Loading...
Woodlands-LR 950706ALPHA TESTING, I,.J. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPO ' T OF FIELD COMPACTION TESTS TESTEDFOR: W.O.C. INVESTMENTS, [NC. DATE: 07/06/95 C/O FINLEY DEVELOPMENT ADDISON, TEXAS PROJECT: WOODLANDS OF COPPELL COPPELL, TEXAS OUR REPORT NO. 95230--12 TEST DATA: TEST I r ~ ELEV. SOIL ID OPTIMUM MAXIMUM ~B IN P~CE IN P~ PERCE~ ~ M~STURE DRY DE~ MOISTURE DRY ~NSITY COMPACTION COMMEN~ NO. DATE /DE NUMBER % PCF % ~F 52 07/06 FG 2 15.3 111.3 15.8 110 99 53 07/06 FG-2.0 2 15.3 111.3 16.7 108 97 1-A 54 07/06 FG-4.0 2 15.3 111.3 16.1 108 97 1-A 55 07/06 FG 2 15.3 111.3 17.5 108 97 1-A 56 07/06 FG-4.0 2 15.3 111.3 17.7 108 97 1-A 57 07/06 FG-2.0 2 15.3 111.3 17.2 108 97 1-A 58 07/06 FG 2 15.3 .111.3 17.3 108 97 1-A TEST LOCATION: 52 SANITARY SEWER LINE "E" STATION 2+00 53 SANITARY SEWER LINE "E" STATION 2+50 54 SANITARY SEWER LINE "E" STATION 4+50 55 SANITARY SEWER LINE "E" STATION 4+60 56 SANITARY SEWER LINE "G" STATION 0+25 57 SANITARY SEWER LINE "G" STATION 0+50 58 SANITARY SEWER LINE "G" STATION 1+70 1.FILL 2. NATURALSUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WlTH SPECIFICATIONS D. RETEST Respectfully S_~lbrnltte~