Loading...
151 Coffee Addition-PT201204CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Address of Applicant Survey/Abstract #AcreageOR 1.Type of proposed construction or development: 2.Description of Construction Permit requested: Provide an attachment containing the name and 24-hr. contact phone number of supervisor(s) for every contractor working under this general permit. 3.All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance. 4.Applicant shall provide a copy of approved plans, specifications and the related cost estimate or contract for the purpose of permit fee calculation verification. Section #Subdivision Block #Lot # Name of Applicant Date Submitted Phone Number Fax Number Location of Construction (address, if available): Location description (attach vicinity map): Drive Approach Fire Lane Bridge Paving Sidewalk Excavation Median or Landscape Water Main R.C.P. Sanitary Sewer Main Flume Inlet Box Culvert Rip Rap Fill Area Drainage Channel Excavation Slope Protection/Retaining Wall Parking Lot Residential Alteration of a natural waterway drainage course Placement of Fill (in right-of-way or on private property) Other (describe & attach drawing or sketch) Non-Residential 6242 Rufe Snow Dr Ste 226, North Richland Hills, Texas 76148 151 Coffee Addition A 1 151 COffee To Go, LLC 12/4/20 208-449-8821 131 S DEnton Tap, Coppell, Texas Page 1 of 3 Rev 09-2020 CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2 5.A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with the City of Coppell Fee Ordinance. See Page 3 for calculation formula. Amount Due: $Date Paid: NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the right-of-way not approved by the City Engineer. ØAny work requiring closure of a lane of traffic, street, or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department @ 972-304-3600 Street Department @ 972-462-5150 Fire Department @ 972-304-3512 Engineering Dept. @ 972-304-3679 ØAttach barricade plan / trench safety plan of a lane or street closure. (Required) ØIt is a requirement of this permit that As-Built Drawings be turned in at the end of this project. As-Builts consist of 1 set full size paper copy, 1 set full size mylar and a CD with Autocad.dwg files. NOTE: Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY unless otherwise approved by City Engineer. ØA pre-construction meeting is required prior to beginning work related to this permit. Contact the inspector assigned to your project to schedule the meeting. FOR CITY USE ONLY Is the fill area located in an identified flood hazard area? Yes No Are other federal, state, or local permits required? Is additional information required? If YES, a Floodplain Development Permit is required before any construction can begin. No Yes Yes No Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. Printing your name indicates your acceptance of the terms and conditions of this form: Contact Number Contact Number Date PERMIT APPLICATION APPROVED PERMIT APPLICATION DENIED Signature of Applicant Signature of Inspector City Approval 6605 12/7/20 208-449-8821 Danny Giesbrecht PUBLIC IMPROVEMENTS CONTRACT AMOUNT X 4% =PRIVATE IMPROVEMENTS CONTRACT AMOUNT X 2% = Paving Water Sanitary Sewer Storm Sewer Alleys Sidewalks Other Total As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and inspected by the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees are due on or before the date of the Pre-construction Meeting. INSPECTION FEE CALCULATION SHEET Project Name Date In order to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet with completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following improvements: Grand Total (total of both colored fields) Page 3 190500 5715 2500 100 4000 120 8500 340 11000 330 11000 440 205500 6165 151 Coffee To Go. LLC 12/4/20 6605 Submit by E-mail Print Form 3% 3% = Budget Line Item Phase Code Cat Code SOV loc Description of Work BUDGET