Cotton Belt-PN211011RIGHT-OF-WAY USE PERMIT APPLICATION
Permit valid for 90 calendar days from date of approval
Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. or e-mail to engineer@coppelltx.gov (see button below)
Date of Submittal: Applicant’s Job # / Work Order #
PERMIT FEE:$100.00
(No charge to Utility Companies with approved Franchise/ROW Use Agreement)
Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider?
Utility Company Represented:
Oncor Electric Delivery Atmos Energy Verizon SBC/ AT&T
Time Warner Cable CoServ Electric/Gas Other
Estimated Start Date Estimated Completion Date*
* Completion requires submittal of Completion Verification Notice (see page 4)
Right-of-Way Use Permit Application Page 2 of 4
Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which
includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at
applicant's expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices.
Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage,
vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972-462-5155.
UTILITY RELOCATION CHECKLIST FOR WORK WITHIN
CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS
Listed below are minimum requirements for utility relocation projects:
1.A copy of the valid approved City of Coppell permit is required on the project at all times.
2.Notify adjacent property owners (commercial & residential) of project timeline; provide them with contact
names and phone numbers.
3.Proper erosion control measures must be taken.
4.Follow Texas MUTCD standards for work in traffic zones.
5.Sod is to be replaced when necessary.
6.Irrigation repairs must be performed in a timely manner.
7.Follow OSHA recommended trench safety at all times.
8.Repair existing utilities that are damaged, including but not limited to clean-outs, water valves, and SS
manholes.
9.Densities may be required in trench lines (ASTM).
10.Care and repair of street signage is the responsibility of the contractor.
11.No work is to be done in collector roadways before 9:00 a.m. or after 3:00 p.m.
12.Prior notice of work activity on weekends and holidays must be in writing.
13.Line locates must be performed in advance by contacting - 1 800 DIG TESS and/or the following:
CITY OF COPPELL UTILITIES DIVISION coppelltx.gov/utility-operations-division
972/ 462-5155
CITY OF COPPELL ENGINEERING DEPT.
972/ 304-3679
HOMEOWNER ASSOCIATIONS
972/ 304-3678 (Planning Department)
TIME WARNER CABLE FEDERAL EMERGENCY MGMT. ADMIN.
214/ 320-5455 (Mike Rasmussen)940/ 898-5138
AT&T LOCAL NETWORK TEXAS COMM. on ENVIRONMENTAL QUALITY
214/ 215-3031 (Rich Millenman)817/ 588-5800
COSERV Gas & Electric DENTON CO. LEVEE DISTRICT
940/ 321-7800 x 7624 (Greg Ward)214/ 352-5118 (Richard Hightower)
EXPLORER PIPELINE Atmos Energy
918/ 493-5100 (Patrick Nwakoby)972/360-4428 (Gary Dickinson)
ONCOR Electric Delivery
972/ 323-8917 (Larry Redick)
VERIZON COMMUNICATIONS 1 800 DIG TESS for line locates
972/ 318-5277 (344 - 8377)
14.Contaminants must be removed from work area daily and disposed of properly outside the City.
15.Streets, sidewalks and alleys must be kept clean of construction material and debris.
16.“Clean-up” requires returning work area to pre-project condition or better.
17.Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4)
Page 3 of 4
Page 4 of 4
UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT
COMPLETION VERIFICATION NOTICE
Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection
with Utility & Streets personnel to verify that your project has been completed to City of
Coppell specifications. Failure to schedule verification inspection may delay future projects.
Franchise Utility Name
Project Location / Applicant's Work Order # (if applicable)
Sub-contractor Company Name
24 hr.Contact Number
Date of Verification Appointment
Time of Verification Appointment
INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL
A copy of this completed notice can be provided to the address below
or e-mailed by using the button below:
City of Coppell Engineering Dept.
