South Belt Line Rd Lanes to be closed (right, left, full) NB Right Lane Implementation Date(s) and Times (Start / End) 2/15/2021 7:00 – 5:00 Scope of Work Utility Relocation at S Belt Line Rd Additional Information Please attach a Google Earth photo with your work limits Return completed request form to Sid Mehta (MOT Engineer) smehta@herzog.com (469) 771-8498 Arrow Board ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 END ROAD WORK G20-2CW20-5RRIGHT LANE CLOSED ROAD WORK AHEADCW20-1DROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 END ROAD WORK G20-2 ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 END ROAD WORK G20-2CW20-5RRIGHT LANE CLOSED ROAD WORK AHEADCW20-1D540ft Taper 120ft400ft Buffer 960ft Work Zone 320ft 400ft120ft 400ft320ft 120ftROAD WORK AHEADCW20-1D120ft320ft 320ftSIDEWALKCLOSEDSIDEWALKCLOSEDType 1 Type 2 Type 3 Phase 1 Sheet 1 Hamilton Duffy, PC Consulting Tex Reg F-5260 85ft Buffer120ft 245ft Taper 320ft Taper 170ft Buffer240ft 400ft 415ft Buffer 720ft Taper 780ft Taper Arrow Board MB Part A 50ft Work Zone 100ft Work Zone 150ft Work Zone 200ft Work Zone 250ft Work Zone 300ft Work Zone 350ft Work Zone 400ft Work Zone 450ft Work Zone 500ft Work Zone 1000ft Work Zone 1500ft Work Zone RIGHT LANE MUST EXIT R3-33R LEFT LANE MUST EXIT R3-33L ONLYONLY STOP HERE ON RED ONLYONLY ONLYONLYONLYONLYONLY Navigator ONLYONLY ONLY ONLYONLYONLYONLY ONLYONLY Navigator Type 3 Barricade Navigator Type 3 Barricade Type 1 Barricade Navigators Type 3 Barricade 2-Way Traffic Vertical Panel Type 3 Barricade Barrels Type 3 Barricade Barrels Type 3 Barricade 2-Way Traffic Vertical Panel Barrels Type 3 Barricade Type 1 Barricade Navigator Type 3 Barricade Type 2 Barricade Type 1 Barricade Barrels Type 3 Barricade Type 2 Barricade Type 1 Barricade Navigator Type 3 Barricade Type 2 Barricade Barrels Type 3 Barricade Type 2 Barricade ONLY ROAD CLOSED TO THRU TRAFFIC TYPE III R11-2 ROAD CLOSED ROAD CLOSED TO THRU TRAFFIC ROAD CLOSED TYPE III R11-2 / CW1-7 ROAD CLOSED DETOUR TYPE III R11-2 / M4-10R ROAD CLOSED DETOUR TYPE III R11-2 / M4-10L DETOUR TYPE III R11-4 / M4-10R ROAD CLOSED TO THRU TRAFFIC DETOUR TYPE III R11-4 / M4-10L ROAD CLOSED TO THRU TRAFFIC RAMP CLOSED ROAD CLOSED SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE 100ft Taper 100ft Buffer 90ft Shifting Taper 100ft 1000ft 1600ft 85ft SIDEWALK CLOSED 600ft Taper 280ft Buffer 180ft Taper 540ft Taper 660ft Taper 160ft 320ft 120ft Buffer 220ft Buffer 335ft Buffer 500ft 700ft485ft Buffer 900ft 600ft 800ft 585ft Buffer 840ft Taper 900ft Taper 720ft Buffer N EW S xxft Shoulder Taper xx 30 180 85 120 Speed Taper Buffer Sign Spacing 35 40 45 50 245 320 540 600 120 170 220 280 160 240 320 400 55 660 335 500 60 720 415 600 65 780 485 700 70 840 585 800 75 900 720 900 Devices spaced on 35ft centers Posted speed limit 45MPH Devices spaced on 25ft centers Posted speed limit 35MPH Devices spaced on 30ft centers Posted speed limit 40MP H Devices spaced on 40ft centers Posted speed limit 50MPH Devices spaced on 20ft centers Posted speed limit 30MPH Devices spaced on 45ft centers Posted speed limit 55MPH Devices spaced on 50ft centers Posted speed limit 60MPH Devices spaced on 55ft centers Posted speed limit 65MPH Devices spaced on 60ft centers Posted speed limit 70MPH Devices spaced on 65ft centers Posted speed limit 75MPH Devices spaced on 70ft centers Posted speed limit 80MPH KEEP RIGHT RIGHT LANE MUST TURN RIGHT R3-7R NOTE: Changes requested by Contractor do not conform to TXDOT/MUTCD standards. Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control. LEFT LANE MUST TURN LEFT R3-7L SIDEWALK CLOSED USE OTHER SIDE 1000ft 1/2 MILE 1 MILE NOTE: Plan design based on engineered stamped plans provided by Contractor does not conform to TXDOT/MUTCD standards. Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control. Type 2 Barricade Navigators Type 3 Barricade Water Barrier Type 1 Barricade Barrels Type 3 Barricade Water Barrier Navigators Type 3 Barricade Flagger w/Cones Barrels Type 3 Barricade Flagger w/Cones NOTE: Plan requested by Contractor may not conform to TXDOT/MUTCD standards. Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control. ALLEY CLOSED TO THRU TRAFFIC TYPE III R11-2 ALLEY CLOSED Chris Schreiner Eddie Harmon Jason Garrett Marie Rhom Keith Hamilton Lauren Simpson Tony Troxclair Lindsay Garrett Jessica Paredes Mike Moreno Lacey Green Daniel Barron Matt Sauer Dustin Rawlings Jeremiah Keys ROAD CLOSED TO THRU TRAFFICNEWS Cole Benton SIDEWALK CLOSED USE OTHER SIDE TO BE PLACED AT DO NOT PASS DO NOT DRIVE ON SHOULDER Michael Cooper Kevin Omachel Matt Smith Devan Diviney Benjamin Masters Barrels SIDEWALK CLOSED Chris Blum General Notes: 1. Contractor shall be responsible to maintain traffic control as set forth in the Texas Manual on Uniform Traffic Control Devices for Streets and Highways. 2. Lanes may be closed to traffic during 9 AM-4 PM only after prior approval. 3. Accessible pedestrian routes shall be maintained at all times. 