ST9601-CN 980512 AGENDA REQUES', FORM CITY 'iIL Ma 12, 1998 ITEM # ITEM CAPTION: Consider approval of awarding Bid/Contract #Q-0398-01 for the construction of Wrangler Drive to Tiseo Paving Company, Inc. in the amount of $1,650,508.15; and authorizing the Mayor to sign. SUBMITTED B enneth M. Gri~n, P.E. s~ ~ ~~~~~nov~ STAFF COMMENTS: See attached memo. BUDGET AMT. $ AMT. EST. $ +[- BUD:$ FINANCIAL COMMENTS: Funds have been allocated in the 1997 CO issue, in the amount of $1,200,000 for Street Construction. $100,000 has been allocated in the Water/Sewer CIP. The remaining funds are to be reimbursed by Pactrust and Catellus Development. DIR. INITIALS: ~ FIN. REVIEW: ~ CITY MANAGER REVIEW: MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Mayor and City Council From: Ken Griffin, P.E., Dir. of Engineering and Public Works ~'Z RE: Consider approval of awarding Bid/Contract #Q-0398-01 for the construction of Wrangler Drive to Tiseo Paving Company, Inc. in the amount of $1,650,508.15; and authorizing the Mayor to sign. Date: May 12, 1998 On April 28, 1998 three bids were received and opened for the construction of Wrangler Drive. Tiseo Paving Company, Inc. was the low bidder. Bid tabulations are attached for your review. This project is set up in two phases. The first phase is from Freeport to the eastern side of Coppell Middle School West. This phase is required to be completed prior to the start of school, August 11, 1998. A majority of the first phase is Unit I, Section 1 of the bid. Unit I, Section 1 is the portion of Wrangler between Enterprise Drive west to Freeport Parkway through the undeveloped land owned by Catellus and Pac Trust. The two property owners have committed to pay $377,784.20 for Unit I, Section 1 Paving and Drainage Improvements. (Unit I, Section 2 is for water line improvements which will be paid entirely by the City. Unit II, Section 1 is the remainder of the paving and drainage and Unit II, Section 2 is additional water line adjustments.) The City is also negotiating with the Coppell Independent School District on rebuilding a portion of their eastern entrance. That work is included in the bid. If the issue is resolved, then an interlocal agreement between the City of Coppell and the CISD will be brought to Council at a subsequent meeting for approval. The actual final cost to the City should be $1,272,723.95 for Unit I, Section 2 and Unit II, Sections 1 & 2. Of that amount, $78,252.50 is for water improvements to loop a 12" water line to Freeport Pkwy. Staff recommends awarding Bid #Q-0398-01 for the construction of Wrangler Drive to Tiseo Paving, Inc. in the overall amount of $1,650,508.15. As previously stated, $377,784.20 will come from adjacent property owners. Staff will be available to answer any questions at the Council meeting. "CITY OF COPPELL ENGINEERING-EXCELLENCE B Y DESIGN" ~ P.O. Box 478 he City With' e;,'utiful ~:utu 972-462-0022 tea B P.o. BOX 478 COPPELL, TEXAS 75019 May 1, 1998 F. Michael Nugent, Asset Manager Pac Trust Pacific Reality Associates L.P. 