ST9904-MP011001 (2)
Halff Associates SH 121- Interchange Progress Report October 2001 · Centerline Geometry finished/fit to existing projects · Paving plan - profile 60% complete · Typical sections - 90% complete · Superelevation Data - 95% complete · Retaining wall layouts - 30% complete · Ditch plan - profile 60% complete · Drainage plan - profile 10% complete · Striping plan - 30% complete · Small signs - 30% complete · Large signs - Layouts - 30% complete · Bridge layouts - 50% complete · Cross sections - 10% complete · Hydraulic modeling and report - draft submittal 9/14 · Identified two ROW parcels for acquisition - submittal to ROW section 9/14 · TCP - HNTB developed sequence and 30% plans, requires TxDOT approval · All existing information from TxDOT complete · Decisions pending from TxDOT from the last meeting - attached STATE HIGHWAY 121 IN', ~ANGE DESIGN SCHEDULE 2001 t Nov I Dec Jan 2002 Task Name Start Finish Apr I May l Jun I Jul [Aug I Sepl Oc I Febl Mar I Apr I May[ Jun [ Jul I Aug [Sepj Oct, Task 1, Field Survey Mon 5/7/01 Fri 7/27/01 : :. Task 2, Geotechnical Mort 5/'7/01 Fri 7/27/01 ~ Task 3, Utility Coordination Mon 5/7/01 Fri 7/27/01 ~ Task 4, Paving Layouts and Profiles Thu 4/19/01 Mon 6/3/02 Task 5, Bridge Layouts and Design Mort 7/2/01 Mon 6/3/02 ~ ..... ' Task 6, Retaining Wall Layouts and Designs Mort 7/2/01 Mon 6/3/02 ~ '. Task 7, Drainage Design Mon 7/2/01 Mort 6/3/02 ~ ' ' , . Task 8, Signing and Pavement Marking Design Tue 1/29/02 Tue 6/4/02 Task 9, Traffic Control Plan Tue 6/19/01 Mon 6/3/02 ~ . - - Task 10, SW3P Design Wed 4/3/02 Mon 6/3/02 : Task 11, Specifications and Estimates Tue 4/23/02 Mon 6/3/02 Task 12, 30% Review Fri 9/14/01 Thu 10/25/01 Task 13, 65% Review Tue 1/1/02 Mon 1/28/02 Task 14, 950/0 Review Mon 3/25/02 Fri 4/19/02 Task 15, 100% Review Wed 6/5/02 Tue 6/25/02 Task 16, Final Revisions PS&E Wed 6/26/02 Fri 7/12/02 Task 17, Plans to Austin Mort 7/15/02 Fri 11/1/02 Task 18, Letting Mon 11/4/02 Tue 11/12/02 Project: Task ~ Milestone ~, Rolled Up Task ~ Rolled Up Progress Date: Mon 10/22/01 Progress Summary ~ Rolled Up Milestone ~) Page 1 Decisions Pending from TxDOT Interchange · Review of 30% submittal turned in 9/17/01 · Review of TCP concept, approval of overall concept · Environmental issues, if any, for two acquisition parcels · Dart Rail vertical clearance · Confirmation of super elevation transition method · Approval of 13I 35E shoulder widths and lane tapers · Frontage road pavement width · Valley storage compensation location, frontage road fills - October 1, 2001 SH 121 Section # Interchange at 35E % Overall P.S.&E completion: 10% From 2209+38.11 Latest Estimated Construction Cost: $ 53,600,000 To 2245+71.65 30/35% P.S.&E. delivery date for review: 9/17/01' CSJ: 3547-01-008 60/65% P.S.&E. delivery date forreview: 12/3/01 County: Denton 90/95% P,S.&E. delivery date for review: 4/1/02 Consultant: Halff Final P.S.