4. Contractor shall contact the City of Plano Project Manager or the Traffic Management Center at least one week prior to lane closing if left turns from opposite directions cannot go together anytime due to road or utility work at a signalized intersection.Special RulesPlano-Double-up Signs-Add General NotesDallas-Intersections Count As Buffer-No “End Road Work”Fort Worth-”1 Block Rule”-Arrow Board 40MPH+Richardson -Sign Sequence (RWA, LCA, LEML/R)MatchlineStreet NameALL TRAFFIC MUST EXIT 2600ft PRELIMINARY FOR REVIEW ONLY PE NO. DATE KEITH M. HAMILTON 87384 XX/XX/2019 Christian Lopez xx YOUR SPEED XX Radar Trailer MB SZ Q-Lynx 2L Rule-On freeways, buffer spaces shall be 2x the length of the Taper. “Diamond” rule for Crossovers -On the diamonds made to push traffic back over from a 2-way application, the spacing is to be a 1/2L taper length 1/2L MatchlineCITY: CONTRACTOR: JOB NAME: Coppell S Belt Line Rd & Southwestern Blvd One Global Telecom Right Lane Closure All Traffic Control Plans (TCPs) are the property of Buyers Barricades, Inc. and are included with Buyers Barricades rental agreements. Traffic Control Plans issued without a rental agreement will be charged to the customer. THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM THE REQUIREMENTS SET FORTH BY RELATED CONTRACT DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) OR THE OVERALL RESPONSIBILITY TO TRAFFIC CONTROL SAFETY. NOTESSALESMAN EXECUTIVE TCP DESIGNER LEGEND SCOPE OF WORK: LOCATION: CONTACT NUMBER: CONTACT: DATE: 469-992-9411 01/26/2021 Harley Garrison SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSEDRumble Strips Crash Truck/TMA Water Barrier Concrete Barrier *** *** ROADWORKAHEADCW20-1DCW20-5RRIGHTLANECLOSED CW20-5DLLEFTLANECLOSEDAHEAD RIGHTLANECLOSEDAHEADCW20-5DRTURNLANECLOSEDCW20-5TCENTERLANECLOSEDCW20-5CROADCLOSEDAHEADCW20-3DDETOURAHEADCW20-2DONE LANEROADAHEADCW20-4DBEPREPAREDTOSTOPCW3-4CW20-7LANE ENDSMERGERIGHTCW9-2TRLANE ENDSMERGELEFTCW9-2TL2RIGHT LANESCLOSEDCW20-5aTRSHOULDERWORKCW21-5ROADNARROWSCW5-1TRUCKSENTERINGROADWAYCW27-1TCW3-2CW4-3RCW4-3LCW21-1aT CW1-4LCW1-4RCW6-3CW12-1CW12-1CW12-1ENDROAD WORKG20-2ENDROAD WORKG20-2CW20-5LLEFTLANECLOSEDTOONCOMINGTRAFFICR1-2YIELDR1-2 APSTOPR1-1R5-1YIELDR1-2WRONGWAYR5-1a G20-1bR NEXT MILESXXROAD WORK ONE WAYR6-1L ONE WAYR6-1RCW1-7DETOURM4-10L DETOURM4-10RNAMEADDRESSCITYSTATECONTRACTORG20-6TBEGINROAD WORKNEXT X MILESG20-T ROADCLOSEDR11-2R11-3ROAD CLOSEDAHEADLOCAL TRAFFIC ONLYROAD CLOSEDTOTHRU TRAFFICR11-4****LOOSEGRAVELCW8-7FRESHOILCW21-2TURNLANECLOSEDAHEADCW20-5DTCENTERLANECLOSEDAHEADCW20-5DCCW28-1TPOWER LINESCW23-2NEWTRAFFICPATTERNAHEADUTILITYWORKAHEADCW21-7DWORK ZONE30WHEN WORKERS ARE PRESENT WORK ZONETRAFFIC FINES DOUBLE TALK OR TEXT LATERSTAY ALERTG20-10T M4-9SM4-9L M4-9RR3-2R3-1 PR8-3R5-2R3-4G20-1bL NEXT MILESXXROAD WORK INTERSTATETEXAS**ONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LCONSTRUCTIONENTRANCE**M4-9RM4-9L RAMPCLOSEDAHEADCW20-3DSLOW ALLEYCLOSEDAHEAD2RIGHT LANESCLOSED1/2 MILECW20-5aTR2LEFT LANESCLOSEDCW20-5aTLSPECIALEVENTAHEADTHRUTRAFFICMERGELEFTTHRUTRAFFICMERGERIGHT RUMBLESTRIPS ENDWORK ZONEG20-2ENDWORK ZONEG20-2CW3-3CW3-1FRWYCLOSEDAHEADCW20FY-3D CW1-4L CW1-4RTORAMPR1-2YIELD NEXT MILESXXROAD WORK NEXT MILESXX Jessica Garcia Eric Putnam Crystal Quintero Connor Siemers CROSSWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE CROSSWALK CLOSED CROSSWALK CLOSED USE OTHER SIDE Sheet 1 Devices spaced on 35ft centers Posted speed limit 45MPH Alex Thlang S Belt Line Rd & Southwestern Blvd Navigator Type 3 Barricade Type 2 Barricade Hector Gonzalez MatchlineBelt Line Rd Bullock St Southwestern Blvd Arrow Board ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 END ROAD WORK G20-2CW20-5RRIGHT LANE CLOSED ROAD WORK AHEADCW20-1DROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 END ROAD WORK G20-2 ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 END ROAD WORK G20-2CW20-5RRIGHT LANE CLOSED ROAD WORK AHEADCW20-1D540ft Taper 120ft400ft Buffer 960ft Work Zone 320ft 400ft120ft400ft 320ft 120ftROAD WORK AHEADCW20-1D120ft320ft 320ftSIDEWALKCLOSEDSIDEWALKCLOSED Type 1 Type 2 Type 3 Phase 1 Sheet 1 Hamilton Duffy, PC Consulting Tex Reg F-5260 85ft Buffer120ft 245ft Taper 320ft Taper 170ft Buffer240ft 400ft 415ft Buffer 720ft Taper 780ft Taper Arrow Board MB Part A 50ft Work Zone 100ft Work Zone 150ft Work Zone 200ft Work Zone 250ft Work Zone 300ft Work Zone 350ft Work Zone 400ft Work Zone 450ft Work Zone 500ft Work Zone 1000ft Work Zone 1500ft Work Zone RIGHT LANE MUST EXIT R3-33R LEFT LANE MUST EXIT R3-33L ONLYONLY STOP HERE ON RED ONLYONLY ONLYONLYONLYONLYONLY Navigator ONLYONLY ONLY ONLYONLYONLYONLY ONLYONLY Navigator Type 3 Barricade Navigator Type 3 Barricade Type 1 Barricade Navigators Type 3 Barricade 2-Way Traffic Vertical Panel Type 3 Barricade Barrels Type 3 Barricade Barrels Type 3 Barricade 2-Way Traffic Vertical Panel Barrels Type 3 Barricade Type 1 Barricade Navigator Type 3 Barricade Type 2 Barricade Type 1 Barricade Barrels Type 3 Barricade Type 2 Barricade Type 1 Barricade Navigator Type 3 Barricade Type 2 Barricade Barrels Type 3 Barricade Type 2 Barricade ONLY ROAD CLOSED TO THRU TRAFFIC TYPE III R11-2 ROAD CLOSED ROAD CLOSED TO THRU TRAFFIC ROAD CLOSED TYPE III R11-2 / CW1-7 ROAD CLOSED DETOUR TYPE III R11-2 / M4-10R ROAD CLOSED DETOUR TYPE III R11-2 / M4-10L DETOUR TYPE III R11-4 / M4-10R ROAD CLOSED TO THRU TRAFFIC DETOUR TYPE III