Loading...
FEMA-EC150216 (2)U.S. DEPARTMENT OF HOMELAND SECURITY ELEVATION CERTIFICATE FEDERAL EMERGENCY MANAGEMENT AGENCY OMB No. 1660-0008 Nenional blood /nsurancc Program Important: Read the instructions on pages 14. Pynornfonn rIntne 11 1111 '411 A1. Building Owner's Name David Weekley Homes, L.P. SECTION A — PROPERTY INFORMATION I FOR INSURANCE COMPANY USE Policy Number: A2. Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No. Company NAIC Number: 844 Prescott Lane City Coppell State Tx ZIP Code 75019 A3. Property Description (Lot and Block Numbers, Tax Parcel Number, Legal Description, etc.) Lot 11, Block A of Belmont Landing A4. 61, Building Use (e.g., Residential, Non -Residential, Addition, Accessory, etc.) Residential 63. State Coppell 480170 feet Dallas Tx A5, Latitude/Longitude: Lat, 32.951 Long. -96.960 Horizontal Datum: ❑ NAD 1927 ® NAD 1983 A6. Attach at least 2 photographs of the building if the Certificate is being used to obtain flood insurance. A7. Building Diagram Number 1B E K A8. For a building with a crawlspace or enclosure(s): A9. For a building with an attached garage: AO, use base flood depth) a) Square footage of crawlspace or enclosure(s) N/A sq ft a) Square footage of attached garage 428 sq ft b) Number of permanent flood openings in the crawlspace b) Number of permanent flood openings in the attached garage or enclosure(s) within 1.0 foot above adjacent grade within 1.0 foot above adjacent gradeN/A c) Total net area of flood openings in A8.b sq in c) Total net area of flood openings in A9.b sq in d) Engineered flood openings? ❑ Yes ❑ No d) Engineered flood openings? ❑ Yes ® No SECTION B — FLOOD INSURANCE RATE MAP (FIRM) INFORMATION NFIP Community Name &Community 610. Indicate the source Number B2. County Name 63. State Coppell 480170 feet Dallas Tx [I feet B4. Map/Panel Number65. meters Suffix B6, FIRM Index Date B7. FIRM Panel B8, Flood B9. Base Flood Elevation(s) (Zone 48113CO155 E K 7/7/2014 Effective/Revised Date Zone(s) AO, use base flood depth) 12/12/2014 X N/A of the Base Flood Elevation (BFE) data or base flood depth entered in Item 69. ❑ FIS Profile ❑ FIRM ❑ Community Determined ® Other/Source: LOMR-APP 15-06-0173P 1311. Indicate elevation datum used for BFE in Item B9: ❑ NGVD 1929 ® NAVD 1988 ❑ Other/Source: B12. Is the building located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area (OPA)? ❑ Yes ® No Designation Date: ❑ CBRS ❑ OPA SECTION C —BUILDING ELEVATION INFORMATION (SURVEY REQUIRED) EJ Construction Drawings* ®Building Under Construction* El Finish C1. Building elevations are based on: Construction *A new Elevation Certificate will be required when construction of the building is complete. C2. Elevations —Zones Al—A30, AE, AH, A (with BFE), VE, V1—V30, V (with BFE), AR, AR/A, AR/AE, AR/A1—A30, AR/AH, AR/AO, Complete Items C2.a—h below according to the building diagram specified in Item A7, In Puerto Rico only, enter meters. Benchmark Utilized: Coppell Monument Vertical Datum: NAVD 1988 Indicate elevation datum used for the elevations in items a) through h) below. ❑ NGVD 1929 ® NAVD 1988 ❑ Other/Source: Datum used for building elevations must be the same as that used for the BFE. Check the measurement used. a) Top of bottom floor (including basement, crawlspace, or enclosure floor) 455.28 ®feet b) Top of the next higher floor c) Bottom of the lowest horizontal structural member (V Zones only) d) Attached garage (top of slab) e) Lowest elevation of machinery or equipment servicing the building (Describe type of equipment and location in Comments) f) Lowest adjacent (finished) grade next to building (LAG) 454.05 ®feet El meters g) Highest adjacent (finished) grade next to building (HAG) h) Lowest adjacent grade at lowest elevation of deck or stairs, including structural support ❑ meters ❑ feet ❑meters [I feet El meters ❑ feet El meters El feet El meters SECTION D —SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized by law to certify elevation , information. I certify that the information on this Certificate represents my best efforts to interpret the data available. P<, 4_ Qj r;; � I understand that any false statement maybe punishable by fine or imprisonment under 18 U. S. Code, Section 1001. !,7 v El Check here if comments are provided on back of form. Were latitude and longitude in Section A provided by a �` 5•*��t El Check here if attachments. licensed land surveyor? ® Yes El No Certifier's Name Chad Sledge Title RPLS License Number 5733 Company Name Roome Land Surveying, Inc. 0 City Plano Address 2000 Ave G Suite 81 Signature Date 2/16/2015 State Tx ZIP Code 75074 Telephone 972-423-4372 CHAD SLEDGE *. *:9..5733**P: FEMA Form 086-0-33 (7/12) See reverse side for continuation. Replaces all previous editions. ❑ feet ❑meters ❑ feet Elmeters SECTION D —SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized by law to certify elevation , information. I certify that the information on this Certificate represents my best efforts to interpret the data available. P<, 4_ Qj r;; � I understand that any false statement maybe punishable by fine or imprisonment under 18 U. S. Code, Section 1001. !,7 v El Check here if comments are provided on back of form. Were latitude and longitude in Section A provided by a �` 5•*��t El Check here if attachments. licensed land surveyor? ® Yes El No Certifier's Name Chad Sledge Title RPLS License Number 5733 Company Name Roome Land Surveying, Inc. 0 City Plano Address 2000 Ave G Suite 81 Signature Date 2/16/2015 State Tx ZIP Code 75074 Telephone 972-423-4372 CHAD SLEDGE *. *:9..5733**P: FEMA Form 086-0-33 (7/12) See reverse side for continuation. Replaces all previous editions. Irl= " � ► s Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No. 844 Prescott Lane ZIP Code 75019 al MMM a LN •& •' Z • •• 1, 11111 1 Copy both sides of this Elevation. owner. Signature Date For Zones AO and A (without BFE), complete Items E1—E5. If the Certificate is intended to support a LOMA or LOMB -F request, complete Sections A, B, and C. For Items E1—E4, use natural grade, if available. Check the measurement used. in Puerto Rico only, enter meters. E1. Provide elevation information for the following and check the appropriate boxes to show whether the elevation is above or below the highest adjacent grade (HAG) and the lowest adjacent grade (LAG). a) Top of bottom floor (including basement, crawlspace, or enclosure) is ❑ feet ❑ meters ❑ above or ❑ below the HAG. b) Top of bottom floor (including basement, crawlspace, or enclosure) is ❑ feet ❑ meters ❑ above or ❑ below the LAG. E2, For Building Diagrams 6-9 with permanent flood openings provided in Section A Items 8 and/or 9 (see pages 8-9 of Instructions), the next higher floor (elevation C2.b in the diagrams) of the building is 171 feet ED meters El above or L_) below the HAG. E3. Attached garage (top of slab) is ❑ feet ❑ meters ❑ above or ❑ below the HAG. E4. Top of platform of machinery and/or equipment servicing the building is ❑ feet ❑ meters ❑ above or ❑ below the HAG. E5. Zone AO only: If no flood depth number is available, is the top of the bottom floor elevated in accordance with the community's floodplain management ordinance? ❑ Yes ❑ No ❑ Unknown. The local official must certify this information in Section G. SECTION F — PROPERTY OWNER (OR OWNER'S REPRESENTATIVE) CERTIFICATION The property owner or owner's authorized representative who completes Sections A, B, and E for Zone A (without a FEMA -issued or community -issued BFE) or Zone AO must sign here. The statements in Sections A, B, and E are correct to the best of my knowledge. Property Owner's or Owner's Authorized Representative's Name Address City State ZIP Code Signature Date Telephone Comments ❑ Check herd, if attachr�le ts. SECTION G — COMMUNITY INFORMATION (OPTIONAL) The local official who is authorized by law or ordinance to administer the community's floodplain management ordinance can complete Sections A, B; G (or E), and GG of this Elevation Certificate. Complete the applicable item(s) and sign below. Check the measurement used in Items G8 -G10. in Puerto RiFo only, enter meters. G1. ❑ The information in Section C was taken from other documentation that has been signed and sealed by a licensed surveyor, engineer, or architect who is authorized by law to certify elevation information. (Indicate the source and date of the elevation data in the Comments area b61ow.) G2. ❑ A community official completed Section E for a building located in Zone A (without a FEMA -issued or community -Issued BFE) or Zone AO. G3. ❑ The following information (Items G4—G10) is provided for community floodplain management purposes. G4. Permit Number G5. Date Permit Issued G6. Date Certificate Of Compliance/Occupancy Issued G7. This permit has been issued for: ❑New Construction ❑Substantial Improvement G8. Elevation of as -built lowest floor (including basement) of the building: ❑feet ❑meters G9. BFE or (in Zone AO) depth of flooding at the building site: ❑ feet ❑ meters G10. Community's design flood elevation: El feet El meters Local Official's Name Title Community Name Telephone Signature Date Comments Datum Datum Datum Check here if attachments. FEMA Form 086-0-33 (7/12) Replaces a11 previous editions. a ilk. OW IlL .. it _It - It ,r4 a- sa i - - - .- if r n ,r •ts . :1Iff It If tR