&E. Package delivery date: 7/8/02 * Actual Task/Element % Outstanding issue~ includifig O~i~i ROWi Utiiiii~i X~r~eh~ ~te. complete Paving Plans 30 Drainage Plans 35 Bridge/Retaining Wall Layouts 35 Traffic Control Plans 20 TxDOT review of TCP concept pending ROW Parcels (separate 95 Submitted to ROW section for review contract) Illumination 0 WLA developing concept layout for high mast 10/15 Signing and 25 pavement marking Removals 5 SW3P 5 Hydraulic Report 75 Addressing preliminary comments from TxDOT received 9/26 Specifications 0 and Estimate _ Utility Mapping 30% Ibarra working on this Wendy Lopez & Associates, :Inc. Progress Report -- Wendy Lopez & Associates, :Inc. State Highway 12:1 / IH 35E :Interchange PROGRESS REPORT As of: September :14, 200:1 WLA No: 21054.00 This report is a summary of the services that Wendy Lopez & Associates, Inc. (WLA) has completed for the period of September 1, 2001 to $eptember 14, 2001: T,a~¢~¢ C~,wpt ,~T~r~ During the this billing cycle we have provided the following field work: 1. Completion of the field ties and mapping for the utilities and bore-holes. 2. Preliminary 30% Drainage design. 3. Preliminary 30% Illumination design. 4. Preliminary 30% bridge design. If you have any questions please call. Thank you, RaviX~acha, (214) 741-7777 rmacha~wendylopez.com wwxv.wendvlopez.com Wendy Lopez & Associates~ Inc. Progress Report - Wendy Lopez & Associates, :[nc. State Highway 12:1. / :[H 35E :Interchange PROGRESS REPORT As of: August :1.8, 2001 WLA No: 2:[054.00 This report is a summary of the services that Wendy Lopez & Associates, inc. (WLA) has completed for the period of August 18, 2001 to August 31, 2001: T,a_~g~; COMPI_FTFD During the this billing cycle we have provided the following field work: 1. Completed field ties to the high priority items and continued preparation of the base map. 2. Preliminary drainage design. Sheet setup and design 3. Illumination design -- 4. Preliminary bridge design If you have any questions please call. Thank you, (214) 741-7777 rmacha~wendylopez.com www.wendylopez.com Wend¥ Lopez & Associates, Inc. _ Progress Report Wend¥ Lopez & Associates~ Inc. State Highway :[21 ! tH 35E Interchange PROGRESS REPORT As of.' August :L7, 2001 WLA No: 21054.00 This report is a summary of the services that Wendy Lopez & Associates, [nc. (WLA) has completed for the period of July 14, 2001 to August 17, 2001: During the this billing cycle we have provided the following field work: 1. We completed field ties to the high priority items and continued preparation of the base map. 2. Drainage design 3. Bridge design - 4. Illumination design If you have any questions please call. Thank you, (214) 741-7777 rmacha~wendylopez.corn www.wendylopez.com Wendy Lopez & Associates, Inc. Progress Report - Wendy Lopez & Associates~ Inc, State Highway :12:1 ! IH 35E Interchange PROGRESS REPORT As of: July :13, 200:1 WLA No: 2:1054.00 This report is a summary of the services that Wendy Lopez & Associates, Inc. (WLA) has completed for the period of June 16, 2001 to July 13, 2001' During the this billing cycle we have provided the following field work: 1. Shot cross sections on N. bound bridge and exit ramp. 2. Tarversed to railroad tracks & tied monuments. 3. Ran hard elevations on new traverse points. 4. Cross sections and topo on railroad. - 5. Located ROW monuments along 1-35. 6. Set elevations on bridge connectors. 7. Closed traverse from railroad. 8. Verified elevations on Edwards & Kelsey BM's 9. Shot additional topo and cross sections on railroad. 