R11-4 / M4-10L ROAD CLOSED TO THRU TRAFFIC RAMP CLOSED ROAD CLOSED SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE 100ft Taper 100ft Buffer 90ft Shifting Taper 100ft 1000ft 1600ft 85ft SIDEWALK CLOSED 600ft Taper 280ft Buffer 180ft Taper 540ft Taper 660ft Taper 160ft 320ft 120ft Buffer 220ft Buffer 335ft Buffer 500ft 700ft485ft Buffer 900ft 600ft 800ft 585ft Buffer 840ft Taper 900ft Taper 720ft Buffer N EW S xxft Shoulder Taper xx 30 180 85 120 Speed Taper Buffer Sign Spacing 35 40 45 50 245 320 540 600 120 170 220 280 160 240 320 400 55 660 335 500 60 720 415 600 65 780 485 700 70 840 585 800 75 900 720 900 Devices spaced on 35ft centers Posted speed limit 45MPH Devices spaced on 25ft centers Posted speed limit 35MPH Devices spaced on 30ft centers Posted speed limit 40MP H Devices spaced on 40ft centers Posted speed limit 50MPH Devices spaced on 20ft centers Posted speed limit 30MPH Devices spaced on 45ft centers Posted speed limit 55MPH Devices spaced on 50ft centers Posted speed limit 60MPH Devices spaced on 55ft centers Posted speed limit 65MPH Devices spaced on 60ft centers Posted speed limit 70MPH Devices spaced on 65ft centers Posted speed limit 75MPH Devices spaced on 70ft centers Posted speed limit 80MPH KEEP RIGHT RIGHT LANE MUST TURN RIGHT R3-7R NOTE: Changes requested by Contractor do not conform to TXDOT/MUTCD standards. Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control. LEFT LANE MUST TURN LEFT R3-7L SIDEWALK CLOSED USE OTHER SIDE 1000ft 1/2 MILE 1 MILE NOTE: Plan design based on engineered stamped plans provided by Contractor does not conform to TXDOT/MUTCD standards. Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control. Type 2 Barricade Navigators Type 3 Barricade Water Barrier Type 1 Barricade Barrels Type 3 Barricade Water Barrier Navigators Type 3 Barricade Flagger w/Cones Barrels Type 3 Barricade Flagger w/Cones NOTE: Plan requested by Contractor may not conform to TXDOT/MUTCD standards. Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control. ALLEY CLOSED TO THRU TRAFFIC TYPE III R11-2 ALLEY CLOSED Chris Schreiner Eddie Harmon Jason Garrett Marie Rhom Keith Hamilton Lauren Simpson Tony Troxclair Lindsay Garrett Jessica Paredes Mike Moreno Lacey Green Daniel Barron Matt Sauer Dustin Rawlings Jeremiah Keys ROAD CLOSED TO THRU TRAFFICNEWS Cole Benton SIDEWALK CLOSED USE OTHER SIDE TO BE PLACED AT DO NOT PASS DO NOT DRIVE ON SHOULDER Michael Cooper Kevin Omachel Matt Smith Devan Diviney Benjamin Masters Barrels SIDEWALK CLOSED Chris Blum General Notes: 1. Contractor shall be responsible to maintain traffic control as set forth in the Texas Manual on Uniform Traffic Control Devices for Streets and Highways. 2. Lanes may be closed to traffic during 9 AM-4 PM only after prior approval. 3. Accessible pedestrian routes shall be maintained at all times. 4. Contractor shall contact the City of Plano Project Manager or the Traffic Management Center at least one week prior to lane closing if left turns from opposite directions cannot go together anytime due to road or utility work at a signalized intersection.Special RulesPlano-Double-up Signs-Add General NotesDallas-Intersections Count As Buffer-No “End Road Work”Fort Worth-”1 Block Rule”-Arrow Board 40MPH+Richardson -Sign Sequence (RWA, LCA, LEML/R)MatchlineStreet NameALL TRAFFIC MUST EXIT 2600ft PRELIMINARY FOR REVIEW ONLY PE NO. DATE KEITH M. HAMILTON 87384 XX/XX/2019 Christian Lopez xx YOUR SPEED XX Radar Trailer MB SZ Q-Lynx 2L Rule-On freeways, buffer spaces shall be 2x the length of the Taper. “Diamond” rule for Crossovers -On the diamonds made to push traffic back over from a 2-way application, the spacing is to be a 1/2L taper length 1/2L MatchlineCITY: CONTRACTOR: JOB NAME: Coppell S Belt Line Rd & Southwestern Blvd One Global Telecom Right Lane Closure All Traffic Control Plans (TCPs) are the property of Buyers Barricades, Inc. and are included with Buyers Barricades rental agreements. Traffic Control Plans issued without a rental agreement will be charged to the customer. THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM THE REQUIREMENTS SET FORTH BY RELATED CONTRACT DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) OR THE OVERALL RESPONSIBILITY TO TRAFFIC CONTROL SAFETY. NOTESSALESMAN EXECUTIVE TCP DESIGNER LEGEND SCOPE OF WORK: LOCATION: CONTACT NUMBER: CONTACT: DATE: 469-992-9411 01/26/2021 Harley Garrison SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSEDRumble Strips Crash Truck/TMA Water Barrier Concrete Barrier *** *** ROADWORKAHEADCW20-1DCW20-5RRIGHTLANECLOSED CW20-5DLLEFTLANECLOSEDAHEAD RIGHTLANECLOSEDAHEADCW20-5DRTURNLANECLOSEDCW20-5TCENTERLANECLOSEDCW20-5CROADCLOSEDAHEADCW20-3DDETOURAHEADCW20-2DONE LANEROADAHEADCW20-4DBEPREPAREDTOSTOPCW3-4CW20-7LANE ENDSMERGERIGHTCW9-2TRLANE ENDSMERGELEFTCW9-2TL2RIGHT LANESCLOSEDCW20-5aTRSHOULDERWORKCW21-5ROADNARROWSCW5-1TRUCKSENTERINGROADWAYCW27-1TCW3-2CW4-3RCW4-3LCW21-1aT CW1-4LCW1-4RCW6-3CW12-1CW12-1CW12-1ENDROAD WORKG20-2ENDROAD WORKG20-2CW20-5LLEFTLANECLOSEDTOONCOMINGTRAFFICR1-2YIELDR1-2 APSTOPR1-1R5-1YIELDR1-2WRONGWAYR5-1a G20-1bR NEXT MILESXXROAD WORK ONE WAYR6-1L ONE WAYR6-1RCW1-7DETOURM4-10L DETOURM4-10RNAMEADDRESSCITYSTATECONTRACTORG20-6TBEGINROAD