ST9904-CS011012 (2) Department TxDOT SH 121 TASK FORCE REPORT ~f Transportation Note: Section numbers in narrative below correspond to numbers on drawings. October 12, 200! I. COMPLETED PROJECTS Section From To Description Date Completed 1 Tarrant CL Denton CR 4-lane ML w/2-lane FR Jul 1992 2 Denton CR IH 35E 4/6 lane divided highway Nov 1993 3 IH 35E FM 1171 6-lane divided highway Jun 1991 4 FM 1171 Elm Fork 6-lane divided highway Jul 1988 5 Elm Fork BNRR 4-lane divided highway Feb 1994 5B Crider Road FM 423 Eliminate intersection Sep 1995 _ 6 BNRR __ Legacy 4-lane divided highway Mar 1994 7 Legacy SH 289 4-lane divided highway May 1995 9 Denton CR Denton Tap Road BP: 3-lane frontage roads Oct 1998 10 Denton Tap Road Lake Vista BP: 3-lane frontage roads Jul 1988 11 Lake Vista IH 35E BP: 3-lane frontage roads Jun 1996 12 IH 35E FM 544 BP: 3-lane frontage roads Oct 1999 II. DENTON COUNTY PROJECTS A. Section 13: Tarrant County Line to North of Denton Creek (conversion to freeway)(CSJ 0364-02-017 & 0364-03-064) 1. 2. Estimated Construction Costs: CSJ COUNTY FROM TO Length COST 2002 UTP STATUS 0364-02-017 Dallas Tarrant CL Denton CL 1.728 $51,000,000 pfiorityl 0364-03-064 Denton Dallas CL Denton Crk 0.300 $ 9,100,000 Priofityl Total $60,100,000 3. TxDOT's Fort Worth District is including this section of the SH 121 Free- way in an ongoing MIS, Schematic, and EA consultant contract they have in the area. The Fort Worth District is working closely with the City of Grapevine to develop the transportation needs in the area. The following are estimated milestone dates: Page 1 of 4 Updated: 10/22/01 9:26 DESCRIPTION ESTIMATED DATE MIS Complete Public Meeting: Preliminary Schematic and EA findings presented. Winter 2002 Public Hearing: Final Schematic and Final EA presented. Fall 2002 4. The Public Meeting and Heating dates have been pushed back to allow the consultant to address Grapevine and Coppell ramp location concerns. Traffic counts need revising due to infrastructure limitations not being accounted for. Austin is indicating traffic counts Will be available bY the end of this month (October 2001), Review of Grapevine ramp revisions is on hold awaiting the revised traffic counts. B. Section 14: Existing SH 121 Near Denton Creek to Existing SH 121 Near FM 544 (Lewisville Bypass)(Mainlanes)(CSJ 3547-03-003, 3547-02-004, 3547- 01-005, 3547-01-008, & 3547-01-009) 1. 2. Estimated Construction Costs: CSJ Designer County FROM TO Length COST 3547-03-003 Denton Co- Halff Denton SH 121 Dallas CL 0.500 $ 5,834,249 3547-02-004 Denton Co - Halff Dallas Denton CL Denton CL 1.800 $13,360,541 3547-01-005 Denton Co - Halff Denton Dallas CL Lake Vista 1.085 $ 8,273,427 3547-01-008 Denton Co- Halff Denton Lake Vista IH35E 0.730 $49,062,175 3547-01-009 Denton Co- C&B Denton Hebron FM 544 3.432 $34,365,141 Total $110,895,533 C. Section 15: Denton County Portion: FM 544 to DNT Bridgefarmer Design 1. The Texas Transportation CO~ssion at the~ JUly: 2~1 m~ting under the Innovative Financing Program advanced these frontage road Projects to Priority 1 in Category 3A NHS M°bility, 2. Frontage Road Estimated Construction Costs (6-lane frontage roads): CSJ County FROM TO Length COST 2002 UTP STATUS 0364-03-066 Denton FM 544 FM 423 1.917 $ 8,266,780 PriOrity 1 0364-03-067 Denton FM423 Collin CL 3.030 $13,442,447 Priority 1 0364-04-038 Collin Denton CL DNT 0.982 $ 4,188,588 Priority 1 Total $25,897,815 Page 2 of 4 Updated: 10/22/01 9:26 AM 3. These mainlane projects will be funded with a combination of local funds and funding from the North Central Texas Council of Governments (NCTCOG). 4. Mainlane Estimated Construction Costs (Add 6-lane mainlanes to 6-lane frontage roads): CSJ County FROM TO Length COST 0364-03-086 Denton FM 544 FM423 1.917 $12,773,571 0364-03-087 Denton FM423 Collin CL 3.030 $20,066,261 0364-04-039 Collin Denton CL DNT 0.982 $ 6,545,887 Total $39,385,719 III. COLLIN COUNTY PROJECTS A. Section 15: Collin County Portion: DNT to US 75 1. Frontage Road Estimated Construction Costs (6-lane frontage roads): CSJ County FROM TO Length COST I JETTING DATE 0364-04-023 # Collin DNT Interchange $42,200,000 I L200! 0364-04-022 Collin DNT US 75 10.739 $67,525,000 10-2002 Total $109,725,000 # NTTA project with joint funding: NTTA = $29.0M; TxDOT = $13.2M. Note: The Minute Order allowing the NTTA to construct the DNT Interchange was executed by the Texas Transportation Commission at its March 2001 meeting. 2. Additional cost to add mainlane overpasses at cross-streets (allowing through traffic to bypass intersections) to the 0364-04-022 project: CROSS-STREET ADDITIONAL COST Rasor / Hilcrest Road $6,203,933 Colt Road $4,560,874 Independence Parkway $4,473,293 Rowlett Road $4,925,420 Stacy Road $4,153,717 Lake Forest Road $4,016,494 Watters Road $4,416,029 TOTAL $32,749,760 Page 3 of 4 Updated: 10/22/01 9:26 AM 3. Mainlane Estimated Construction Costs (Add 6-lane mainlanes to 6-lane frontage roads): CSJ County FROM TO Length COST 2002 UTP PRELIM RANKINGS 0364-04-037 Collin DNT SH 289 1.515 $13~0~,000 P2 (41 of 57) * 0364-04-024 Collin SH 289 US 75 9.059 $57,530,000 LRP (73 of 121) Total $70,530,000 · NCTCOG will propose to the RTC to fund this project with Category 4C funds while concurrently submitting the project as a candidate for Co~ssion Strate~c ~ority Funding (Category 12). Page 4 of 4 Updated: 10/22/01 9:26 AM