Spectrum-PT211019A copy of the approved permit must be on the job site at all times
Page 1 of 5RIGHT-OF-WAY USE PERMIT APPLICATION Rev.08/2020
Permit Valid for 120 Days From Date of Approval
All activity authorized by this permit shall be in accordance with
CHAPTER 283 of the Texas Local Government Code and the City of
Coppell Public Rights-of-Way Management ordinance No. 2001-944
Date of Submittal:__________________ Applicant’s Job # / Work Order #_____________________
Project Name / Location and Address:__________________________________________________
Permit Fee: $100.00 (No fee for applications submitted on behalf of Utility Companies with a current Public
Rights-of-Way Management Ordinance Registration). S.P.C.O.A. Certificate # ____________________
Utility Company Information:
Oncor Electric Delivery Atmos Energy Frontier x Spectrum
Level 3 Other:________________________________________________________
Utility Company Representative:____________________________________________________
E-mail Address:__________________________________Telephone:______________________
Contractor Information:
General Contractor:______________________________________________________________
General Contractor Representative:_________________________________________________
E-mail Address:__________________________________Telephone:______________________
Project Information:
General Description of Proposed Construction (Attach Plan & Profile, See Page 5 for Example):
Estimated Start Date:_______________ Estimated Completion Date:_________________
Has 811 and/or utility companies been contacted 48 hours prior to locate existing utilities?
Yes No If No, state reason:_________________________________________________
Is removal of existing streets, alleys or sidewalks necessary? Yes No
If YES, repair must have a City inspection prior to completion. Call 972-304-3679.
Is closure of any traffic lanes or driveway approaches necessary? Yes No
If YES, a traffic control plan in accordance with TMUTCD standards must be submitted, and
the following departments must be notified of the location and duration of the closure:
Police Department, 972-304-3600 Fire Department, 972-304-3512
Street Department, 972-462-5150 Engineering Department, 972-304-3679
Traffic lane closures are allowed from 9:30 a.m until 3:30 p.m. ONLY unless otherwise
approved by the City Engineer.
--Work activity is permitted from 7:00 a.m. until 7:00 p.m., Monday through Friday only.--
X
Right of Way Use Permit Application Page 2 of 5
This application, with signatures of Utility and Contractor representatives, must be submitted to the
Engineering Department for approval prior to commencing work. Printing your name and date on this
form indicates your acceptance of the terms and conditions of this application.
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim,
demand, or cause of action that may be made or come against it by reason of or if any way arising out of
the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from
the City, if such permit is granted.
________________________________________ ___________________________________
Signature of Utility Company Representative Date
________________________________________ ___________________________________
Signature of Contractor Representative Date
________________________________________ ___________________________________
APPROVED City Representative Date
DENIED
Comments:
E-mail address to return completed permit:__________________________________________________
Submit permit application by e-mail to engineer@coppelltx.gov, or deliver application to the
Engineering Department, Town Center Business Park, 265 E Parkway Blvd, Coppell, TX 75019
SUMMARY OF REQUIREMENTS FOR WORK WITHIN
THE CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS
1.A copy of the valid approved City of Coppell permit is required on the project site at all times.
2.Property owners (commercial and residential) adjacent to the project must be notified of the
project timeline and provided contractor names and phone numbers. No access to private
property without prior coordination with property owner.
3.Proper erosion control measures must be taken, in accordance with the Coppell Erosion Control
Ordinance No. 91-514.
4.Follow Texas MUTCD standards for work in traffic zones. Lane closures require the use of a
flashing arrow board for advance warning.
5.Grading shall be restored or improved, and sod replaced when necessary.
10/19/2021Scott Latta
X
Right of Way Use Permit Application Page 3 of 5
6.Irrigation repairs must be performed in a timely manner.
7.Follow OSHA trench safety guidelines at all times.
8.Repair existing utilities that are damaged, including but not limited to: Clean-outs, water valves,
wastewater manholes, water lines, wastewater lines and storm sewer lines.
9. Density tests may be required, at applicant’s expense, in trench lines (ASTM).
10.Protection and repair of traffic control devices and signage is the responsibility of the contractor.
11.No work is to be done in collector roadways before 9:30 a.m. or after 3:30 p.m.
12.Prior request of work activity on weekends and holidays must be submitted in writing.