WORKNEXT X MILESG20-T ROADCLOSEDR11-2R11-3ROAD CLOSEDAHEADLOCAL TRAFFIC ONLYROAD CLOSEDTOTHRU TRAFFICR11-4****LOOSEGRAVELCW8-7FRESHOILCW21-2TURNLANECLOSEDAHEADCW20-5DTCENTERLANECLOSEDAHEADCW20-5DCCW28-1TPOWER LINESCW23-2NEWTRAFFICPATTERNAHEADUTILITYWORKAHEADCW21-7DWORK ZONE30WHEN WORKERS ARE PRESENT WORK ZONETRAFFIC FINES DOUBLE TALK OR TEXT LATERSTAY ALERTG20-10T M4-9SM4-9L M4-9RR3-2R3-1 PR8-3R5-2R3-4G20-1bL NEXT MILESXXROAD WORK INTERSTATETEXAS**ONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LCONSTRUCTIONENTRANCE**M4-9RM4-9L RAMPCLOSEDAHEADCW20-3DSLOW ALLEYCLOSEDAHEAD2RIGHT LANESCLOSED1/2 MILECW20-5aTR2LEFT LANESCLOSEDCW20-5aTLSPECIALEVENTAHEADTHRUTRAFFICMERGELEFTTHRUTRAFFICMERGERIGHT RUMBLESTRIPS ENDWORK ZONEG20-2ENDWORK ZONEG20-2CW3-3CW3-1FRWYCLOSEDAHEADCW20FY-3D CW1-4L CW1-4RTORAMPR1-2YIELD NEXT MILESXXROAD WORK NEXT MILESXX Jessica Garcia Eric Putnam Crystal Quintero Connor Siemers CROSSWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE CROSSWALK CLOSED CROSSWALK CLOSED USE OTHER SIDE Sheet 2 Devices spaced on 35ft centers Posted speed limit 45MPH Alex Thlang S Belt Line Rd & Southwestern Blvd Navigator Type 3 Barricade Type 2 Barricade Hector GonzalezMatchline Belt Line Rd Airline DrOlympus Blvd A copy of the approved permit must be on the job site at all times Page 1 of 5RIGHT-OF-WAY USE PERMIT APPLICATION Rev.08/2020 Permit Valid for 120 Days From Date of Approval All activity authorized by this permit shall be in accordance with CHAPTER 283 of the Texas Local Government Code and the City of Coppell Public Rights-of-Way Management ordinance No. 2001-944 Date of Submittal:__________________ Applicant’s Job # / Work Order #_____________________ Project Name / Location and Address:__________________________________________________ Permit Fee: $100.00 (No fee for applications submitted on behalf of Utility Companies with a current Public Rights-of-Way Management Ordinance Registration). S.P.C.O.A. Certificate # ____________________ Utility Company Information: Oncor Electric Delivery Atmos Energy Frontier Spectrum Level 3 Other:________________________________________________________ Utility Company Representative:____________________________________________________ E-mail Address:__________________________________Telephone:______________________ Contractor Information: General Contractor:______________________________________________________________ General Contractor Representative:_________________________________________________ E-mail Address:__________________________________Telephone:______________________ Project Information: General Description of Proposed Construction (Attach Plan & Profile, See Page 5 for Example): Estimated Start Date:_______________ Estimated Completion Date:_________________ Has 811 and/or utility companies been contacted 48 hours prior to locate existing utilities? Yes No If No, state reason:_________________________________________________ Is removal of existing streets, alleys or sidewalks necessary? Yes No If YES, repair must have a City inspection prior to completion. Call 972-304-3679. Is closure of any traffic lanes or driveway approaches necessary? Yes No If YES, a traffic control plan in accordance with TMUTCD standards must be submitted, and the following departments must be notified of the location and duration of the closure: Police Department, 972-304-3600 Fire Department, 972-304-3512 Street Department, 972-462-5150 Engineering Department, 972-304-3679 Traffic lane closures are allowed from 9:30 a.m until 3:30 p.m. ONLY unless otherwise approved by the City Engineer. --Work activity is permitted from 7:00 a.m. until 7:00 p.m., Monday through Friday only.-- Right of Way Use Permit Application Page 2 of 5 This application, with signatures of Utility and Contractor representatives, must be submitted to the Engineering Department for approval prior to commencing work. Printing your name and date on this form indicates your acceptance of the terms and conditions of this application. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand, or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. ________________________________________ ___________________________________ Signature of Utility Company Representative Date ________________________________________ ___________________________________ Signature of Contractor Representative Date ________________________________________ ___________________________________ APPROVED City Representative Date DENIED Comments: E-mail address to return completed permit:__________________________________________________ Submit permit application by e-mail to engineer@coppelltx.gov, or deliver application to the Engineering Department, Town Center Business Park, 265 E Parkway Blvd, Coppell, TX 75019 SUMMARY OF REQUIREMENTS FOR WORK WITHIN THE CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS 1.A copy of the valid approved City of Coppell permit is required on the project site at all times. 2.Property owners (commercial and residential) adjacent to the project must be notified of the project timeline and provided contractor names and phone numbers. No access to private property without prior coordination with property owner. 