15350 S.W. Sequoia Parkway, Suite 300 Portland, OR 97224 RE: Wrangler Drive Project ST 96-01 Dear Mr. Nugent: On April 28, 1998 the City of Coppell opened bids for the consauction of Wrangler Drive. The bids received by the City of Coppell totaled $377,784.20 for the portion of Wrangler adjacent to the Pac Trust and Catellus property. The Engineering's estimate for the project was $380,646.00. On November 5, 1997, I provided information to you concerning the estimated cost of the project and calculations where approximately 41% of the cost would be paid by Pac Trust. On March 6, 1998 you acknowledged that Pac Trust was willing to participate in the cost sharing as previously provided. Therefore, the participation by Pac Trust will be in the amount of $154,891.52 (377,784.20 x 41%). The associated water improvements along this section total $40,673.40. As previously indicated the entire cost for the water line improvements is 'being paid by the City of Coppell. It is the City's intention to award this project at the May 12, 1998 City Council meeting. Arrangements should be made as soon as possible to provide the City of Coppell the appropriate funding in the amount of $154,891.52 so that the entire project can be awarded and constructed as designed. If you should have any questions please feel free to contact me at (972)304-3679. Kenneth M. G P.E. Director of Engineering and Public Works PACTRU:Zr - Portland. Oregon 97224 Pacific Realty Associates, L. R 503/62~6300 · Facsimile: ,503/62~7755 March 6, 1998 BY FACSIMILE - 972/304-3570 Kenneth M. Griffin Director of Engineering and Public Works City of Coppell P.O. Box 478 Coppell, TX 75019 Dear Mr. Griffin: Based on the enclosed sketch and letter we are in agreement with the method of cost sharing calculation outlined. We understand that the portion for our frontage will be approximately $156,064.00. We understand that the estimated cost outlined in your letter may change depending on the outcome of the bidding process. We agree to provide the pro rata share of the road construction cost based on the frontage outlined on the enclosed sketch and letter, provided the final costs are not more than five percent higher than $156,064.00. In the event the costs differ significantly from your projections, please contact us so we may discuss how to proceed. Sincerely, PARK WEST COMMERCE CENTER, L.L.C. By: PAC/SIB L.L.C., a Washington limited liability company, General Parmer By: Pacific Realty Associates, L.P., a Delaware limited partnership, managing member By: PacTrust, Inc., a Delaware corporation, General Partner By: J · ~ F. Michael Nugent Asset Manager Encls. cc: Marc Myers (w/Encls.) Coy facsimile 214/520-2015) B. David Littleton (w/Encls.) Coy facsimile 214/739-7084) May 1, 1998 Stephen L. Bryan, Director of Development CateRus Development Corporation 4545 Fuller Drive, Suite 100 Irving, Texas 75038 RE: Wrangler Drive Project ST 96-01 Dear Mr. Bryan: On April 28, 1998 the City of Copper opened bids for the construction of Wrangler Drive. The