ST9601-CN 990126 AGENDA REQUEST I, uRM \ CITY COUNCIL MEETING: January 26, ~8 ITEM # ITEM CAPTION: Consider approval of Change Order #1 for the relocation of an existing water line on the Wrangler Drive Reconstruction Project #ST 96-01 in the amount of $46,794.00 to Tiseo Paving Company, Inc.; and authorizing the Mayor to SUBMITTED BY: Michael A. Martin, P.E. ¢; P,~ ~ ' TITLE: Assistant City Engineer STAFF RECOMMENDS: APPROVAL STAFF COMMENTS: During the construction of the first phase of Wrangler Drive it became apparent that a portion of an existing 12" water line on the south side of Wrangler Drive was located too close to the concrete paving with less than minimal coverage. Approximately 954 linear feet of the 12" water line, which staff is recommending be relocated, crosses the front of the Coppell Middle School West property. With the relocation, an additional water valve will be installed to allow the City in the future to take down a portion of the water line. This proposed water line relocation would require work beyond the original scope of work, resulting in the adjustments contained in Change Order #1. Staff recommends approval of Change Order #1 in the amount of $46,794.00 and will be available to answer any questions at the Council meeting. BUDGET AMT. $ AMT. EST. $ +/- BUD:$ FINANCIAL COMMENTS: Funds for this change order are available in the Water/Sewer CIP Accounts. DIR. INITIALS: ~ FIN. REVIEW: ~ CITY MANAGER REVIEW: \ Agenda Request Form - Revised 3/98 Document Name: #engl CHANGE ORDER NO: 1 DATE: January 14, 1999 PROJECT: Wrangler Drive Reconstruction (Project No. ST 96-01 ) OWNER: City of Coppell, Texas CONTRACTOR: Tiseo Paving Company, Inc. I. GENERAL: The following changes to the quantities of work shall be accomplished as stated and agreed to below. This work shall be furnished and completed in accordance with the applicable provisions of the original construction specifications and contract documents. None of these changes shall be considered as waiving or invalidating any conditions, requirements or provisions of the contract or bonds. II. DESCRIPTION OF CHANGE AND/OR EXTRA WORK: During the construction of Phase I of the project, the existing 12-inch water line along a portion of the project was discovered to be shallower than anticipated and in an undesirable location to facilitate proper maintenance once the new paving improvements were constructed. In order to insure the future integrity of this water main, it needs to be relocated and adjusted. The proposed water line relocation requires additional work beyond the original scope of work, resulting in the following adjustments to the contract (See also the attached Unit Price Schedule). Ill. ADJUSTMENTS IN CONTRACT PRICE: ORIGINAL CONTRACT AMOUNT $1,650,508.15 ADJUSTMENTS TO CONTRACT AMOUNT PER PREVIOUS CHANGE/EXTRA WORK ORDER $0.00 INCREASE PER THIS CHANGE ORDER $46,794.00 REVISED CONTRACT AMOUNT $1,697,302.15 IV ADJUSTMENTS IN CONTRACT TIME: ORIGINAL CONTRACT TIME 300 calendar days ADJUSTMENTS TO CONTRACT TIME PER PREVIOUS CHANGE/EXTRA WORK ORDER 0 calendar days INCREASE PER THIS CHANGE ORDER 0 calendar days REVISED CONTRACT TIME 300 calendar days MME ED R: AGREED BY CONTRACTOR: Tise Paving Company, Inc. A OVED rAC D OWNER: q:~pt~.