10. Located and tied 30" water line. 11. Collected detail shots on bridge connectors and stub outs. 12. Tied additional ROW monuments on 1-35. 13. Topo on priority bridges and utilities. If ~'ou have any questions please call. Thank you, (214) 741-7777 rmacha~wendylopez.com www.wendylopez, com \1~('It1'1'I!(i'1'~4 I-iX(;I~I!I!R~ I'I_.\XNI'I~-, STATE HWY 121 INTERCHANGE AT IH 35E Traffic Control Plan Progress Report Month Ending September 28, 2001 This report is a summary of the services that HNTB Corporation has completed for the period of August 24, 2001 to September 28, 2001. Traffic Control Plans Refined the preliminary traffic control concept and narrative for the SH 121 Interchange at IH 35E. Prepared the TCP Summaries, General Notes, Project Layouts, Typical Sections, Plans, Detour Profile, Construction Signing Details, Bridge Demolition Sequence, and Detour Route Sheets. Submitted 30% Traffic Control Plans to Halff to include in the plan set for TxDOT's review. Prepared by: Stephanie Halliday [~~~~ AR(TI tlTE(JTS ENGINEERS PLANNERS ;'"~"-,"~,~' 752'J0 4~81 (9,2) 661 5626 STATE HWY 121 INTERCHANGE AT IH 35E Traffic Control Plan Progress Repo~ Month Ending August 24, 2001 This report is a summary of the services that HNTB Corporation has completed for the period of July 28, 2001 to August 24, 2001. Traffic Control Plans Refined the preliminary traffic control concept and narrative for the SH 121 Interchange at IH 35E. Determined and documented the detour routes that are needed during overhead operations. Submitted color roll plots of the preliminary traffic control concept for TxDOT's review. Prepared by: Stephanie Halliday The HNTB Companies OFFICES: ,ALEXANDRIA. VA: ATLAN1A GA: AUSTIN. 1X: BATON ROUGE. I.A: BOSTON. MA CHAI~i. ESTON SC CHARLESTON. AVV: CHICAGO. IL: CLEVELAND OH: COLUMBUS. OH: DALLAS TX DENVER CO; DETROIT MI: ELKINS \VV FAIRFIELD NI FT WORTH. nX: HARTFORD Cn IIOUS'ION TX: INDIANAPOLIS IN: IRVINE. CA: KANSAS Clg%~ MO: KNOX%ILLE. TN LANSING MI: LOS ANGELES. CA: LOUISVILLE. KY MANI'EO NC MIAMI FL; MIL\X'AUKEE WI: MINNEAPOLIS, MN NASHVILLE. TN: NEW YORK. Nh; OAKLAND CA: OKLAHOMA CI'15'. OK ©RLXNDO. ti. OVERLY, ND PARK. KS: PLYMOI qH MEEI'ING, PA: POll'I'L~,ND >,IE RAL[IGH NC SAI.1 lAKE CIIY, UT SAN ANTONIO TX; SAN BERNARD[NO, CA; SEATTLE. \\A [~~~~ AP, CIdlTECTS ENGINEERS PI~ANNEP, S STATE HWY 121 INTERCHANGE AT IH 35E Traffic Control Plan Progress Report Month Ending July 27, 2001 This report is a summary of the services that HNTB Corporation has completed for the period of June 5, 2001 to July 27, 2001: Traffic Control Plans Project setup, data collection. Developed preliminary traffic control concept for the SH 121 Interchange at IH 35E. Designed the horizontal and vertical alignments of temporary ramp NB IH 35E to 121. Created traffic control typical sections. Drafted bridge typical sections from as- built plans. Determined limits of bridge demolition for each step. Created Traffic Control Plan Layout Sheets, including a narrative of the concept. Prepared by: Stephanie Halliday The HNTB Companies OFFICES ALEXANDRIA. VA; AT1.ANqA GA: a. USTIN TX; BATON ROI!GE, iA: BOSTON MA: CHARLESTON SC CIRa. I[IESTON. \'~W: CHICAGO. IL: CLFVELAND. OH: COLUMBUS. OH: I.,tN~,ING MI LOS ~,N(;ELES CA; L(iVISVILLE. KY: MAN'lEO. NC: MIAMI FL; MILXXAI'KEE \Xh MINNEAPOLIS MN NASItX, ILLE 3N: NEW '(ORK NY; OAKLAND CA: OKEAH©MA CFIW OK: ORIANDO. FI. ¢)\ERL'~ND PARK KS: PL'~M©UI?t MEETING PA P©RTLAND ME: RALEIGH N(: bALl LAKE ([']Y. UI' SAN AXTONIO. 