Loading...
FEMA-EC140729 (4)U.S. UEAARTMENT OF HOMELAND SECURITY FEDERAL EMERGENCY MANAGEMENT AGENCY A'(1riouallolood brsureince Prugraw 1. Building Owner's Name Standard Pacific ELEVATION CERTIFICATE Important: Read the instructions on pages 1-9. SECTION A - PROPERTY INFORMATION A2. Building Street Address (including Apt., Unit, Suite, andlor Bldg. No.) or P.O. Route and Box No. 610 Westhaven Road City Coppell State TX ZIP Code 75019 A3. Property Description (Lot and Block Numbers, Tax Parcel Number, Legal Description, etc.) Lot 19, Block N, Westhaven Phase 1, addition to the City of Coppell, Dallas County, Texas OMB No, 1660-0008 Expiration Date: July 31, 2015 FOR INSURANCE COMPANY USE Policy Number: NAIC Nu A4. Building Use (e.g., Residential, Non Residential, Addition, Accessory, etc.) Residential A5. Latitude/Longitude: Lat. 32.988544° Long. -97.005616° Horizontal Datum: El NAD 1927 ®NAD 1983 A6. Attach at least 2 photographs of the building if the Certificate is being used to obtain flood insurance. AT Building Diagram Number 1b A8. For a building with a crawlspace or enclosure(s): A9. For a building with an attached garage: a) Square footage of crawlspace or enclosure(s) sq ft a) Square footage of attached garage sq ft b) Number of permanent flood openings in the crawlspace b) Number of permanent flood openings in the attached garage or enclosure(s) within 1.0 foot above adjacent grade within 1.0 foot above adjacent grade c) Total net area of flood openings in A8.b sq in c) Total net area of flood openings in A9.b sq in d) Engineered flood openings? ❑ Yes ❑ No d) Engineered flood openings? ❑ Yes ❑ No SECTION B - FLOOD INSURANCE RATE MAP (FIRM) INFORMATION B1, NFIP Community Name &Community Number 62. County Name I B3. State City of Coppell 480170 Dallas Texas _II B4. Map/Panel Number B5, Suffix B6, FIRM Index Date 67. FIRM Panel B8, Flood B9. Base Flood Elevation(s) (Zone 48113C0135K1135 K 07/0712014 Effective/Revised Date Zone(s) AO, use base flood depth) 07/07/2014 AE 466 B10. Indicate the source of the Base Flood Elevation (BFE) data or base flood depth entered in Item B9. ❑ FIS Profile 0 FIRM ❑ Community Determined ❑ Other/Source: B11. Indicate elevation datum used for. BFE in Item B9: ❑ NGVD 1929 ® NAVD 1988 ❑ Other/Source: B12. Is the building located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area (OPA)? ❑ Yes ❑ No Designation Date: ❑ CBRS ❑ OPA SECTION C -BUILDING ELEVATION INFORMATION (SURVEY REQUIRED) C1. Building elevations are based on: ❑Construction Drawings' ®Building Under Construction' ❑Finished Construction "A new Elevation Certificate will be required when construction of the building incomplete: C2. Elevations - Zones Al -A30, AE, AH, A (with BFE), VE, Vl-V30, V (with BFE), AR, AR/A, AR/AE, AR/At-A30, AR/AH, AR/AO. Complete Items C2.a-h below according to the building diagram specified in Item AT In Puerto Rico only, enter meters. Benchmark Utilized: See comments Vertical Datum: NAVD 1988 Indicate elevation datum used for the elevations in items a) through h) below. ❑ NGVD 1929 ® NAVD 1988 ❑ Other/Source: Datum used for building elevations must be the same as that used for the BFE. a) Top of bottom floor (including basement; crawlspace, or enclosure -floor) b) Top of the next higher floor Check the measurement used. .470.32 c) Bottom of the lowest horizontal structural member (V Zones only) d) Attached garage (top of slab) e) Lowest elevation of machinery or equipment servicing the building (Describe type of equipment and location in Comments) 0 Lowest adjacent (finished) grade next to building (LAG) Elfeet El meters g) Highest adjacent (finished) grade next to building (HAG) h) Lowest adjacent grade at lowest elevation of deck or stairs, including structural support D -SURVEYOR, ®feet ❑ meters ❑ T^et ❑meters Elfeet meters Elmeters ❑ feet ❑ meters ❑ feet ❑ meters SECTION This certification is to be signed and sealed by a land surveyor, engineer, or architect authonzed by law to certify elevation information. /certify that the information on this Certificate represents my best efforts to interpret the data available. t understand that any false statement maybe punishable byline or imprisonment under 18 U.S. D -SURVEYOR, ENGINEER, ❑ feet ❑meters Elfeet ❑ meters SECTION This certification is to be signed and sealed by a land surveyor, engineer, or architect authonzed by law to certify elevation information. /certify that the information on this Certificate represents my best efforts to interpret the data available. t understand that any false statement maybe punishable byline or imprisonment under 18 U.S. D -SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION Code; Sectiori 9001. ® Check here if comments are provided on back of form. Were latitude and longitude in Section A provided by a ❑ Check here if attachments. licensed land surveyor? ❑ Yes ® No Certifier's Name Robert W. Bryan License Number 5508 Title R.P.L.S. Company Name Dowdy Land Surv eyors,. inc. Address. 