DIVISION TOTALS $/G.S.F. GROSS SQUARE FEET 858 PROJECT TIME IN MONTHS 4 I. GENERAL CONDITIONS 1 01-500 EXP 1a Mobilization $5,000 $6 2 01-041 STL Project Superintendent $32,000 $37 3 01-012 STL 1a Project Management $8,000 $9 4 01-500 RE Rental of Temporary Facilities, Equipment, etc. $2,000 $2 5 01-500 EXP Other General Conditions Costs 6 01-015 SUB Architectural & Engineering Services 7 01-016 SUB ADA Final Inspection 8 01-500 SAF Job Safety Traffic Control $500 $1 9 01-500 EPA EPA Inspections SWPP $2,000 $2 10 17-001 AAA Travel 11 01-780 PMT Permits 12 01-850 Hook-Up Fees and System Development Charges 13 01-500 TPE Temporary Electric $500 $1 14 01-500 TWA Temp Water Meter & BF $500 $1 15 01-760 GL General Liability Insurance $4,585 $5 16 01-760 BR Builder's Risk Insurance $5,000 $6 17 01-760 WS Flood Insurance 18 Asbestos Survey 19 Asbestos Abatement 20 Bid Expense 21 01-041 TEXP Super Truck $6,000 $7 22 01-500 TMP Temp Fence $3,500 $4 23 01-500 SEC Security 24 01-500 LBR Labor Burden 32% $12,040 $14 25 01-500 EXP Fuel $2,000 $2 26 01-500 EXP Copy Plans and Office Supplies $500 $1 27 Rental Small Equipment $2,500 $3 28 29 30 31 Ia. CLEANING 32 01-545 CL Casual Labor Cleaning $6,000 $7 33 01-545 SUB General Cleaning 34 01-710 SUB Final Cleaning $500 $1 35 01-545 DEB Debris Removal/Concrete Washout $3,500 $4 36 37 38 39 40 41 x GENERAL CONDITIONS TOTAL $96,625 $96,625 $113 II. SITE WORK Site Preparation 42 02-001 ENT Construction Entrance 43 02-060 Site Demolition 44 02-001 CLR Clearing & Grubbing 45 02-001 SUB Excavation & Grading $48,300 $56 46 02-001 LIM Lime Stabilization $20,700 $24 47 02-001 SUB Import, Place, Fill 48 02-361 Wood Pilings PROJECT BUDGET 49 02-001 SIL Erosion Control 50 02-281 SUB Termite Control $400 $0 51 02-001 RTW Retaining Walls 52 01-330 SUB Surveying & Staking $3,000 $3 53 02-011 SUB Testing & Labs 54 Wash Pit $2,000 $2 55 SWPPP Narrative 56 Spoils Haul Off Relocate $0 $0 57 Gravel $0 58 59 60 61 62 63 64 65 66 x Site Preparation SubTotal $74,400 $87 Site Finish 67 02-510 SUB Asphaltic Paving 68 02-831 CLF Wire Mesh Fences & Gates 69 02-831 TSF Tubular Steel Fences & Gates $2,650 $3 70 02-831 WF Wood Fences & Gates 71 02-831 CMU CMU Fences & Columns 72 02-831 GAT Automatic Gate 73 02-831 OPN Gate Opener 74 02-580 SUB Striping & Misc. Exterior Signage $1,800 $2 75 02-901 Landscaping Allowance $20,000 $23 76 02-853 BOL Bollards $600 $1 77 Bollard Covers $200 $0 78 Wheel Stops 79 Power Wash 80 PVC under Slab 4" $0 $0 81 82 83 84 85 86 87 88 89 90 x Site Finish SubTotal $25,250 $29 Site Utilities 91 02-811 SUB Irrigation System 92 02-722 STM Storm Drainage $0 93 02-732 SAN Domestic Water Tap and Meter box $2,500 $7 94 02-665 FIR Domestic Water Lines $4,000 $17 95 Landscape Irrigation $7,800 96 Gas 97 Fire Lines & Hydrants 98 Spoil Haul Off $5,000 $6 99 French Drain both sides of building $0 $0 100 Sewer Tap $2,500 101 Sewer Lines $6,000 102 103 104 105 106 x Site Utilities SubTotal $25,000 $29 Off Site 107 02-510 OFF Street Improvements $0 $0 108 02-550 FIR Off Site Fire Hydrants $0 $0 109 110 111 112 113 114 115 116 117 118 119 x Off Site SubTotal $0 $0 x SITE WORK TOTAL $124,650 $124,650 $145 III. CONCRETE 120 03-300 FOU Slab On Grade $20,000 $23 121 03-300 FOU Mezzanines 122 03-300 SLG Concrete Floor Sealing $2,000 $2 123 03-300 FOU Concrete Piers 18" x 8' 531 peirs $0 124 03-300 PAV On-Site Flat Concrete Paving $116,500 $136 125 03-300 CBS Curbs, Sidewalks, HCC $11,000 $13 126 03-300 OFF Approach, Curbs, Gutters, & Offsite Sidewalks 127 03-300 FEN Fence Column Footings 128 03-300 RTW Concrete Retaining Walls & Footings 129 03-300 BLD Tilt-Up Walls 130 Precast Concrete 131 Trench Drain 132 03-300 PAV Transformer Pads 133 Light Pole Bases $5,000 $6 134 135 136 137 138 139 140 141 142 143 x CONCRETE TOTAL $154,500 $154,500 $180 IV. MASONRY 144 04-001 SUB Masonry & Resteel $28,000 $33 145 146 147 148 149 150 151 152 153 154 155 