255 Parkway Blvd., Coppell TX 75019
Office: 972-304-3679 Fax: 972-304-3570
Follow-up needed? Follow-up scheduled for Yes No
and found to be acceptable / not acceptable because
of Streets Maintenance Division on
Lane Closure Request Form
For City permit reasons, please turn in request 3 weeks prior to implementation
(TxDOT ROW approval may take 4 to 7 weeks)
Date of request
10/01/2021
Contact Person / Phone
number
Luis Diaz / 469-289-7804
City where work will be
performed
Coppell
Location and cross street
Bridge 7, E Beltline Rd/ S Beltline Rd
Lanes to be closed (right, left,
full)
NB Right Lane
Implementation Date(s) and
Times (Start / End)
10/7/2021 to 10/12/2021 7:00 AM to 5:00 PM
Based on LTRA Availability (Subject to change)
Scope of Work
Potholing Utilities
Additional Information
Please attach a Google Earth photo with your work limits
Return completed request form to Eric Christman (MOT Manager)
echristman@walshgroup.com
(817) 939-8878
Type 1 Type 2 Type 3 ADA
Phase 1
Sheet 1
Hamilton Duffy, PC
Consulting
Tex Reg F-5260
85ft
Buffer120ft 245ft
Taper
320ft
Taper
170ft
Buffer240ft
400ft
415ft
Buffer
720ft
Taper
780ft
Taper
Arrow
Board
MB
Part A
50ft
Work
Zone
100ft
Work
Zone
150ft
Work
Zone
200ft
Work
Zone
250ft
Work
Zone
300ft
Work
Zone
350ft
Work
Zone
400ft
Work
Zone
450ft
Work
Zone
500ft
Work
Zone
1000ft
Work
Zone
1500ft
Work
Zone
RIGHT LANE
MUST EXIT
R3-33R
LEFT LANE
MUST EXIT
R3-33L
ONLYONLY
STOP
HERE ON
RED
ONLYONLY
ONLYONLYONLYONLYONLY
Navigator
ONLYONLY
ONLY
ONLYONLYONLYONLY
ONLYONLY
Navigator
Type 3 Barricade
Navigator
Type 3 Barricade
Type 1 Barricade
Navigators
Type 3 Barricade
2-Way Traffic
Vertical Panel
Type 3 Barricade
Barrels
Type 3 Barricade
Barrels
Type 3 Barricade
2-Way Traffic
Vertical Panel
Barrels
Type 3 Barricade
Type 1 Barricade
Navigator
Type 3 Barricade
Type 2 Barricade
Type 1 Barricade
Barrels
Type 3 Barricade
Type 2 Barricade
Type 1 Barricade
Navigator
Type 3 Barricade
Type 2 Barricade
Barrels
Type 3 Barricade
Type 2 Barricade
ONLY
ROAD CLOSED
TO
THRU TRAFFIC
TYPE III
R11-2
ROAD
CLOSED
ROAD CLOSED
TO
THRU TRAFFIC
ROAD
CLOSED
TYPE III
R11-2 / CW1-7
ROAD
CLOSED
DETOUR
TYPE III
R11-2 / M4-10R
ROAD
CLOSED
DETOUR
TYPE III
R11-2 / M4-10L
DETOUR
TYPE III
R11-4 / M4-10R
ROAD CLOSED
TO
THRU TRAFFIC
DETOUR
TYPE III
R11-4 / M4-10L
ROAD CLOSED
TO
THRU TRAFFIC
RAMP
CLOSED
ROAD
CLOSED
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
100ft
Taper
100ft
Buffer
90ft
Shifting
Taper 100ft
1000ft 1600ft
85ft
SIDEWALK
CLOSED
600ft
Taper
280ft
Buffer
180ft
Taper
540ft
Taper
660ft
Taper
160ft
320ft
120ft
Buffer
220ft
Buffer
335ft
Buffer 500ft
700ft485ft
Buffer
900ft
600ft
800ft 585ft
Buffer
840ft
Taper
900ft
Taper
720ft
Buffer
N
EW
S
xxft
Shoulder
Taper
xx
30 180 85 120
Speed Taper Buffer Sign
Spacing
35
40
45
50
245
320
540
600
120
170
220
280
160
240
320
400
55 660 335 500
60 720 415 600
65 780 485 700
70 840 585 800
75 900 720 900
Devices spaced on 35ft centers
Posted speed limit 45MPH
Devices spaced on 25ft centers
Posted speed limit 35MPH
Devices spaced on 30ft centers
Posted speed limit 40MP H
Devices spaced on 40ft centers
Posted speed limit 50MPH
Devices spaced on 20ft centers
Posted speed limit 30MPH
Devices spaced on 45ft centers
Posted speed limit 55MPH
Devices spaced on 50ft centers
Posted speed limit 60MPH
Devices spaced on 55ft centers
Posted speed limit 65MPH
Devices spaced on 60ft centers
Posted speed limit 70MPH
Devices spaced on 65ft centers
Posted speed limit 75MPH
Devices spaced on 70ft centers
Posted speed limit 80MPH
KEEP
RIGHT
RIGHT LANE
MUST
TURN RIGHT
R3-7R
NOTE: Changes requested by Contractor may not conform to TXDOT/MUTCD standards.
Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control.