'FX: SAN }tERNARDINO CA: SEATTLE. ST LOUIS \10 ]AMI'A, FI: TOLEDO. OH: TUINA. OK: WICHIIA. KS ~ IBARRA ~ CONSULTING ~ ENGINEERS, INC. PROGRESS REPORT 135 CONNECTOR September 2001 TASKS COMPLETED: 1. Progress Meeting with Halff and Surveying Company. 2. Contacted GTE for clarification on survey shot showing facilities in areas were IBARRA was informed by GTE they had no facilities. 3. Called Field Engineer for MCI to request existing utility drawings. 4. Sent letter to MCI Investigation Department requesting As-built drawings. 5. Meet with utility representatives on the field. 6. Updated telephone log. 7. Visited site Prepared by: Raquel Ibarra, P.E. 3131 Turtle Creek BIvd., Suite1151 Dallas Texas 75219, Tele. 2142191030 Fax 2142191035 lo fl Sep-2.5-01' 05: 22P IBARRA CONS ENG INC P_ 03 ~ I WARRA I~ ~ CONSULTING SH 121 Ir ~ ENGINEGRS, INC. EXISTING UTILITY INFORMATION Project Name SH 121 BYPASS Project Manager R. Ibarra P.E. Project No. 00-150-02 Date Prepared ?ebruarv 11. 2001 Date Revised September 25, 2001 COMPANY CONTACT DEPT_ PHONE No. City of Lewis.v[l!e Chad Ignagni En~ineerin~l 972 219 3490 City of Lewisville Darrel Jones Field 972 219 3512 City of Coppell Mike Martin ~Engineering 972 304 3679 City of Coppell David Stone Field 972 320 6100 ATT Jack Rotcher Field 2t4 906 9275 Co-Serve Elec, Co. Richard Langford Field .. 214 728 6153 Co-Serve. Elec, Co. Michel Lauer En~ineerin~ 800 274 4014 GTEJerizon Rez Samari Engineering 972 221 5661 Verizon Chris Field 800 367 2a31 LS.G Pipeline James_Rdc~z. Field 214 869 3702 MCI/World Corn Dean Jones Field 972 670 0332 MCINVorld Corn He.at.h..S. harp En(~ineering 972 656 5785 Paragon Bill Morgan Engineering 972 501 7013 _ SWBT Brant Gilbert Field 214 502 4786 TxDOT Chris Behnke iEngineering 940 387 1414 TNP Gary Finley En~lineerin~l .. 972 571 2880 TNP Ray Chane¥ Field .. 972 317 5541 TNP Trent Youncj Field 972 317 5541 Williams Communications Randy Smith Enc~ineerinc~ 918 5_47 7095 iWilliams Communications Ivan ............. Richerrt contact for Util. Exposure 817 477 1645 ~Williams Communications Chris Heredia Field 214 755 6635 Digg Tess Locate 800 344 8377 09/25/01 TUE 18:39 [TX/RX NO 9617] ~, ~ CONSULTING ~' ~ ENGINEERS, INC. EXISTING UTILITY INFORMATION Project Name SH 121 BYPASS Proiect Manager R. tbarra P.E. Project No. 00-150-02 Date Prepared February 11,2001 Date Revised Septembed 25, 2001 .... PHONl.. tJ~N COMPANY CONTACT DEPT. No. OBTAINED Ioity of Lewisvil[e Chad Icjpagni Enc, lineerin~ 972 ,2! 9 3490 P/P paving, storm drair~ City of Lewisvilfe Darrel Jones Field 972 219 3512 Plan for water, SS, SD City of Coppell Mike Martin En~ineerinc~. 