156 x MASONRY TOTAL $28,000 $28,000 $33 V. METALS 157 05-120 STR Structural Red Iron $20,000 $23 158 05-500 HAT Roof Hatch 159 05-500 SUB Miscellaneous Metal 160 Lintels $1,500 $2 161 05-510 SUB Steel Stairs 162 163 164 165 166 167 168 169 170 x METALS TOTAL $21,500 $21,500 $25 VI. WOOD & PLASTIC 171 06-110 SUB Rough Carpentry $18,000 $21 172 06-110 STR Wood Trusses & Lumber $11,500 $13 173 06-200 SUB Finish Carpentry 174 06-410 SUB Cabinets, Millwork, Vanities, CounterTops, & Shelving 175 176 177 178 179 180 181 182 183 184 185 186 x WOOD & PLASTIC TOTAL $29,500 $29,500 $34 VII. THERMAL & MOISTURE PROTECTION 187 07-200 SUB Office/Apt Wall Insulation $1,000 $1 188 07-100 WAL Waterproofing 189 07-001 ORF Office Roofing 190 07-900 SUB Caulking & Sealants $1,500 $2 191 07-241 SUB EFIS/Stucco 192 07-270 SUB Firestopping 193 Sheathing 194 07-001 TPO TPO Roofing 195 Standing Seam $22,000 $26 196 197 198 199 200 201 202 203 x THERMAL & MOISTURE PROTECTION TOTAL $24,500 $24,500 $29 VIII. DOORS AND WINDOWS 204 08-101 HM Hollow Metal Doors & Hardware $3,600 $4 205 08-201 WD Wood Doors & Hardware 206 08-460 SUB Automatic Doors 207 08-410 SUB Storefront & Windows $23,347 $27 208 Install Doors 209 Knox Boxes $400 $0 210 211 212 213 214 215 216 217 218 219 x DOORS & WINDOWS TOTAL $27,347 $27,347 $32 IX. FINISHES 220 09-111 SUB Metal Stud & Drywall Systems $3,500 $4 221 09-680 SUB Carpet & Cove Base 222 09-650 SUB Vinyl Tile & Cove Base 223 09-301 Ceramic Tile 224 09-111 FW Fire Walls 225 09-680 RM Rubber Mat Flooring 226 09-275 FRP $6,000 $7 227 09-900 SUB Painting $2,000 $2 228 09-511 SUB Suspended Ceiling $2,200 $3 229 230 231 232 233 234 235 236 237 238 239 240 x FINISHES TOTAL $13,700 $13,700 $16 X. SPECIALTIES 241 10-440 Unit Signage 242 10-440 CL Unit Signage Installation Only 243 10-522 SUB Fire Extinguishers & Cabinets 30 $275 $0 244 11-452 MAT Residential Appliances 245 10-800 MAT Toilet Accessories, Mirrors, etc. $850 $1 246 Install Accessories 247 248 249 250 251 252 253 254 255 256 257 258 x SPECIALTIES TOTAL $1,125 $1,125 $1 XI. EQUIPMENT 259 Equipment $0 $0 260 261 262 263 264 265 266 267 268 269 270 x EQUIPMENT TOTAL $0 $0 $0 XII. FURNISHINGS 271 12-500 Window Treatments $0 $0 272 273 274 275 276 277 278 279 280 281 282 x FURNISHINGS TOTAL $0 $0 $0 XIII. METAL BUILDINGS AND SYSTEMS 283 13-121 SUB Metal Building System $0 $0 284 08-331 SUB Roll-Up Doors, Corridors & Openers 285 13-121 CEI Mesh Ceilings 286 13-121 SUB Swinging Doors 128 each $0 $0 287 Gutters & Downspouts $0 $0 288 289 290 291 292 293 294 295 296 297 x METAL BUILDINGS AND SYSTEMS TOTAL $0 $0 $0 XIV. ELEVATORS 298 14-245 SUB Elevators- (1) 2-stop $0 $0 299 Checker Plate Floor $0 $0 300 301 302 303 304 305 306 307 308 309 x ELEVATORS TOTAL $0 $0 $0 XV. MECHANICAL 310 15-400 SUB Plumbing $47,400 $55 311 15-325 SUB Fire Sprinklers 312 15-500 SUB HVAC, Storage Buildings $0 313 15-500 SUB HVAC $18,000 $21 314 315 316 317 318 319 320 321 322 323 324 x MECHANICAL TOTAL $65,400 $65,400 $76 XVI. ELECTRICAL 325 16-010 SUB Electrical, Lighting Fixtures, and Distribution $46,500 $54 326 16-010 CDT Security & Alarm System Conduit 327 16-721 SUB Smoke Detection & Fire Alarm System $5,000 $6 328 16-727 Security Access System Allowance 329 Additional Drops 74 each @ 500 $0 330 331 332 333 334 335 336 337 338 339 340 x ELECTRICAL TOTAL $51,500 $51,500 $60 XVII. SUB TOTAL COST PROPOSAL 341 x Sub Total Cost Proposal $638,347 $638,347 $744 XVIII. FEE (OVERHEAD & PROFIT) 342 10.00%x Fee (Overhead & Profit) $63,835 $74 XIX. CHANGE ORDER ALLOWANCE 343 x Change Order Allowance $0 $0 XX. TAXES 344 x Sales Taxes $0 $0 XXI. TOTAL PROPOSAL (CONTRACT SUM - Excluding Bond) 345 x Contract Sum (Excluding Bond)$702,182 $818 XXII. BOND 346 N x Bond Cost $0 $0 XXIII. TOTAL PROPOSAL (CONTRACT SUM - Including Bond) 347 x Contract Sum (Including Bond)$702,182 $818 Enter Y above if Job is Bonded Enter S.Tax Rate Above (if taxable)