bids received by the City of Copper totaled $377,784.20 for the portion of Wrangler adjacent to the CateRus and Pac Trust property. The Engineering's estimate for the project was $380,646.00. On November 5, 1997, I provided information to you concerning the estimated cost of the project and calculations where approximately 59% of the cost would be paid by Catellus. On February 26, 1998 you acknowledged that Catellns was willing to participate in the cost sharing as previously provided. Therefore, the participation by Catellus will be in the amount of $222,892.68 (377,784.20 x 59%). The associated water improvements along this section total $40,673.40. As previously indicated the entire cost for the water line improvements is being paid by the City of CoppeR. It is the City's intention m award this project at the May 12, 1998 City Council meeting. Arrangements should be made as soon as possible to provide the City of Copper the appropriate funding in the amount of $222,892.68 so that the entire project can be awarded and constructed as designed. If you should have any questions please feel free to contact me at (972)304-3679. Sincerely, ~.~ Kenneth M. Griffin, P.E. Director of Engineering and Public Works CATELLUS February 26, 1998 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell PO Box 478 Coppell, Texas 75019 RE: Dedication of Freeport Parkway and Wrangler Drive Dear Ken: Attached are executed Special Warranty Deeds covering the conveyance of Freeport Parkway and Wrangler Drive. Also, we have included an Exhibit "B" to the deeds relative to exceptions to title and have made reference to same in the body of the deeds. In reviewing the deeds, our attorney wanted to make it clear that in accepting the deeds, the city is taking over maintenance, etc. In lieu of changing the deeds he suggested we simply have a letter agreement for the City's signature when accepting the deeds. Accordingly, please also find enclosed two letter agreements, in duplicate, for the City's review and signature. If all is in order, please return one fully executed letter agreement for each conveyance. I would also appreciate a copy of the fully recorded deeds when available. I have received a letter from, presumably, your office requesting Catellus acknowledge the cost sharing arrangement between Catellus and PacTrust relative to the Wrangler Drive construction. Accordingly, please accept this letter as Catellus' agreement with the method of cost sharing calculation for the Wrangler Drive improvements. Catellus further understands that the estimated cost to Catellus of $224,582 is an estimate and is subject to adjustment depending on the outcome of the bidding process, but in no event will the prorata cost to Catellus exceed $260,000. I appreciate your help in getting the Freeport Parkway matter brought to a close and should you have any questions concerning the above, please do not hesitate to give me a call. Director, Development CATELLUS DEVELOPMENT CORPORATION 4545 FULLER DRIVE, SUITE 1130, IRVING, TEx~s 75038 (972) 719-6101 FAX (972) 719-6149 BID TABULATION W~,ANGLER DRIVE PROJECT / ST UNIT I Section 1 - Paving and Drainage Improvements I Q U Description Engineer's Ed Bell Construction McMahon Co. Contracting, Inc. t u n Estimate 10605 Harry Hines P.O. Box 153086 e a i Blvd. Irving, TX 75015 m n t Dallas, TX 75220 972/399-1951 t 214/358-6581 i t I-I 1 LS Prepare Right Of-Way 10,000.0C 10,000.0C~i ............. 