972 304 3679 P/P paving, storm drain C~ of Coppell David Stone Field 972 320 6109 Plan for water, SS ATT Jack Rotcher Field 214 906 9275 Plan (arial w/dimensions) Co-Serve Etec, Co. Richard Lan~jfor( Field 214 728 6153 :)lan Co-Serve Elec. Co. Michet Lauer Engineering] 800 274 4014 ~lan . GTENerizon Rez Samari En~ineerin~ 972 221 5661 Verizon Chris Field 800 367 2431 PIN 3159 LSG Pipeline James Rd(Jz. Field 214 869 3703 3lan MClNVorld Corn Dean Jones Reid 972 670 0332 not in area MCi/World Corn Heath Sharp En~ineerin~j 972 656 5785 not in area Paragon Bilt Morgan En~ineerin~. 972 50~ 7013 ~lan Paragon Roy Alonso Field 469 371 2592 :tan SWBT Brent Gilbert Field 214 502 4786 None available (inside GTE) TxDOT Chris Behnke En~lineerin~ 940 387 1414 P/P pavinc~, storm drain TNP Gary Finley En~i.neerin~ 972 571 2880 TNP Ray Chane¥ Field 972 317 5541 ~lan '' Williams Communications Randy Smith Engineerin,cl 918 547.7095 ~lan Williams Communications Ivan Richerrt contact forUti 817 477 1645 plan Williams Communications Chris Heredia Field 214 755 6635 ~lan Digg Tess Locate 800 344 8377 NA IIARRA ~oas~ltincJ E~jieee¢~. lac, ~: Turtle Gr~ek Blvd. Suite z~ DaIl,~s, Texas 7~2~9 Teb ~z4 ~9 ~o3o Fax- 2z4 1ofl ~. ~ IBARRA · , ~ CONSULTING · ~ ENGINEERS, INC. PROGRESS REPORT 135 CONNECTOR JULY 2001 TASKS COMPLETED: 1. Progress Meeting with Halff and Surveying Company. 2. Meet with Field Engineer for MCI to verify are were their facilities needed to be located. 3. Meet with utility representatives on the field. 4. Updated telephone log. 5. Visited site Prepared by: Raquel Ibarra, P.E. 3131 Turtle Creel~ Blvd. Suite 1151 Dallas Texas 75219 Tele. 214 219 1030 Fax 214 219 1035 1 ofl ~ ~ ~ARRA ~- ~ bNSULTING SH 1, ND 135 1 ~" ~ ENGINEERS, INC, CONNECTOR UTILITY TELEPHONE LOG Project Name SH 121 and 135 connector Project Manager R. Ibarra P.E. Project No. 00-150-02 Date Prepared May 9, 2001 Date Revised July 31 2001 CALL DATE TIME MADE RE'VED COMPANY CONTACT PHONE SUBJECT No. CALL CALL No. 1 5/8/01 11:50 AM X TxDOT Keith Neighbors 940 387 1414 Left message in regards to mowing schedule for Spur 556 2 5/8/01 1:30 PM X TxDOT Keith Neighbors 940 387 1414 Return our call. 3 5/8/01 3:22 PM X TxDOT Keith Nei~lhbors 940 387 1414 called back Left message in voice mail 4 5/8/01 4:10 PM X Dig Tess David 800 344 8377 Locate Order No. 011283410 for 135 connector 5 5/8/01 4:15 PM X TxDOT Keith Neighbors 940 387 1414 They will mow the area during the 16, 17 of May Let him know the mowing schedule and that we have one wk to get locate and survey before mowing. Decided to 6 5/8/01 4:45 AM X Halff Romo 214 346 6200 located after mowing. Left message requesting date when mowing will be 7 5/8/01 4:25 PM X TxDOT Keith Neighbors 940 387 1414 completed Called for clarifications to Spur 553 Order added Mapsco No. She canceled the previous order No. 011283447 and issued No. 011291773 for Denton Co. and 011291793 for 8 5/9/01 11:00 AM X ~DIG TESS Sarah 800 344 8377 Dallas Co. Called for clarifications to Connector Order added Mapsco No. She canceled the previous order No.o11283399 and 9 5/9/01 11:45 AM X DIG TESS Sarah 800 344 8377 issued No. 011291909 for Denton Co. 10 5/9/01 11:45 AM X Williams Comm. Chris 214 755 6735 Called to verify DIG TESS order. Let us know they will be finish mowing first wk of June. East 11 5/9/01 2:00 PM X TxDOT Keith Neighbors 972 387 1414 of 35 call Tim Pasifica 972 235 3314 12 5/9/01 2:05 