13.Utility line locates must be performed in advance of construction by calling 811 or logging on
to the Texas811 Portal at: http://www.texas811.org. Additional utility contacts are as follows:
COPPELL PUBLIC WORKS - OPERATIONS COPPELL PUBLIC WORKS - ENGINEERING
972-304-3679
DENTON COUNTY LEVEE DISTRICT
972-315-5019
T.C.E.Q. Region 4
817-588-5800
IRVING WATER UTILITIES
972-721-2281
ATMOS ENERGY
888-286-6700
EXPLORER PIPELINE
918-493-5100
ONCOR ELECTRIC DELIVERY
888-313-6862
972-462-5150
HOMEOWNER ASSOCIATIONS
Planning Department: H.O.A. List
F.E.M.A.
940-898-5399
DALLAS WATER UTILITIES
214-670-5111
AT&T
800-924-9420
COSERV Gas & Electric
940-321-7800
FRONTIER COMMUNICATIONS
800-584-3384
SPECTRUM CABLE
833-780-1880
14. Debris must be removed from work area daily and disposed of properly outside the City.
15.Streets, sidewalks and alleys must be kept clear of construction materials and debris.
16.“Clean-up” requires returning work area to pre-construction condition or better.
Right of Way Use Permit Application Page 4 of 5
Contact Coppell Public Works Operations at 972/462-5150 to schedule an inspection with
Utility and Streets personnel to verify that your project has been completed to City of
Coppell specifications. Failure to schedule verification inspection may delay future projects.
Franchise Utility Name:___________________________________________________________
Project Location or Address:_______________________________________________________
Sub-contractor Company Name:____________________________________________________
24 hr. Contact Number:____________________________________________________________
Date of Verification Appointment:_________________________ Time:____________________
-INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL-
Inspected by:_________________ of Utilities Maintenance Division on _______________
and found to be acceptable, not acceptable because:___________________________
Follow-up needed? No Yes, follow-up scheduled for:__________________________
Inspected by:__________________ of Streets Maintenance Division on _______________
and found to be acceptable, not acceptable because:___________________________
Follow-up needed? No Yes, follow-up scheduled for:__________________________
A copy of this completed notice can be e-mailed to the Coppell Public Works
Operations Division, or delivered to the address below:
City of Coppell Public Works Department, Operations Division
816 S. Coppell Road
Coppell, TX 75019
COMPLETION VERIFICATION NOTICE
VICINITY MAPBRIDGESTONE695 STATE HWY 121COPPELL, TXDFW TELECOM, INC.DAVID HATTON 972.670.2113
TRENCH DETAILTYPICAL PAVEMENT BORE DETAILTYPICAL UTILITY CROSSINGCOPPELL, TX695 STATE HWY 121BRIDGESTONE131122981" = 10'1" = 40'1DAVID HATTON 972.670.2113LEGENDESTIMATED SHEET TOTALSDESCRIPTIONQUANTITYQUANTITYDESCRIPTION09-19-2021•••••••0500-05-10-15STATE HWY 121
BRIDGESTONE695 STATE HWY 121PROPOSED 1-4" PVCPROPOSED 1-2" HDPE
VL852
VL
VL
C697-NA
C697-100