3.Proper erosion control measures must be taken, in accordance with the Coppell Erosion Control Ordinance No. 91-514. 4.Follow Texas MUTCD standards for work in traffic zones. Lane closures require the use of a flashing arrow board for advance warning. 5.Grading shall be restored or improved, and sod replaced when necessary. 04/26/2021Scott Latta X Please contact City of Coppell Public Works Operations at 972-462-5150 to coordinate relocation of the Coppell 15" sanitary sewer line. Right of Way Use Permit Application Page 3 of 5 6.Irrigation repairs must be performed in a timely manner. 7.Follow OSHA trench safety guidelines at all times. 8.Repair existing utilities that are damaged, including but not limited to: Clean-outs, water valves, wastewater manholes, water lines, wastewater lines and storm sewer lines. 9. Density tests may be required, at applicant’s expense, in trench lines (ASTM). 10.Protection and repair of traffic control devices and signage is the responsibility of the contractor. 11.No work is to be done in collector roadways before 9:30 a.m. or after 3:30 p.m. 12.Prior request of work activity on weekends and holidays must be submitted in writing. 13.Utility line locates must be performed in advance of construction by calling 811 or logging on to the Texas811 Portal at: http://www.texas811.org. Additional utility contacts are as follows: COPPELL PUBLIC WORKS - OPERATIONS COPPELL PUBLIC WORKS - ENGINEERING 972-304-3679 DENTON COUNTY LEVEE DISTRICT 972-315-5019 T.C.E.Q. Region 4 817-588-5800 IRVING WATER UTILITIES 972-721-2281 ATMOS ENERGY 888-286-6700 EXPLORER PIPELINE 918-493-5100 ONCOR ELECTRIC DELIVERY 888-313-6862 972-462-5150 HOMEOWNER ASSOCIATIONS Planning Department: H.O.A. List F.E.M.A. 940-898-5399 DALLAS WATER UTILITIES 214-670-5111 AT&T 800-924-9420 COSERV Gas & Electric 940-321-7800 FRONTIER COMMUNICATIONS 800-584-3384 SPECTRUM CABLE 833-780-1880 14. Debris must be removed from work area daily and disposed of properly outside the City. 15.Streets, sidewalks and alleys must be kept clear of construction materials and debris. 16.“Clean-up” requires returning work area to pre-construction condition or better. Right of Way Use Permit Application Page 4 of 5 Contact Coppell Public Works Operations at 972/462-5150 to schedule an inspection with Utility and Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name:___________________________________________________________ Project Location or Address:_______________________________________________________ Sub-contractor Company Name:____________________________________________________ 24 hr. Contact Number:____________________________________________________________ Date of Verification Appointment:_________________________ Time:____________________ -INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL- Inspected by:_________________ of Utilities Maintenance Division on _______________ and found to be acceptable, not acceptable because:___________________________ Follow-up needed? No Yes, follow-up scheduled for:__________________________ Inspected by:__________________ of Streets Maintenance Division on _______________ and found to be acceptable, not acceptable because:___________________________ Follow-up needed? No Yes, follow-up scheduled for:__________________________ A copy of this completed notice can be e-mailed to the Coppell Public Works Operations Division, or delivered to the address below: City of Coppell Public Works Department, Operations Division 816 S. Coppell Road Coppell, TX 75019 COMPLETION VERIFICATION NOTICE Lane Closure Request Form For City permit reasons, please turn in request 3 weeks prior to implementation (TxDOT ROW approval may take 4 to 7 weeks) Date of request 1/28/2021 Contact Person / Phone number Hunter Lord 972-921-2616 City where work will be performed Coppell Location and cross street South Belt Line Rd Lanes to be closed (right, left, full) NB Right Lane Implementation Date(s) and Times (Start / End) 2/15/2021 7:00 – 5:00 Scope of Work Utility Relocation at S Belt Line Rd Additional Information Please attach a Google Earth photo with your work limits Return completed request form to Sid Mehta (MOT Engineer) smehta@herzog.com (469) 771-8498 Arrow Board ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 END ROAD WORK G20-2CW20-5RRIGHT LANE CLOSED ROAD WORK AHEADCW20-1DROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 END ROAD WORK G20-2 ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 END ROAD WORK G20-2CW20-5RRIGHT LANE CLOSED ROAD WORK AHEADCW20-1D540ft Taper 120ft400ft Buffer 960ft Work Zone 320ft 400ft120ft 400ft320ft 120ftROAD WORK AHEADCW20-1D120ft320ft 320ftSIDEWALKCLOSEDSIDEWALKCLOSEDType 1 Type 2 Type 3 Phase 1 Sheet 1 Hamilton Duffy, PC Consulting Tex Reg F-5260 85ft Buffer120ft 245ft Taper 320ft Taper 170ft Buffer240ft 400ft 415ft Buffer 720ft Taper 780ft Taper Arrow Board MB Part A 50ft Work Zone 100ft Work Zone 150ft Work Zone 200ft Work Zone 250ft Work Zone 300ft Work Zone 350ft Work Zone 400ft Work Zone 450ft Work Zone 500ft Work Zone 1000ft Work Zone 1500ft Work Zone RIGHT LANE MUST EXIT R3-33R LEFT LANE MUST EXIT R3-33L ONLYONLY