LEFT LANE
MUST
TURN LEFT
R3-7L
SIDEWALK CLOSED
USE OTHER SIDE
1000ft 1/2 MILE 1 MILE
NOTE: Plan design based on engineered stamped plans provided by Contractor may not conform to TXDOT/MUTCD standards.
Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control.
Type 2 Barricade
Navigators
Type 3 Barricade
Water Barrier
Type 1 Barricade
Barrels
Type 3 Barricade
Water Barrier
Navigators
Type 3 Barricade
Flagger w/Cones
Barrels
Type 3 Barricade
Flagger w/Cones
NOTE: Plan requested by Contractor may not conform to TXDOT/MUTCD standards.
Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control.
ALLEY CLOSED
TO
THRU TRAFFIC
TYPE III
R11-2
ALLEY
CLOSED
Chris Schreiner
Eddie Harmon
Jason Garrett
Marie Rhom
Keith Hamilton
Lauren Simpson
Tony Troxclair
Lindsay Garrett
Mike Moreno
Lacey Green
Daniel Barron
Matt Sauer
Dustin Rawlings
Jeremiah Keys
ROAD CLOSED
TO
THRU TRAFFIC
Cole Benton
SIDEWALK CLOSED USE OTHER SIDE
TO BE PLACED AT
DO
NOT
PASS
DO
NOT
DRIVE
ON
SHOULDER
Michael Cooper
Kevin Omachel
Matt Smith
Devan Diviney
Barrels
SIDEWALK
CLOSED
Chris Blum
Special RulesPlano-Double-up Signs-Add General NotesDallas-Intersections Count As Buffer-No “End Road Work”Fort Worth-Arrow Board 40MPH+Richardson
-Sign Sequence (RWA, LCA, LEML/R)MatchlineStreet NameALL
TRAFFIC
MUST
EXIT
2600ft
PRELIMINARY
FOR REVIEW ONLY
PE NO. DATE
KEITH M. HAMILTON 87384 XX/XX/2021
Christian Lopez
xx
YOUR SPEED
XX
Radar
Trailer
MB
SZ
Q-Lynx
2L Rule-On freeways, FIRST buffer length shall be 2x the length of the Taper for
double lane closures.
“Diamond” rule for Crossovers
-On the diamonds made to push traffic back over from a 2-way application,
the spacing is to be a 1/2L taper length1/2L MatchlineSIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK
CLOSED
Rumble Strips
Crash Truck/TMA
Water Barrier
Concrete Barrier
***
***
ROADWORKAHEADCW20-1DCW20-5RRIGHTLANECLOSED CW20-5DLLEFTLANECLOSEDAHEAD RIGHTLANECLOSEDAHEADCW20-5DRTURNLANECLOSEDCW20-5TCENTERLANECLOSEDCW20-5CROADCLOSEDAHEADCW20-3DDETOURAHEADCW20-2DONE LANEROADAHEADCW20-4DBEPREPAREDTOSTOPCW3-4CW20-7LANE ENDSMERGERIGHTCW9-2TRLANE ENDSMERGELEFTCW9-2TL2RIGHT LANESCLOSEDCW20-5aTRSHOULDERWORKCW21-5ROADNARROWSCW5-1TRUCKSENTERINGROADWAYCW27-1TCW3-2CW4-3RCW4-3LCW21-1aT CW1-4LCW1-4RCW6-3CW12-1CW12-1CW12-1ENDROAD WORKG20-2ENDROAD WORKG20-2CW20-5LLEFTLANECLOSEDTOONCOMINGTRAFFICR1-2YIELDR1-2 APSTOPR1-1R5-1YIELDR1-2WRONGWAYR5-1a G20-1bR NEXT MILESXXROAD WORK ONE WAYR6-1L ONE WAYR6-1RCW1-7DETOURM4-10L DETOURM4-10RNAMEADDRESSCITYSTATECONTRACTORG20-6TBEGINROAD WORKNEXT X MILESG20-T ROADCLOSEDR11-2R11-3ROAD CLOSEDAHEADLOCAL TRAFFIC ONLYROAD CLOSEDTOTHRU TRAFFICR11-4****LOOSEGRAVELCW8-7FRESHOILCW21-2TURNLANECLOSEDAHEADCW20-5DTCENTERLANECLOSEDAHEADCW20-5DCCW28-1TPOWER LINESCW23-2NEWTRAFFICPATTERNAHEADUTILITYWORKAHEADCW21-7DWORK ZONExxWHEN WORKERS ARE PRESENT WORK ZONETRAFFIC FINES DOUBLE TALK OR TEXT LATERSTAY ALERTG20-10T M4-9SM4-9L M4-9RR3-2R3-1 PR8-3R5-2R3-4G20-1bL NEXT MILESXXROAD WORK INTERSTATETEXAS**ONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LCONSTRUCTIONENTRANCE**M4-9RM4-9L RAMPCLOSEDAHEADCW20-3DSLOW ALLEYCLOSEDAHEAD2RIGHT LANESCLOSED1/2 MILECW20-5aTR2LEFT LANESCLOSEDCW20-5aTLSPECIALEVENTAHEADTHRUTRAFFICMERGELEFTTHRUTRAFFICMERGERIGHT RUMBLESTRIPS ENDWORK ZONEG20-2ENDWORK ZONEG20-2CW3-3CW3-1FRWYCLOSEDAHEADCW20FY-3D CW1-4L CW1-4RTORAMPR1-2YIELD NEXT MILESXXROAD WORK NEXT MILESXX