~l 4~ol96164~cs~con®$%C01 .wp~ '- ~" UNIT PRICE SCHEDULE A .. WRANGLER DRIVE I ST 96-01 CHANGE ORDER No. 1 12-Inch Water Line Relocation Improvements Add the Following Quantities of Work to Existing Pay Items in the Original Contract: Item Quantity Unit Description and Price in Unit Total No. Words Price Price 1 925 LF 12" PVC Water Pipe (DR 14), Complete in Place (i-35) Twenty-Seven Dollars and No Cents per Linear Foot $27.00 $24,975.00 2 20 LF 8" PVC Water Pipe (DR 14), Complete in Place (I-37) Thirty-One Dollars and Fifty Cents per Linear Foot $31.50 $630.00 3 10 LF 6" PVC Water Pipe (DR 14), Complete in Place (I-39) Twenty-Nine Dollars and No Cents per Linear Foot $29.00 $290.00 4 1.25 Ton Ductile Iron Fittings, Complete in Place (i-4o) F{fty-Tw o Hundred F{fty Do{{ars and No Cents per Ton $5,250.00 $6,562.50 5 2 Each 12" Gate Valve, Complete in Place (I-41) Sixteen Hundred Dollars and No Cents per Each $1,600.00 $3,200.00 6 I Each 8" Gate Valve, Complete in Place ({-42) Eleven Hundred Twenty-Five Dollars and No Cents per Each $1,125.00 $1,125.00 Wrangler Ddve / ST 96-01 CHANGE ORDER NO. 1 Page 2 of 3 "' UNIT PRICE SCHEDULE & WRANGLER DRIVE / ST 96-0's Item Quantity Unit Description and Price in . f Unit Total , Words Price Price No. ~ Each iRemove &Relocate Existing , Fire Hydrant Assembly, (11-63) : i Complete in Place , Nineteen Hundred ; !Dollars i i -: i !and No Cents $1,900.00 ! $3,800.00 8 4 ! Each Connect to Existing System, i Complete in Place (I-45) i ! ~ Eight Hundred ! i Ninety-Five Dollars . and No Cents : i per Each $895.00 ' $3,580.00 9 955 ~ LF Trench Safety for Water Line Installation, (I-46) ;Complete in Place ; One Dollars i . * ;and Ten Cents . per Linear Foot ! $1 10 $1,050.50 i ' 10 51 SY Remove Existing Concrete Driveways, (11-4) Complete in Place Four Dollars and No Cents per Square Yard , $4.00 $204.00 11 51 SY 6" Reinforced Concrete Driveway, (11-11) Complete in Place r Twenty-Seven Dollars~ and No Cents~= per Square Yard :~ $27.00 $1,377.00 TOTAL INCREASE PER CHANGE ORDER No. I $46,794.00 Wrangler Drive I ST 96-01 CHANGE ORDER NO. 1 Page 3 of 3 "" ,llb ""' q o t CATELLUS February 26, 1998 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell PO Box 478 Coppell, Texas 75019 RE: Dedication of Freeport Parkway and Wrangler Drive Dear Ken: Attached are executed Special Warranty Deeds covering the conveyance of Freeport Parkway and Wrangler Drive. Also, we have included an Exhibit "B" to the deeds relative to exceptions to title and have made reference to same in the body of the deeds. In reviewing the deeds, our attorney wanted to make it clear that in accepting the deeds, the city is taking over maintenance, etc. In lieu of changing the deeds he suggested we simply have a letter agreement for the City's signature when accepting the deeds. Accordingly, please also find enclosed two letter agreements, in duplicate, for the City's review and signature. If all is in order, please return one fully executed letter agreement for each conveyance. I would also appreciate a copy of the fully recorded deeds when available. I have received a letter from, presumably, your office requesting Catellus acknowledge the cost sharing arrangement between Catellus and PacTrust relative to the Wrangler Drive construction. Accordingly, please accept this letter as Catellus' agreement with the method of cost sharing calculation for the Wrangler Drive improvements. Catellus further understands that the estimated cost to Catellus of $224,582 is an estimate and is subject to adjustment depending on the outcome of the bidding process, but in no event will the prorata cost to Catellus exceed $260,000. I appreciate your help in getting the Freeport Parkway matter brought to a close and should you have any questions concerning the above, please do not hesitate to give me a call. SSit ~~ Director, Development CATELLUS DEVELOPMENT CORPORATION 4545 FULLER DRIVE, SUITE 100, IRVING, TEXAS 75038 (972) 719-6101 FAX (972) 719-6149