STOP HERE ON RED ONLYONLY ONLYONLYONLYONLYONLY Navigator ONLYONLY ONLY ONLYONLYONLYONLY ONLYONLY Navigator Type 3 Barricade Navigator Type 3 Barricade Type 1 Barricade Navigators Type 3 Barricade 2-Way Traffic Vertical Panel Type 3 Barricade Barrels Type 3 Barricade Barrels Type 3 Barricade 2-Way Traffic Vertical Panel Barrels Type 3 Barricade Type 1 Barricade Navigator Type 3 Barricade Type 2 Barricade Type 1 Barricade Barrels Type 3 Barricade Type 2 Barricade Type 1 Barricade Navigator Type 3 Barricade Type 2 Barricade Barrels Type 3 Barricade Type 2 Barricade ONLY ROAD CLOSED TO THRU TRAFFIC TYPE III R11-2 ROAD CLOSED ROAD CLOSED TO THRU TRAFFIC ROAD CLOSED TYPE III R11-2 / CW1-7 ROAD CLOSED DETOUR TYPE III R11-2 / M4-10R ROAD CLOSED DETOUR TYPE III R11-2 / M4-10L DETOUR TYPE III R11-4 / M4-10R ROAD CLOSED TO THRU TRAFFIC DETOUR TYPE III R11-4 / M4-10L ROAD CLOSED TO THRU TRAFFIC RAMP CLOSED ROAD CLOSED SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE 100ft Taper 100ft Buffer 90ft Shifting Taper 100ft 1000ft 1600ft 85ft SIDEWALK CLOSED 600ft Taper 280ft Buffer 180ft Taper 540ft Taper 660ft Taper 160ft 320ft 120ft Buffer 220ft Buffer 335ft Buffer 500ft 700ft485ft Buffer 900ft 600ft 800ft 585ft Buffer 840ft Taper 900ft Taper 720ft Buffer N EW S xxft Shoulder Taper xx 30 180 85 120 Speed Taper Buffer Sign Spacing 35 40 45 50 245 320 540 600 120 170 220 280 160 240 320 400 55 660 335 500 60 720 415 600 65 780 485 700 70 840 585 800 75 900 720 900 Devices spaced on 35ft centers Posted speed limit 45MPH Devices spaced on 25ft centers Posted speed limit 35MPH Devices spaced on 30ft centers Posted speed limit 40MP H Devices spaced on 40ft centers Posted speed limit 50MPH Devices spaced on 20ft centers Posted speed limit 30MPH Devices spaced on 45ft centers Posted speed limit 55MPH Devices spaced on 50ft centers Posted speed limit 60MPH Devices spaced on 55ft centers Posted speed limit 65MPH Devices spaced on 60ft centers Posted speed limit 70MPH Devices spaced on 65ft centers Posted speed limit 75MPH Devices spaced on 70ft centers Posted speed limit 80MPH KEEP RIGHT RIGHT LANE MUST TURN RIGHT R3-7R NOTE: Changes requested by Contractor do not conform to TXDOT/MUTCD standards. Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control. LEFT LANE MUST TURN LEFT R3-7L SIDEWALK CLOSED USE OTHER SIDE 1000ft 1/2 MILE 1 MILE NOTE: Plan design based on engineered stamped plans provided by Contractor does not conform to TXDOT/MUTCD standards. Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control. Type 2 Barricade Navigators Type 3 Barricade Water Barrier Type 1 Barricade Barrels Type 3 Barricade Water Barrier Navigators Type 3 Barricade Flagger w/Cones Barrels Type 3 Barricade Flagger w/Cones NOTE: Plan requested by Contractor may not conform to TXDOT/MUTCD standards. Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control. ALLEY CLOSED TO THRU TRAFFIC TYPE III R11-2 ALLEY CLOSED Chris Schreiner Eddie Harmon Jason Garrett Marie Rhom Keith Hamilton Lauren Simpson Tony Troxclair Lindsay Garrett Jessica Paredes Mike Moreno Lacey Green Daniel Barron Matt Sauer Dustin Rawlings Jeremiah Keys ROAD CLOSED TO THRU TRAFFICNEWS Cole Benton SIDEWALK CLOSED USE OTHER SIDE TO BE PLACED AT DO NOT PASS DO NOT DRIVE ON SHOULDER Michael Cooper Kevin Omachel Matt Smith Devan Diviney Benjamin Masters Barrels SIDEWALK CLOSED Chris Blum General Notes: 1. Contractor shall be responsible to maintain traffic control as set forth in the Texas Manual on Uniform Traffic Control Devices for Streets and Highways. 2. Lanes may be closed to traffic during 9 AM-4 PM only after prior approval. 3. Accessible pedestrian routes shall be maintained at all times. 4. Contractor shall contact the City of Plano Project Manager or the Traffic Management Center at least one week prior to lane closing if left turns from opposite directions cannot go together anytime due to road or utility work at a signalized intersection.Special RulesPlano-Double-up Signs-Add General NotesDallas-Intersections Count As Buffer-No “End Road Work”Fort Worth-”1 Block Rule”-Arrow Board 40MPH+Richardson -Sign Sequence (RWA, LCA, LEML/R)MatchlineStreet NameALL TRAFFIC MUST EXIT 2600ft PRELIMINARY FOR REVIEW ONLY PE NO. DATE KEITH M. HAMILTON 87384 XX/XX/2019 Christian Lopez xx YOUR SPEED XX Radar Trailer MB SZ Q-Lynx 2L Rule-On freeways, buffer spaces shall be 2x the length of the Taper. “Diamond” rule for Crossovers -On the diamonds made to push traffic back over from a 2-way application, the spacing is to be a 1/2L taper length 1/2L MatchlineCITY: CONTRACTOR: JOB NAME: Coppell S Belt Line Rd & Southwestern Blvd One Global Telecom Right Lane Closure All Traffic Control Plans (TCPs) are the property of Buyers Barricades, Inc. and are included with Buyers Barricades rental agreements. Traffic Control Plans issued without a rental agreement will be charged to the customer. THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM THE REQUIREMENTS SET FORTH BY RELATED CONTRACT DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) OR THE OVERALL RESPONSIBILITY TO TRAFFIC CONTROL SAFETY. NOTESSALESMAN EXECUTIVE TCP DESIGNER LEGEND SCOPE OF WORK: LOCATION: CONTACT