Loading...
WA0101-CS011205 December 5, 2001 Mr. Gary Hendricks Birkhoff, Hendricks & Conway, L.L.P. 7502 Greenville Avenue, #220 Dallas, Texas 75231 RE: SH 121 Water Line (Coppell Road to Denton Tap Road) WA 01-01 Engineering Services Agreement Dear Mr. Hendricks: We have reviewed the proposal for engineering services necessary to design approximately 8,800 linear feet of 12-inch water line along the easterly right-of-way of State Highway 121 and have the following comments for your consideration. I. BASIC SERVICES, Design Phase Revise "Printing of preliminary plans and specifications for review by the City and Utility Companies" to "After review and approval of conceptual plan, print preliminary plans and specifications for review by the City and the Utility Companies". 2. BASIC SERVICES, Construction Administration Revise "Assist in execution of Contract Documents" to "Assist in execution of Contract Documents by preparing five (5) sets of conformed contract specifications". 3. SPECIAL SERVICES, Printing of final plans and specifications for distribution to prospective bidders and the successful contractor If the final plans and specifications are picked up at your office, this item needs to be included under Special Services. If the final plans and specifications are picked up at the City, this item needs to be included as part of the Basic Services. 4. SPECIAL SERVICES, Preparation of Construction Record Drawings This item is listed under the Basic Services, Construction Administration and under the Special Services. 255 PARKWAY ~ PO.BOX 47EI ~' COPPE:LL TX 750t9 1¥ TEL 972/.462 0022 * FAX 9'72/304 3673 Please revise the Engineering Services Agreement as necessary and submit two copies for execution. Should you have any questions or need any additional information, please advise. Sincerely, aylor dinator