6850 Manhattan Blvd. iY310 City Fort Worth State TX ZIP Code 76120 817.429.9898 yr P MMI W; ERY 550$ suv' FEMA Form 086-0-33 (7112) - See reverse side for continuation.- Replaces all previous editions. IMPORTANT: In these spaces, copy the corresponding information from Section A. FOR INSURANCE COMPANY USE Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No. Policy Number: 610 Westhaven Road City Coppell State Tx ZIP Code 75019 Company NAIC Number: SECTION D — SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION (CONTINUED) Copy both sides of this Elevation Certificate for (1) community official, (2) insurance agent/company, and (3) building owner. Comments Elevations are based on benchmarks provided by Kimley-Horn & Associates the engineer and surveyor of record for Westhaven Phasel. Signature Gil. SECTION E —BUILDING ELE� INFORMATION Date 07/29/2Q14 URVEY NOT REQUI FOR ZONE AO AND ZONE A (WITHOUT BF For Zones AO and A {without BFE), complete Items E1—E5. If the Certificate is intended to support a LOMA or LOMB -F request, complete Sections A, B, and C. For Items E1—E4, use natural grade, if available. Check the measurement used. In Puerto Rico only, enter meters. E1. Provide elevation information for the following and check the appropriate boxes to show whether the elevation is above or below the highest adjacent grade (HAG) and the lowest adjacent grade (LAG). a) Top of bottom floor (including basement, crawlspace; or enclosure) is ❑ feet ❑ meters ❑ above or ❑ below the HAG. b) Top of bottom floor (including basement, crawlspace, or enclosure) is ❑ feet ❑ meters ❑ above or ❑ below the LAG. E2, For Building Diagrams 6-9 with permanent flood openings provided in Section A Items 8 and/or 9 (see pages 8-9 of Instructions), the next higher floor (elevation C2.b in the diagrams) of the building is ❑ feet ❑ meters ❑ above or ❑ below the HAG. E3. Attached garage (top of slab) is ❑ feet ❑ meters ❑ above or ❑ below the HAG: E4. Top of platform of machinery and/or equipment servicing the building is ❑ feet ❑ meters ❑ above or ❑ below the HAG. E5, Zone AO only: If no flood depth number is available, is the top of the bottom floor elevated in accordance with the community's floodplain management ordinance? ❑ Yes ❑ No ❑ Unknown. The local official must certify this information in Section G. SECTION F — PROPERTY OWNER (OR OWNER'S REPRESENTATIVE) CERTIFICATION The property owner or owner's authorized representative who completes Sections A, B, and E for Zone A (without a FEMA -issued or community -issued BFE) or Zone AO must sign here. The statements in Sections A, B, and E are correct to the best of my knowledge. Property Owner's or Owner's Authorized Representative's Name Address City State ZlP Code Signature Date Telephone Comments ❑ Check here if attachments. SECTION G —COMMUNITY INFORMATION tLOrTIONAL) The local official who is authorized by law or ordinance to administer the community's floodplain management ordinance can complete Sections A, B, C (or E), and G of this Elevation Certificate. Complete the applicable item(s) and sign below. Check the measurement used in Items G8 -G10. In Puerto Rico only, enter meters. G1. ❑ The information in Section C was taken from other documentation that has been signed and sealed by a licensed surveyor, engineer, or architect who is authorized by law to certify elevation information. (Indicate the source and date of the elevation data in the Comments area below.) G2. ❑ A community official completed Section E for a building located in Zone A (without a FEMA -issued or community -issued BFE) or Zone AO. G3. ❑ The following information (Items G4—G10) is provided for community floodplain management purposes, G4. Permit Number G5. Date Permit Issued G6. Date Certificate Of Compliance/Occupancy Issued ur1 i nis permit nas oeen issuea tor: LJ New Construction. Q Substantial Improvement G8. Elevation of as -built lowest floor (including basement) of the building: El feet ❑meters Datum G9. BFE or (in Zone AO) depth of flooding at the building site: ❑ feet ❑ meters Datum G10. Community's design flood elevation: ❑ feet ❑ meters Datum Local Official's Name Title Community Name Telephone Signature Date Comments ❑ Check here if attachments FEMA Form 086-0-33 (7/12) Replaces all previous editions. . _...__..._..____.....