PM X TxDOT Tim Pasifica 972 235 3314 They will finish mowing the Spur east of 135 May 17 or 16. Ray Chaney no longer w/TNP. Talked w/James Sexton. Informed him about meeting. Someone will be there from 13 5/9/01 2:10 PM X TNP Ray Chaney 972 317 5541 TNP Informed of meeting. He does not have any thing in new 14 5/9/01 2:15 PM X ATT Jack Rotcher 214 906 9275 area need to call Jim Whiteside 214 725 6602 IBI~RRN Consulting Engineers, Inc, Turtle Creek Blvd. Suite ~1.5I Dallas, Texas 752~9 Tele 2x4 21'9 Io3o lax 2t4 2x9 ~o35 I of 8 ~B~,~, ...,i[.iRRA SH 1: ~D 135 i ~- ~ CONSULTING CONN,-CTOR ~' =~ ENGINEERS, INC. UTILITY TELEPHONE LOG Project Name SH 121 and 135 connector Project Manager R. Ibarra P.E. Project No. 00-150-02 Date Prepared May 9, 2001 Date Revised July 31 2001 CALL DATE TIME MADE RE'VED COMPANY CONTACT PHONE SUBJECT No. CALL CALL No. He does not believe ATT has something in the area they cross 135 at Groundrove (FM3040) to RR and follow RR 15 5/9/01 2:18 PM X ATT Jim Whiteside 214 725 6602 north. However he will be at meeting 16 5/9/01 2:20 AM X MCI/World Com Dean Jones 972 670 0332 He will be attending the meeting on Friday They are clear Nothing along 35 nor along Spur 553 after RR. Review dgn Tom Grier City of Carrollton P.O. 17 5/9/01 2:23 AM X City of Carrollton Tom G rier 972 466 3200 Box 110535 Carrollton TX 75011-0535 Called to provide info on new order and meeting on Friday 11,2001. Can not attend mail to Chris Heredia 18 5/9/01 2:25 PM X Williams Comm. Chris 214 755 6735 1500 Sylvan Dr. No. 135 Hursrt, Texas 76053 19 5/9/01 2:30 PM X City of Lewisville Rosanna 972 219 3512 Left message on Darrell Jones voice mail He does not have anything in new site. Irene takes care of 20 5/9/01 2:35 PM X SWBT Brent Gilbert 214 502 4766 that area. Irene She locates for SWBT and ATT they no not have any thing 21 5/9/01 2:40 PM X SWBT Irene 214 729 8160 in the new area (company; SM&P) 22 5/9/01 2:45 PM X GTE Mike Fowler 972 434 2453 Left him a message about new area Called to find out who to contact about attendance to the Friday meeting. They do not flag is an outside Co. will flag 23 5/9/01 2:55 PM X GTE Ron Hilton 972 434 0622 from Dig Tess order 24 5/9/01 3:20 PM X LSG James Rd~z. 214 869 3703 Informed of meeting. He will be there Called to inform about new locate and meeting. He no 25 5/9/01 3:35 PM X Paragon Roy Alonso 469 371 2592 longer does locates. ATT is handling flagging now. 26 5/9/01 3:45 PM X CoServ R. Lan~ford 214 728 6153 He will be attending the meeting on Friday 27 5/9/01 3:50 PM X iCity of Dallas 28 5/22/01 4:45 PM X MCIANorld Com Dean Jones 972 670 0332 he will need to get their own permission to enter RR ROW IBNRRN Consulting Engineers, Inc. Turtle Creek Blvd. Suite ~5~ Dallas, Texas 752~9 Tele 2~4 219 ~o3o Fax 2~4 279 m35 2of8 ~.JNSULTING CONhr-CTOR ~' ~ ENGINEERS, INC. UTILITY TELEPHONE LOG Project Name SH 121 and 135 connector Project Manager R. lbarra P.E. Project No. 00-150-02 Date Prepared May 9, 2001 Date Revised July 31 2001 CALL DATE TIME MADE RE'VED COMPANY CONTACT PHONE SUBJECT No. CALL CALL No. 29 6/26/01 9:43 AM X TNP 972 434 0622 He left a message. asked if they have facilities in the proj. area. He said they 30 