Loading...
ST0004-CS01120412/05/01 10:36 CITY OF COPPELL --> 9"72 304 "70,41 N0.001. oo-O4 ~tO~ DEPARTMENT OF PUBLIC WORKS To: Larry Davis, Construction Inspector Engineering From: Larry Morton, Streets Division Public Works Date: December $, 2001 RE: Walk-thru Freeport Parkway Reconstruction 12/4/01 DRAINA.GF,_ 1. O.K. PAVING 1. Rout and seal all random cracks. 2. Clean and fill mud pocket holes with sealant, 3. Clean and f'dl joints at median at Gateway. 4. Take bags off speed limit signs. $. Clean and seal joints in curb. CITY OF COPP£L£ PUBLIC WOltl($ D£P/IRTMEIgT 12×05/01 10:36 CITY OF COPPELL ~ 9?2 304 7041 N0.001 FROM DEPARTMENT OF PUBLIC WORKS To: Larry Davis, Construction Inspector Engineering From: Danny Hightower, Utilities Division Public Works Date: December ~, 2001 RE: Walk-thru Freeport Parkway Reconstruction 12/4/01 1.Need pad at curb stop valve stake - all 5. 2. All irrigation DC's need plugs - all $. 3. All irrigation DC's to be tested after meters are installed. 4. No meter at this time - cannot check for leak. 5. Clean meter cans to bypass cutoff. 6. Need irrigation valve stack lid on 2"" meter from Bethel Rd. 7. Clean Fit valve stack so can get on valve at Minyard and mark curb in red. 8. Mark all MLV in blue on curb and paint lid~ on valve stacks blue. 9. Mark IRR on curb in blue at all meter cans. 10. Mark M~I in red on curb at all sewer manholes. 11. Clean manhole at Fritz of trash in bottom. 12. Irrigation cans at Gateway raise to curb height. 13. Storm drainage msmhole at Freeport and Southwestern southeast corner reset top. 14. Sewer manhole at RR regrout inside at top. Call 972-30~-3545 for Danny Hightower to check punch list. CITY OF COPPE£1. PI.I.~LIC ~FOitl~