Loading...
PA9702-LR000208REPORT OF STRUCTt" IAL STEEL INS CTh_,N PE a division of']r~lgya~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/03/2000 Report No.: 0003573 Report Date 02/08/2000 Client No.: COPPELL ProjectNo.: 94991118 Client: CityofCoppell Project: CoppellAquatie/RecreationCtr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Structural steel inspection. On this date, an HBC Engineering representative arrived at the above referenced jobsite as scheduled for structural steel inspection. A visual reinspection was conducted as noted below. Metal deck installation between lines R1 to R6 and RB to 8, Radius Low Roof Level Area was inspected. Metal deck installation has been repaired and the puddle weld and side lap screws were now determined to be compliant with the exception at the northeast slope area between lines R3 to R4. The erector has to change the top of the steel elevation to meet the adjacent roof along line 8. Technician: Randy Walcker Report Distribution: (1) City of Coppel] (1) City ofCoppcll - Engineering (I) BrinkIcy Sargent Architects (1) City ofCoppell - Bldg. lnsp. (I) Turner Engineers (1) City ofCoppell - Leisure Scrv Dept Senior Project Engineer ( I ) Hisaw & Associates This report is exclusively for tbe use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99SDS Page I of 1