10,000.0O 10,000.0018,500.00 18,500.0 1-8 125 SY Concrete Paving-Stone Pavement 60.0 7,500.0(~i!i!~!ii~iiii~ 75.0~ 1-9 120 LF 3" PVC Conduit Sleeve for Freeport Pkwy Intersection10.0(1,200.0( 6.5C 780.00 5.00 600.0 1-13 1 LS Res~reParkways&YardsHydmmulch(Approx2450SY) 5,500.00 5,500.0(it~ ...... I~0~ 2,200.0( 2,200.00 5,000.00 5,000.0 1-16 I EA Thetmopiastic Word ("ONLY") P ..... t Marking (Type I200.00200.0(/~i~ii~ii~Ij~;>~ii:~i~:~i:~iiiiiiii:;~i~ii~~260.00260.00 ~290.0C290.0 1-18 10 EA Type P-15W 4' White Reflective Traffic Buttons5.00 50.0~ii!iiiiiii~iiii!i!~i~~ 6.60 66.00 7.0~ 70.0 1-22 118 LF 30- RCp (Class III) 65.00 7,670.00 1-31 I EA 10' Recessed Curb Inlet 2.500.0( 2,500.0( ! 2,500.0~ 2,500.00 2,500.00 2,500.0 Str~TOTAL UNIT I- Setion 1 ~! !ii!i I~i 377,412.30 380,043.00 ~ I~ i · If !/ /~ ~ 381,201.00 BID TABULATION WRANGLER DRIVE PROJECT / ST 96-01 UNIT I Section 2 - Water Improvements m n t ii~ .... ii~i/i~ii2!~:' BIrd. Irving, TX 75015  D~lh~, TX 75220 972/399-1951 i ,, ,:l~:,i ,,~- i~;~:i~i¥ ~. ~iUnit 1-38 20 LF 8' Ductile Iron W~r Pi~ (C1~$ 51) 35.~ 7~.~ ~7.~ 7~.~ 31.~ 620.~ 1-39 10 LF 6" PVC Wa~r Vi~ (DR 14) ~.~ 250.~ ~ii~ ~i~ ~,.~i~i~iiiiiii,~:i~,ii~i~i27.~ 270.~ 27.~ 270.~ [-43 I ~ 6' Ga~ V~ve ~.~ ~.~ ~ ,,,, 1,1~.~ 1,1~.~ 550.~ 1-46 885 LF Tr~h Safe~ for W~r Li~ Ins~lafion 2.~ 1,770.~ ~i~ii~ .................................. ~2.~ 1,770.~ 1.~ 885.~ ~T~ ~ I - ~on 2 43,395.~ 49,~5.~ ~,3~.00 ~id It~ 1-35 ~ I~ ~T~ ~ ~ Bm 423,438.~ 426,857.30 425,566.~ ~id I~ I-1 ~ I~ ' BID TABLTLATION "" VVt,ANGLER DRIVE PROJECT / ST UNIT II Section 1 - Paving and Drainage Improvements I Q U Description Engineer's Ed Bell McMahon Construction Co. Contracting, Inc. t u n Estimate 10605 Harry Hines P.O. Box 153086 e a i Blvd. Irving, TX 75015 m n t Dallas, TX 75220 972/399-1951 t 214/358-6581 i t ~11-1 t LS Prepare Right-of-way 75,000.0( 75,000.00 i ~ m,000.00 10,000.0C SS,500.00 SS,500.0~ 1I-2 250 LF Remove existing Concrete Curb Or Concrete Curb & Gutter5.0(1,250.00!l!;liii!i~ii~!iilli!:: II-5 1 EA Remove & Relocate Existing Street Light Assembly1,750.0(1,750.0(,// ,~,,~i; ii:g~l!~ g~iigii~iiig%gLii~g~ii;~g~i:~g~g:~i~g~i~20.002,000.0(3,900.003,900.0(3 i% it~i/~ iI~ ~ ~ ! I 2.00 39,330.0( 1.65 32,447.25 i? 125.00 36,875.0( 95.00 28,025.0( iiiiiii~.~l!~i;.~i~l~li~ il; .i i!i~! !~i35.0(357,575.0(27.0(344,415.0( .-12 g00 s~ ,-~.A .1 ~,.~b,e C~ S~nc ~ ~ ..... ,~= 35.~ ,6.625.00 g' gi!g!~!~ ,0.~ g.~0.0( ,0.5~ 11-15 2445 SF 4" Reinforced Concrete SW & Barrier-Free SW Ramps4.009,780.00 iiiiiii 8,557.5( 7,579.5( Ibis 22 EA Adjust Existing Water Valve Box to Grade200.00 4,400.00~g~ill 125.00 2,750.00 150.0( 3,300.0( 11-1~ 2 EA Adjust Existing Sanitary Sewer Cleanout to Grade 200.00 400.0e II~!