C700*5
C700-175
NA
834
NA
838
NA
VL
851
NA
718
722
726
730
734
738 742
746
840
836
848
844
VL
849
845
VL
VL
C475
501
475-NA
C633*3
C529
VL
C645
C533*9
802
NA
NA
806
NA
810
NA
814
818
NA
822
NA
826
NA837
830841
VL
C811
701 705
822
818
814
810
709
806
802
713
719
717
716
723
721
727
720
725
731
724
729
735
728
733
732
739 743
736
737
635 641
652
656 NA
644 648 660 664
C615-300
C615-330
C621-420
C621-400
C621-100
740
747
741
744
751
745
VL
VL
701
801
832
828
820
824
816
812
808
804
805
809
730
813
833
829
825
817
821
817
813
809
805
616
613 620
631
617
624
628
621
625
632
640
636
C615-100
C615-200
C611
656
714710660664668 718706672652702
722
726
633630
634 637
638
627
618
609
734
821
825
829
833
132'
112'
217'
34'16'
360'450'
30'
233'104'481'22'
279'596'
673'168'
5'5'
3
5'
160'489'
8'
261'
782'
30'
1
8
5'
42'
263'
160'
310'
90'
85'
282'
262'
135'
12'
10'
167'
1273'564'
180'300'21'155'
60'
227'
195'
140'155'
375'
85'
157'
215'125'32'161'218'56'50'
230'383'
100'66'500'
196'35'50'282'425'354'410'154'115'85'44'35'
5'
400'505'220'350'104'64'50'25'75'57'
60'15'
42'
42'
370'
42'
405'
65'
276'238'
565'
1143'
540'
227'
265'
383'100'
36'
354'
100'
137'
342'
334'
100'
7'12'132'97'3'
182'
253'135'5'100'15'
565'
230'215'100'110'100'51'111'-12-8
-12-8
-9
20.4
15.9
10.7
49.2
44.5
37.2
51
46.3
39
21.3
18.5
15.2
33.2
31.9
31.6
37.7
34
29.2 816.2
15.8
17.2 2026 1711 19.2
19.3
21.5
11 14
2020232017232017171411
20.4
19.8
19.6
1126417.6
18.6
19.8
4 17.9
18.1
17.61417262623 23 20
14.4
13.7
14.3
23
17.1
14.5
12.3
17 17.4
16.8
15.1
4
17.2
17.3
19.1
1
0
18.1
17.7
20.4
1
4
144
14.4
14.3
15.8
7
1
0
9
7
8
5
6
4
6
0
0
7
9
6
0
00
0
0
0
6
10
2
0
0
20
0
0
0
2
1
0
0
1
0
9
0
0
0
0
1
0
0
2
0
1
0
0
3
0
0
2
0
2 2 0
0
0
2
0
1
0
2
2
4
2
0
1
1
0
0
2
4
2
1
1
0
0 UCV
VV
VV
V UCV
UC
V
V
V
V
V
1424131
1BLE-1000 @51
4424AAB1G0
27.9 28.9
46.3 39
13 4
89.1
502
4424AAB1G0
I
1BLE-1000 @51
4424AAA2B0
22.5 21.7 21.2
51 46.3 39
4 3 5 4
4424A 89.6
565
4424AAA2B0
I
1BLE-1000 @51
4424AAA1A0
21.6 22.9 29.8
51 46.3 39
3 17 14 8
4424A 89.1
1269
4424AAA1A0
I
4MB-1000 @51
4418AAC3Y0
20.4 20.7 23.5
51 46.3 39
10 5 4 6
4418A 80.5
1115
4418AAC3Y0
I
4BLE-1000 @51
4418AAC3X0
23.7 23.2 25.5
51 46.3 39
5 8 10 6
4418A 80.1
1040
4418AAC3X0
T
4MB-1000 @51
4418AAC3W0
17.5 19.8 29.3
51 46.3 39
6 17 10 8
4418A 79.1
1634
4418AAC3W0
I
1BLE-1000 @51
4424AAB1E0
23.3 24 27.5
51 46.3 39
5 11 12 4
4424A 89.0
651
4424AAB1E0
4418AA4502BB
4424AA4418AA45D4AA
TELCO RM
STE 420
SERV RM
STE 400
500-520
B1-B9
LAKE VISTA DRMACARTHUR BLVDSTATE HIGHWAY 121 BYP
STATE HIGHWAY 121 BYP
STATE HWY 121 BYP
FOREST HILL DR
R
OC
KBR
O
O
K
DR
STATE HW Y 121
MACARTHUR BLVDSNOWSHILL TRLTHORNBURY WAYWARWICK LN MILTON WAYLAKE VISTA PLCOAX NOT BUILT
DP
DP
DP
DP
DP
DP
DP DP
DP DP
DP
DP
DP
DP
DP
DP
DP
DP
DP
DP
DP
DP
DP
DP
DP
DP
DP
DP
DP
DP
DP DP
DP
DP DP
DP
DC 12
C O N D U IT
" ?
CONDUIT
" ?
CONDUIT
" 2
NTS32'262
CLAREMONT CT3
5
8'
0 1
C695
19.5
18.4
18.5
4
3
1
1
2
2
9
8
NODE- 4424
MAP# 3066 - 3324
AFTER
TIE POINT,
REMOVE
TERMINATOR