Eric Putnam
Connor Siemers
CROSSWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
CROSSWALK
CLOSED
CROSSWALK CLOSED
USE OTHER SIDENEWS
CITY:
CONTRACTOR:
JOB NAME:
DART Silver Line
Coppell
S Belt Line Road & Sanders Loop
Archer Western Herzog
Left Lane Closure
NOTESSALESMAN EXECUTIVE
TCP DESIGNER
LEGEND
SCOPE OF WORK:
LOCATION:
CONTACT NUMBER:
CONTACT:
DATE:
469-771-8498
10/04/2021
Sid Mehta
Reedie Lea
THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND
IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM
THE REQUIREMENTS SET FORTH BY RELATED CONTRACT
DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (MUTCD) OR THE OVERALL
RESPONSIBILITY TO TRAFFIC CONTROL SAFETY.
All Traffic Control Plans (TCPs) are the property of Buyers
Barricades, Inc. and are included with Buyers Barricades
rental agreements. Traffic Control Plans issued without a
rental agreement will be charged to the customer.
Carrollton
-”1 Block Rule”
-First Buffer length shall be 2x the length of the Taper for
double lane closures.
Carrollton
-ADA Pedestrian Barricades for sidewalk closures
San Antonio/Austin/Surrounding Areas
-TMAs on all TxDOT plans
- Barrels for sidewalk closures
-Double up signs on TxDot plans
General Notes:1.Contractor shall be responsible to maintain traffic control as set forth in the Texas Manual onUniform Traffic Control Devices (TXMUTCD) for Streets and Highways.2.Lanes may be closed to traffic during 9 AM-4 PM only.3.Accessible pedestrian routes shall be maintained at all times.4.Contractor shall contact the City of Plano Project Manager or the Traffic Management Centerat least one week prior to lane closing if left turns from opposite directions cannot go togetheranytime due to road or utility work at a signalized intersection.5.Contactor shall coordinate with owner or related entity regarding lane closures on any privatestreet. Contractor shall follow the TXMUTCD guidelines.6.Applicant shall coordinate with school regarding any lane closure near or within school zone.7.Contractor shall notify home owners with alley access one week prior to alley closing.8.Contractor shall contact the City Environmental Waste Services Department and coordinatethe work so as to not interrupt the trash pickup schedule.
Annie Thornhill
Fencing Street Name
Alex Thlang
Stephen Mainka
-On freeways, FIRST and SECOND buffer length shall be 2x the length of the
Taper forTriple lane closures.
Freeway Closure Rule-TMAs to be placed after Type IIIs xx
ONLYONLY
Water Barrier w/Fence
ADA Pedestrian Barricade
BUMPxx
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK
CLOSED
SIDEWALK CLOSED
USE OTHER SIDE
Lauren Putnam
ROADWORK1 MILECW20-1FNTE - LBJ-”Road Work 1 MILE” sign on main lanes-Flags on “Road Work” signs-Add note for what TxDOT typical applies to plan
Arrow
Board
ROAD
WORK
AHEADCW20-1DEND
ROAD WORK
G20-2
END
ROAD WORK
G20-2 CW20-5LLEFT
LANE
CLOSED
ROAD
WORK
AHEADCW20-1DCW20-5LLEFT
LANE
CLOSED
ROAD
WORK
AHEADCW20-1DEND
ROAD WORK
G20-2
ROAD
WORK
AHEADCW20-1DEND
ROAD WORK
G20-2
100ft
Work
Zone
540ft
Taper
320ft
220ft
Buffer
320ft 320ft 320ft120ft
120ftAirline DrS Belt Line RdSanders LoopDevices spaced on 35ft centers
Posted speed limit 45MPH
Jeremiah Keys
Navigator
Type 3 Barricade