6/26/01 9:45 X TNP 972 434 0622 do not have anything along 135 nor along the Spur. Not there spoke with Ron Hilton. Ron asked me to go to 31 6/26/01 9:20 AM X Verizon M. Fowler 972 434 0622 their office and see Rez. 32 6/26/01 9:25 AM X Verizon Rez Samari 972 434 0622 I left a message. They only have facilities along the RR track. On the east side of the track. Approximately 4 to 5 feet from track. He 33 6/26/01 4:30 PM X MCI World Comm. Don will call back to let me know if they can locate. They do not expose their facilities. They have facilities only along spur form 135 to Lake Vista. The rest of their system runs along 135 on the west side he will locate and let me 34 6/27/01 11:57 AM X Williams Comm. Chris 214 755 6635 know when he is finished. Let him know Mr. Hilton asked me to get with him to get 35 6/27/01 2:00 PM X Verizon Rez Samari 972 221 5661 drawings. I will see him 6/28/01 around 10:30 a.m. call me to let me know person over are is on vacation. He 36 7/5/01 3:00 PM X MCI World Comm. Don has tried to locate but he has been to busy. He will get dgns 37 7/5/01 3:30 PM X MCI World Comm. Don He call back he can met on site Monday at 1:00 p 38 7/9/01 11:40 AM X TxU Larry Redrick 940 497 5743 got voice mail, transfer to "0" no voice mail on system. call for Don to verify app. Dean ans. I asked for person responsible for new area. He will call me back. He needs 39 7/9/01 10:00 AM X MCI Don 972 670 0332 to find out. 40 7/9/01 10:15 AM X MCI Don 214 728 4249 call Don at other #. He is not at work. 41 7/9/01 11:45 AM X Williams Comm. George Otty 918 573 0379 Voice mail provided new # 918 547 0379 They are also ATT Broad band. They do not have anything after McArthur along the Spur and they do not have anything 42 7/9/01 11:50 AM X Paragon Bill Morgan 972 501 7102 along I 35. 18NRRN Consulting Engineers, Inc. 3z3z Turtle Creeh Blvd. Suite ~5~ Dallas, Texas 752~9 Tele 2~4 ~9 ~o3o Fax z~4 ~9 zo3~; 3of8 ~ SH I ~D 135 ~ CONNECTOR UTILITY TELEPHONE LOG ~ ~ II~ARRFI ~" ~ ENGINEERS, INC. Project Name SH 121 and 135 connector Project Manager R. Ibarra P.E. Project No. 00-150-02 Date Prepared May 9, 2001 Date Revised July 31 2001 CALL DATE TIME MADE RE'VED COMPANY CONTACT PHONE SUBJECT No. CALL CALL No. 43 7/9/01 12:03 PM X ,Williams Comm. George Otty 918 547 0379 Left message in voice mail. 44 7/9/01 12:05 PM X ICoServ iMichael Laver 800 274 4014 Left message in voice mail. Gave Romo an update of my site meeting with Don of ATT, let him know that the MY under the bridge is stamp City of Lewisville. Also updated him about SWBC. Romo to locate 45 7/9/01 2:00 PM X Halff M. Romanaski 214 346 6200 SWBC on our dgn. as per SWBC const. Dgn. They do have facilities in the new area. They are on the 46 7/10/01 11:00 PM X :CoServ i Michael Laver 800 274 4014 West side of 135. I asked for status on locates along 135. He will get back with me in the morning he needs to meet w/another Iocator 47 7/26/01 3:16 PM X Richard CoServe 214 728 6153 which works the 135 area. IBNRRN Oonsulting Engineers, Inc. Turtle Creek Blvd. Suite ~xS~ Dallas, Texas 75219 Tele 214 2z9 m3o Fax 214 219 ~o3~i 4 of 8 TERRA-MAR Consulting Engineers · Geotechnical · Environmental · Construction Materials