~!i~!:~ iiii~;iii~iiiiiiig!~iii~li25O.00 500.00 375.0( 750.0( 11-23 1 LS RestoreParkways&Yards-atockS~(Approx. 9450SY) 55,000.~ 55,000.0(;;iI~!~ iiiiiii~.iiiiiiiiiiiiiiii!~i~ii32,000.0032,000.00 35,000.00 3~,000.00 I1-24 I LS Restore Parkways & Yards - Hydromulch (App. 4475 SY)10,O00.0C 10,000.0(IIll~l~ ............ 4,000.004,000.0(39,000.009,000.00 II-27 4 EA The=plastic Word ('ONLY") Pavement Marking (Type 1 200.1I 800.11 gggg!gg~,,gggg ,,-=,lgEA,,pe ~-7,~ 4' ,~bite ~o,-~,.~ti,e ~.,~fi~ Bo.n.,3.0( ,,.0(igiiiii~!i~gggg~,.5o~.o~5.® li-29 18 EA Type P-15W 4' White Reflective Traffic Buttons5.0( 90.0( g ~ ~ 6.60 118.8C 7,00 126.0(3 1,-30 375 EA Type V-ll7Y 4" Yellow Double Refleetive Traf~c Buttons ,5.00:1,875.0(gggi~gg~igggg~gggg~,~g~ggggiig~g6.602,475.0(7.002,625.0C 11-31 6 EA Roadside Sign Assembly 50CI.00 3,000.0(}1 ~g ;~ iii 250.130 1,500.0( 200.00 1,200.0( 11-32 216 L~ 18" ,~c~ <c,,,s ,II> 45.00 ~,7=0.0(ggg!~g ggggi~ 52.00 1L232.0( ~0.00 8.6~0.0( 11-33 116 LF 21" RCP (Class I[I) 50.00 5,800.0(igg ...... 56.00 6,496.0( 49.00 5,684.0( 1,-,410L~24- ~c~ <c,., ,,,,55.00 ,,0.0( ig~g g~6,.~610.0( .... "' BID TABULATION -'- W :~ANGLER DRIVE PROJECT / ST 9,, dl UNIT II Section 1 - Paving and Drainage Improvements I Q U Description En~neer's Ed Bell McMahon Construction Co. Contracting, Inc. t u n Estimate 10605 Harry Hines P.O. Box 153086 e a i Blvd. Irving, TX 75015 m n t Dallas, TX 75220 972/399-1951 t 214/358-6581 i t Y Unit Total ! ii~ iii Unit Total Total Total ......... ~ /I ......... ~ ~ II-35 263 LF 27" RCP (Class Ill) 60.00 15,780.0C ~ii~iii~iiii~i~;! ii!i;ii~iiii~ 69.0C 18,147.00 59.0C 15,517.00 H-36 187 LF 30" RCP (Class Ill) 65.00 12,155.0~ l,~:/// ~/· ~/'I/ ..... 74.0C 13,838.00 63.0C 11,781.00 II-39 432 LF 4' x 3' Concrete Box Culvert 135,~ 58,320.0(3 in / I I i ~ I 145.0( 62,640.0( 134.0(3 57,888.00 II-40 1298 LF 5' x 3' Concrete Box Culvert 170.0C 220,6~0.0~ i~iiiiiiiii~iiiiiiiii~i :i i-~/!i!iiiiiiiiii!iiii~ ~175.0(227,150.0( 154.0C 199,892.00 11-43 I EA 4' Square Storm Drain Manhole 2,750.0C 2,750.0( ~1/~ ~/ ~ ;~ ~ :;;:;;~;:: ............ ~:;;:1: ~l:4,600.004,600.0( 4,000.0( 4,000.00 1|-44 I EA 5' Square Storm Drain Manhole 3,250.0C 3,250.0( iiiii~i~il~i~i~li~;i~] 5,000.00 5,000.0( 5,000.0( 5,000.00 :~t ..... ........... ~ 2,500.00 12,500.0( 2,100.0( (Bid Items II-I thru 11-53) BID TABULATION "' V~tcANGLER DRIVE PROJECT / ST h,-01 UNIT II Section 2 - Water and Sanitary Sewer Adjustments iii P.o. e a i m n t i 214/358-6581 11-59 I ~ Adjust/~wer Existing 12~ W~r Lira - Sta. 37 +20 5,~.~ 5,~.~ ~;~ ~ ~ ~ ~ ~ ~ H-61 I ~ Adjus~wer E~s~ng 8" W~er Li~ - S~. 3] +~ 5,~.~ 5,~.~ 4,~.~ 4,~.~ 2,3~.~ 2,3~.~ II-63 4 ~ Re~ve/Rel~,~ E~sfing Fi~ Hydmt A~mbly 1.~.~ 4,~.~ 8~(~ ~ 2,~.~ lO.~.~ 1.8~.~ 7,2~.~ S.b~Inl ~ H - ~tion 2 ~7,740.~ $~4,535.~ ~o,~s.00 (Bid ~ H-54 ~ H~ TOTAL B~ ~ H (rod ~ n-~ ~ n~ $1,429,348.~ $1,410,470.Z0 $1,372,731.12 (lid lt~ I-1 t~ I~ and ~ H-I t~ H~ $1,852.7~.~ $1,837,327.50 $1,798,2~.12