Loading...
ST0001-CS011210 (2)12/18/2803 13:49 8176497645 SCHRICKEL ROLLINS PAGE 82 Schrickel, Rollins and Associates, Inc. Consultants in Landscape Architecture a Engineering · Planning Victor w, Baxter, Kent E. Besley, ASL~ Joseph E. Bradley, Pi[ Terry T. Cheek, ASIA Tern/E. Cullender Dino J. Ferralli, P£ Daniel 8. Hartman, PE Delbert W. Hirst, ^SIA Sanford P, LaHue, Jr., Hershel R. Lindl¥, APA David K. McCask)ll, ASIA Robert M, Otey, PE ^Ibert w. Rollins, PE Cl~ristian Schnitser, PE Gene $chrickel, FASLA December 10, 2001 Suzanne C. Sweek, ASIA Ms. Suzan Taylor City of Coppell Engineering Dept. P.O. Box 476 Coppell, Texas 75019 RE: Creekview Drive and Freeport Parkway SRA has reviewed the Contractors price submittal for the removal and relocation of 800 LF of pipe fence along State Road. The costs shown for the pipe fence construction ($15/LF) appears to be in line with current market prices If you should have any questions regarding this matter please do not hesitate to give me a call. Yours truly, 5CHRICKEL, ROLLINS AND ASSOCIATES, INC. Chris 5chnitger, P.E. CS/cs/,,~6 H:~Job\412 6\Corresp\Letter\Taylor. 12.10.01 .doc 161 Corporate O~ive West · Suite ;ZOO · ^rlinlFon, Texas 76006 · (817) 649-3216/Metro {817) 640~212,.TAX (8,17) 649,7645 CITY OF COPPELL CREEKVIEW DRIVE & FREEPORT PARKWAY PROJECT ST 00.01 CHANGE ORDER NO. December 4, 200t ITEM NO. DESCRIPTION AMOUNT DETAIL 1 Tree Removal l'rom Pond area $ 5,000.00 2 Dirt - Compact and. Haul into Stockpond $ 2,656.80 Compactor (+) fuel (+~ 1man x 3 days labor 3 Sun~e¥or $ 720.00 4 New Fence (8001f~ $1~ OhO O0 5 Paintin~ of Fence - (not included in above~ $ 2,340.00 20 Gal Paint (+'I 2men x 5days labor Subtotal $ 22,7?6.80 OH&P (1 !. $ 3,407.5-" Grand Total ils ' 12/18/2881 13:49 8176497645 SCHRICKEL ROLLINS PAGE 84 D~c 04 O1 0~:39p Infrastructure Services 992-3D3-8064 p.3 inc. December 4, 2001 Schrickel, Rollins and Associates, Inc. 1161 Corporate Drive West, Ste 200 Arlington, Texas 76006 Attn.: Chris Schnkger, P.E. RE: Dirt Quantities Dear Mr. $ctmitger, This letter is being sent to document a variation ia quantities for the UNCLASSIFIED ROADWAY EXCAVATION. Based on the control point given to ISi by your surveyors, a total of 12,500 cubic yards &dirt will need to be excavated. This is approximately 6,000 cubic yards in additional excavation. Since we me already sending you pricing on the new .fencing, we thought it best to get all changes in one change order in lieu of having to process two. Ihank you for your help in regards to the above, and please do not hesitate to contact In.fi'astrucmre Services, Inc. at (972) 240-8064 if further information should be required. Sincerely, Philip Bennett F/lc: Corr. To (14510007)