ST0001-CS011203 (2)CREEKVIEW DRIVE & FREEPORT PARKWAY ST 00-01 December 3, 2001 Site Meeting ~ 8:00 Larry Davis - Project Inspector, City of Coppell Dennis Hammock - General Superimendent - isi PROJECT STAKING Creekview Drive: 1. 9 1/2' offsets to b.o.c, along the north right-of-way boundary 2. 4' & 5' offsets to b. o. c. on east/west along south right-of-way boundary 3. No elevations or cuts staked at the intersection of Creekview Dive and Freeport Parkway 4. Contractor to have it staked today or tomorrow Freeport Parkway: 1. No right-of way staked 2. Contractor to have it staked today or tomorrow RELOCATION OF EXISTING STEEL & CABLE FENCE Fence along State Road and Ruby Road 1. Existing gate needs to be relocated to the east (along Ruby Road) +100 feet. 2. Contractor needs to call Brad Reid and meet with him on-site to determine location of the new fence 3. Normally set fence on right-of-way - up to Brad Reid EXISTING IRRIGATION ALONG FREEPORT Irrigation installed by Duke Weeks 1. Contractor to get Jeff Langston's telephone number to discuss relocation and lowering of irrigation parallel to Freeport parkway EXISTING UTILITIES 1. Walked entire project and Inspector identified water, sewer, underground electric, and overhead Verizon locations 2. Contractor to get in touch with TXU and Verizon and met with them to determine horizontal and vertical relocations 3. Contractor will try to set the meetings up for tomorrow GENERAL 1. Contractor to provide updated project schedule today 2. Contractor will provide cut sheets for excavation to the City of Coppell and to the Engineer (Schrickel Rollins & Assoc.)