NUMBER: CONTACT: DATE: 469-992-9411 01/26/2021 Harley Garrison SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSEDRumble Strips Crash Truck/TMA Water Barrier Concrete Barrier *** *** ROADWORKAHEADCW20-1DCW20-5RRIGHTLANECLOSED CW20-5DLLEFTLANECLOSEDAHEAD RIGHTLANECLOSEDAHEADCW20-5DRTURNLANECLOSEDCW20-5TCENTERLANECLOSEDCW20-5CROADCLOSEDAHEADCW20-3DDETOURAHEADCW20-2DONE LANEROADAHEADCW20-4DBEPREPAREDTOSTOPCW3-4CW20-7LANE ENDSMERGERIGHTCW9-2TRLANE ENDSMERGELEFTCW9-2TL2RIGHT LANESCLOSEDCW20-5aTRSHOULDERWORKCW21-5ROADNARROWSCW5-1TRUCKSENTERINGROADWAYCW27-1TCW3-2CW4-3RCW4-3LCW21-1aT CW1-4LCW1-4RCW6-3CW12-1CW12-1CW12-1ENDROAD WORKG20-2ENDROAD WORKG20-2CW20-5LLEFTLANECLOSEDTOONCOMINGTRAFFICR1-2YIELDR1-2 APSTOPR1-1R5-1YIELDR1-2WRONGWAYR5-1a G20-1bR NEXT MILESXXROAD WORK ONE WAYR6-1L ONE WAYR6-1RCW1-7DETOURM4-10L DETOURM4-10RNAMEADDRESSCITYSTATECONTRACTORG20-6TBEGINROAD WORKNEXT X MILESG20-T ROADCLOSEDR11-2R11-3ROAD CLOSEDAHEADLOCAL TRAFFIC ONLYROAD CLOSEDTOTHRU TRAFFICR11-4****LOOSEGRAVELCW8-7FRESHOILCW21-2TURNLANECLOSEDAHEADCW20-5DTCENTERLANECLOSEDAHEADCW20-5DCCW28-1TPOWER LINESCW23-2NEWTRAFFICPATTERNAHEADUTILITYWORKAHEADCW21-7DWORK ZONE30WHEN WORKERS ARE PRESENT WORK ZONETRAFFIC FINES DOUBLE TALK OR TEXT LATERSTAY ALERTG20-10T M4-9SM4-9L M4-9RR3-2R3-1 PR8-3R5-2R3-4G20-1bL NEXT MILESXXROAD WORK INTERSTATETEXAS**ONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LCONSTRUCTIONENTRANCE**M4-9RM4-9L RAMPCLOSEDAHEADCW20-3DSLOW ALLEYCLOSEDAHEAD2RIGHT LANESCLOSED1/2 MILECW20-5aTR2LEFT LANESCLOSEDCW20-5aTLSPECIALEVENTAHEADTHRUTRAFFICMERGELEFTTHRUTRAFFICMERGERIGHT RUMBLESTRIPS ENDWORK ZONEG20-2ENDWORK ZONEG20-2CW3-3CW3-1FRWYCLOSEDAHEADCW20FY-3D CW1-4L CW1-4RTORAMPR1-2YIELD NEXT MILESXXROAD WORK NEXT MILESXX Jessica Garcia Eric Putnam Crystal Quintero Connor Siemers CROSSWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE CROSSWALK CLOSED CROSSWALK CLOSED USE OTHER SIDE Sheet 1 Devices spaced on 35ft centers Posted speed limit 45MPH Alex Thlang S Belt Line Rd & Southwestern Blvd Navigator Type 3 Barricade Type 2 Barricade Hector Gonzalez MatchlineBelt Line Rd Bullock St Southwestern Blvd Arrow Board ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 END ROAD WORK G20-2CW20-5RRIGHT LANE CLOSED ROAD WORK AHEADCW20-1DROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 END ROAD WORK G20-2 ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 ROAD WORK AHEADCW20-1DEND ROAD WORK G20-2 END ROAD WORK G20-2CW20-5RRIGHT LANE CLOSED ROAD WORK AHEADCW20-1D540ft Taper 120ft400ft Buffer 960ft Work Zone 320ft 400ft120ft400ft 320ft 120ftROAD WORK AHEADCW20-1D120ft320ft 320ftSIDEWALKCLOSEDSIDEWALKCLOSED Type 1 Type 2 Type 3 Phase 1 Sheet 1 Hamilton Duffy, PC Consulting Tex Reg F-5260 85ft Buffer120ft 245ft Taper 320ft Taper 170ft Buffer240ft 400ft 415ft Buffer 720ft Taper 780ft Taper Arrow Board MB Part A 50ft Work Zone 100ft Work Zone 150ft Work Zone 200ft Work Zone 250ft Work Zone 300ft Work Zone 350ft Work Zone 400ft Work Zone 450ft Work Zone 500ft Work Zone 1000ft Work Zone 1500ft Work Zone RIGHT LANE MUST EXIT R3-33R LEFT LANE MUST EXIT R3-33L ONLYONLY STOP HERE ON RED ONLYONLY ONLYONLYONLYONLYONLY Navigator ONLYONLY ONLY ONLYONLYONLYONLY ONLYONLY Navigator Type 3 Barricade Navigator Type 3 Barricade Type 1 Barricade Navigators Type 3 Barricade 2-Way Traffic Vertical Panel Type 3 Barricade Barrels Type 3 Barricade Barrels Type 3 Barricade 2-Way Traffic Vertical Panel Barrels Type 3 Barricade Type 1 Barricade Navigator Type 3 Barricade Type 2 Barricade Type 1 Barricade Barrels Type 3 Barricade Type 2 Barricade Type 1 Barricade Navigator Type 3 Barricade Type 2 Barricade Barrels Type 3 Barricade Type 2 Barricade ONLY ROAD CLOSED TO THRU TRAFFIC TYPE III R11-2 ROAD CLOSED ROAD CLOSED TO THRU TRAFFIC ROAD CLOSED TYPE III R11-2 / CW1-7 ROAD CLOSED DETOUR TYPE III R11-2 / M4-10R ROAD CLOSED DETOUR TYPE III R11-2 / M4-10L DETOUR TYPE III R11-4 / M4-10R ROAD CLOSED TO THRU TRAFFIC DETOUR TYPE III R11-4 / M4-10L ROAD CLOSED TO THRU TRAFFIC RAMP CLOSED ROAD CLOSED SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE 100ft Taper 100ft Buffer 90ft Shifting Taper 100ft 1000ft 1600ft 85ft SIDEWALK CLOSED 600ft Taper 280ft Buffer 180ft Taper 540ft Taper 660ft Taper 160ft 320ft 120ft Buffer 220ft Buffer 335ft Buffer 500ft 700ft485ft Buffer 900ft 600ft 800ft 585ft Buffer 840ft Taper 900ft Taper 720ft Buffer N EW S xxft Shoulder Taper xx 30 180 85 120 Speed Taper Buffer Sign Spacing 35 40 45 50 245 320 540 600 120 170 220 280 160 240 320 400 55 660 335 500 60 720 415 600 65 780 485 700 70 840 585 800 75 900 720 900 Devices spaced on 35ft centers Posted speed limit 45MPH Devices spaced on 25ft centers Posted speed limit 35MPH Devices spaced on 30ft centers Posted speed limit 40MP H Devices spaced on 40ft centers Posted speed limit 50MPH Devices spaced on 20ft centers Posted speed limit 30MPH Devices spaced on 45ft centers Posted speed limit 55MPH Devices spaced on 50ft centers Posted speed limit 60MPH Devices spaced on 55ft centers Posted speed limit 65MPH Devices spaced on 60ft centers Posted speed limit 70MPH Devices spaced on 65ft centers Posted speed limit 75MPH Devices spaced on 70ft centers Posted speed limit 80MPH KEEP RIGHT RIGHT LANE MUST TURN RIGHT R3-7R NOTE: Changes requested by Contractor do not conform to TXDOT/MUTCD standards. Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control. LEFT LANE MUST TURN LEFT R3-7L SIDEWALK CLOSED USE OTHER SIDE 1000ft 1/2 MILE 1 MILE NOTE: Plan design based on engineered stamped plans provided by Contractor does not conform to TXDOT/MUTCD standards. Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control. Type 2 Barricade Navigators Type 3 Barricade Water Barrier Type 1 Barricade Barrels Type 3 Barricade Water Barrier Navigators Type 3 Barricade Flagger w/Cones Barrels Type 3 Barricade Flagger w/Cones NOTE: Plan requested by Contractor may not conform to TXDOT/MUTCD standards. Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control. ALLEY CLOSED TO THRU TRAFFIC TYPE III R11-2 ALLEY CLOSED Chris Schreiner Eddie Harmon Jason Garrett Marie Rhom Keith Hamilton Lauren Simpson Tony Troxclair Lindsay Garrett Jessica Paredes Mike Moreno Lacey Green Daniel Barron Matt Sauer Dustin Rawlings Jeremiah Keys ROAD CLOSED TO THRU TRAFFICNEWS Cole Benton SIDEWALK CLOSED USE OTHER SIDE TO BE PLACED AT DO NOT PASS DO NOT DRIVE ON SHOULDER Michael Cooper Kevin Omachel Matt Smith Devan Diviney Benjamin Masters Barrels SIDEWALK CLOSED Chris Blum General Notes: 1. Contractor shall be responsible to maintain traffic control as set forth in the Texas Manual on Uniform Traffic Control Devices for Streets and Highways. 2. Lanes may be closed to traffic during 9 AM-4 PM only after prior approval. 3. Accessible pedestrian routes shall be maintained at all times. 4. Contractor shall contact the City of Plano Project Manager or the Traffic Management Center at least one week prior to lane closing if left turns from opposite directions cannot go together anytime due to road or utility work at a signalized intersection.Special RulesPlano-Double-up Signs-Add General NotesDallas-Intersections Count As Buffer-No “End Road Work”Fort Worth-”1 Block Rule”-Arrow Board 40MPH+Richardson -Sign Sequence (RWA, LCA, LEML/R)MatchlineStreet NameALL TRAFFIC MUST EXIT 2600ft PRELIMINARY FOR REVIEW ONLY PE NO. DATE KEITH M. HAMILTON 87384 XX/XX/2019 Christian Lopez xx YOUR SPEED XX Radar Trailer MB SZ Q-Lynx 2L Rule-On freeways, buffer spaces shall be 2x the length of the Taper. “Diamond” rule for Crossovers -On the diamonds made to push traffic back over from a 2-way application, the spacing is to be a 1/2L taper length 1/2L MatchlineCITY: CONTRACTOR: JOB NAME: Coppell S Belt Line Rd & Southwestern Blvd One Global Telecom Right Lane Closure All Traffic Control Plans (TCPs) are the property of Buyers Barricades, Inc. and are included with Buyers Barricades rental agreements. Traffic Control Plans issued without a rental agreement will be charged to the customer. THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM THE REQUIREMENTS SET FORTH BY RELATED CONTRACT DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) OR THE OVERALL RESPONSIBILITY TO TRAFFIC CONTROL SAFETY. NOTESSALESMAN EXECUTIVE TCP DESIGNER LEGEND SCOPE OF WORK: LOCATION: CONTACT NUMBER: CONTACT: DATE: 469-992-9411 01/26/2021 Harley Garrison SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSEDRumble Strips Crash Truck/TMA Water Barrier Concrete Barrier *** *** ROADWORKAHEADCW20-1DCW20-5RRIGHTLANECLOSED CW20-5DLLEFTLANECLOSEDAHEAD RIGHTLANECLOSEDAHEADCW20-5DRTURNLANECLOSEDCW20-5TCENTERLANECLOSEDCW20-5CROADCLOSEDAHEADCW20-3DDETOURAHEADCW20-2DONE LANEROADAHEADCW20-4DBEPREPAREDTOSTOPCW3-4CW20-7LANE ENDSMERGERIGHTCW9-2TRLANE ENDSMERGELEFTCW9-2TL2RIGHT LANESCLOSEDCW20-5aTRSHOULDERWORKCW21-5ROADNARROWSCW5-1TRUCKSENTERINGROADWAYCW27-1TCW3-2CW4-3RCW4-3LCW21-1aT CW1-4LCW1-4RCW6-3CW12-1CW12-1CW12-1ENDROAD WORKG20-2ENDROAD WORKG20-2CW20-5LLEFTLANECLOSEDTOONCOMINGTRAFFICR1-2YIELDR1-2 APSTOPR1-1R5-1YIELDR1-2WRONGWAYR5-1a G20-1bR NEXT MILESXXROAD WORK ONE WAYR6-1L ONE WAYR6-1RCW1-7DETOURM4-10L DETOURM4-10RNAMEADDRESSCITYSTATECONTRACTORG20-6TBEGINROAD WORKNEXT X MILESG20-T ROADCLOSEDR11-2R11-3ROAD CLOSEDAHEADLOCAL TRAFFIC ONLYROAD CLOSEDTOTHRU TRAFFICR11-4****LOOSEGRAVELCW8-7FRESHOILCW21-2TURNLANECLOSEDAHEADCW20-5DTCENTERLANECLOSEDAHEADCW20-5DCCW28-1TPOWER LINESCW23-2NEWTRAFFICPATTERNAHEADUTILITYWORKAHEADCW21-7DWORK ZONE30WHEN WORKERS ARE PRESENT WORK ZONETRAFFIC FINES DOUBLE TALK OR TEXT LATERSTAY ALERTG20-10T M4-9SM4-9L M4-9RR3-2R3-1 PR8-3R5-2R3-4G20-1bL NEXT MILESXXROAD WORK INTERSTATETEXAS**ONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LCONSTRUCTIONENTRANCE**M4-9RM4-9L RAMPCLOSEDAHEADCW20-3DSLOW ALLEYCLOSEDAHEAD2RIGHT LANESCLOSED1/2 MILECW20-5aTR2LEFT LANESCLOSEDCW20-5aTLSPECIALEVENTAHEADTHRUTRAFFICMERGELEFTTHRUTRAFFICMERGERIGHT RUMBLESTRIPS ENDWORK ZONEG20-2ENDWORK ZONEG20-2CW3-3CW3-1FRWYCLOSEDAHEADCW20FY-3D CW1-4L CW1-4RTORAMPR1-2YIELD NEXT MILESXXROAD WORK NEXT MILESXX Jessica Garcia Eric Putnam Crystal Quintero Connor Siemers CROSSWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE CROSSWALK CLOSED CROSSWALK CLOSED USE OTHER SIDE Sheet 2 Devices spaced on 35ft centers Posted speed limit 45MPH Alex Thlang S Belt Line Rd & Southwestern Blvd Navigator Type 3 Barricade Type 2 Barricade Hector GonzalezMatchline Belt Line Rd Airline DrOlympus Blvd