Testing DALLAS ° FORT WORTH ° HOUSTON ' AUSTIN ' LONGVIEW October 8, 2001 Mr. Mike Romanowski, P.E. Halff Associates, Inc. 8616 Northwest Plaza Drive Tel. 214-346-6270 Dallas, Texas 75225 Fax 214-739-7086 Re: Project Status SH 121 By-Pass Interchange at IH 35E Dallas-Denton County, Texas TMI Report No. DE01-064-L05 -- Dear Mr. Romanowski: We have completed all of the originally planned 52 borings for this project. We are in the process of drilling the additional bridge borings and the retaining wall borings west of Lake Vista Drive. Laboratory testing is complete on samples obtained from most of the completed borings. An invoice for the work completed to-date is enclosed. A technical guideline including geotechnical recommendations for design and construction of drilled shaft foundations for the ramp connecting the northbound IH 35E to the eastbound SH 121 will be submitted on October 15, 2001. Preliminary geotechnical recommendations for the remaining connector bddges and the main-lane bridges will be submitted later this month. We appreciate the opportunity to be of assistance on this project. Please do not hesitate to contact us if you have any questions or need further assistance. Sincerely, TERRA-MAR, INC. Project Manager 11050 Ables Lane, Dallas, Texas 75229 Phone: 972-488-8800 Fax: 972-488-8080 TERRA-MAR Consulting Engineers · Geotechnical · Environmental · Construction Materials Testing DALLAS · FORT WORTH · HOUSTON · AUSTIN · LONGVIEW August 23, 2001 Mr. Mike Romanowski, P.E. Halff Associates, Inc. 8616 Northwest Plaza Drive Tel. 214-346-6270 Dallas, Texas 75225 Fax 214-739-7086 Re: Project Status SH 121 By-Pass Interchange at IH 35E Dallas-Denton County, Texas TMI Report No. DE01-064-L04 Dear Mr. Romanowski: We have completed 38 of the planned 52 borings. Laboratory testing on samples obtained from these borings is in progress. An invoice for the work completed to-date is enclosed. We appreciate the opportunity to be of assistance on this project. Please do not hesitate to contact us if you have any questions or need fudher assistance. Sincerely, TERRA-MAR, INC. Na~r"H. ~yed, P.E. Project Manager 11050 Ables Lane, Dallas, Texas 75229 Phone: 972-488-8800 Fax: 972-488-8080 TERRA-MAR Consulting Engineers · Geotechnical · Environmental · Construction Materials Testing DALLAS · FORT WORTH · HOUSTON · AUSTIN · LON6VlEW July 25, 2001 Mr. Mike Romanowski, P.E. Halff Associates, Inc. 8616 Northwest Plaza Drive Tel. 214-346-6270 Dallas, Texas 75225 Fax 214-739-7086 Re: Project Status SH 121 By-Pass Interchange at IH 35E Dallas-Denton County, Texas TMI Report No. DE01-064-L03 ----- Dear Mr. Romanowski: We have staked borings and cleared buried utilities at the boring locations for the project referenced above. We have completed 25 of the planned 52 borings. Laboratory testing on samples obtained from these borings is in progress. An invoice for the work completed to- date is enclosed. We appreciate the opportunity to be of assistance on this project. Please do not hesitate to contact us if you have any questions or need fudher assistance. Sincerely, TERRA-MAR, INC. Project Manager 11050 Ables Lane, Dallas, Texas 75229 Phone: 972-488-8800 Fax: 972-488-8080