Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Level 3-PT211223
12/23/2021Scott Latta X Jeromie Cagle 11/15/2021 No Boring or Excavation Allowed Until January 3rd, 2022. Potholing and Pulling Cable Thru Existing Conduit or Aerial is Allowed From the Date of Permit Approval.