Woodlands-LR 950706ALPHA TESTING, I,.J.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(214) 620-8911
REPO ' T OF FIELD
COMPACTION TESTS
TESTEDFOR: W.O.C. INVESTMENTS, [NC. DATE: 07/06/95
C/O FINLEY DEVELOPMENT
ADDISON, TEXAS
PROJECT:
WOODLANDS OF COPPELL
COPPELL, TEXAS
OUR REPORT NO. 95230--12
TEST DATA:
TEST I r ~ ELEV. SOIL ID OPTIMUM MAXIMUM ~B IN P~CE IN P~ PERCE~
~ M~STURE DRY DE~ MOISTURE DRY ~NSITY COMPACTION COMMEN~
NO. DATE /DE NUMBER % PCF % ~F
52 07/06 FG 2 15.3 111.3 15.8 110 99
53 07/06 FG-2.0 2 15.3 111.3 16.7 108 97 1-A
54 07/06 FG-4.0 2 15.3 111.3 16.1 108 97 1-A
55 07/06 FG 2 15.3 111.3 17.5 108 97 1-A
56 07/06 FG-4.0 2 15.3 111.3 17.7 108 97 1-A
57 07/06 FG-2.0 2 15.3 111.3 17.2 108 97 1-A
58 07/06 FG 2 15.3 .111.3 17.3 108 97 1-A
TEST LOCATION:
52 SANITARY SEWER LINE "E" STATION 2+00
53 SANITARY SEWER LINE "E" STATION 2+50
54 SANITARY SEWER LINE "E" STATION 4+50
55 SANITARY SEWER LINE "E" STATION 4+60
56 SANITARY SEWER LINE "G" STATION 0+25
57 SANITARY SEWER LINE "G" STATION 0+50
58 SANITARY SEWER LINE "G" STATION 1+70
1.FILL
2. NATURALSUBGRADE
3. LIME STABILIZED
4. CEMENT TREATED
A. TEST RESULTS COMPLY WITH SPECIFICATIONS
B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
C. MOISTURE DOES NOT COMPLY WlTH SPECIFICATIONS
D. RETEST
Respectfully S_~lbrnltte~