Waters Edge P2-CS 940114 The City With A Beautiful Future January 14, 1994 P.O. Box 478 Coppell, Texas 75019 214-462-0022 Mr. Tim House Waters Edge Joint Venture 5220 Spring Valley Suite 500 Dallas, TX 75240 RE: Waters Edge Phnse H Development Fee Assessment Dear Mr. House: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Waters Edge Phase II. Please provide a check made payable to the City of Coppell in the amount of $21,150.28 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Date: Project: CITY OF COPPELL DEVELOPMENT FEES January 10, 1994 Waters Edge Phase H Addition Water Impact Fee (100% due prior to Council Approval) Water Tap Inspection Fee (100%due at Issuance of Building Permit) Wastewater Impact Fee (100% due prior to Council Approval) Sewer Tap Inspection Fee (100%due at Issuance of Building Permit) Utility Final Inspection Fee (100%due at Issuance of Building Permit) Water Meter Fee (Lots) (100%due at Issuance of Building Permit) Water Meter Deposit (100%due at Issuance of Building Permit) Street Sign Fee (100%due prior to Acceptance of Project) Street Light Fee (100%due prior to Acceptance of Project) Park Fee (50% due prior to Council Approval) (50%due prior to Issuance of Building Permit) TOTAL TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL + Construction Inspection Fee (2% of Project Cost due prior to preconstruction meeting) TOTAL ASSESSMENT AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 13,000.00 $ 13,000.00 $ 2,000.00 -0- $ 4,500.00 $ 4,500.00 $ 2,000.00 -0- $ 1,000.00 -0- $ 445.00 -0- $ 6O0.0O -0- $150.28 $150.28 * -0- $ 7,000.00 $ 3,500.00 $ 30,695.28 $ 21,150.28 $ 21,150.28 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: 1/4/94 Ken Griffin, P.E., City Engineer Public Works Staff Development Fees for Waters Edge Phase II The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 20 - 5/8" x 3/4" Domestic Meter/s = 20 ESU's This ass4essment does not include irrigation meter fees and impact information was not available. Total 20 ESU's @ $650.00 ea = $13,000.00 100% due prior to Council approval of the final plat. Wastewater Impact (City) 20 - 5/8" x 3/4" Residential Meters = 20 ESU's Total 20 ESU's @ $450.00 ea = $4,500.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 20 Connections @ $100.00 each = $2,000.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Sewer Tap Inspection Fee 20 Connections @ $100.00 each = $2,000.00 100% due prior to issuance of building permit. Development Fees Page 2 Utility Final Inspection Fee 20 lots @ $50.00/lot = $1,000.00 100% due prior to issuance of building permit. Water Meter Fee (Lots) 20 - 5/8" x 3/4" Residential Meters @ $22.25 ea = $ 445.00 100% due prior to issuance of building permit. Water Meter Fee (Irrigation) - 5/8" x 3/4" Irrigation Meters @ $22.25 ea Total Information not available. 100% due prior to issuance of water meters. = $ $ Water Meter Deposit Residential - 20 meters @ $30.00 ea = $ 600.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Development Fees Page 3 Park Fee Residential Lots at $150.00 each = $ Units (Multi family) at $150.00 each = $ For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: 20 Residential Lots at $350.00 each = $ 7,000.00 Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/dm cc: Steven G. Goram Director of Public Works DEVFEES.HLP Development Fees Page 4 STREET SIGN ASSESSMENT for Waters Edge Phase II Addition The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY No Parking $53.10 Speed Limit $63.54 2 Yield $58.56 Stop $65.12 Street Name $11.60 2 Stop & Street Combo $96.85 EXTENDED PRICE $127.08 23.20 OTHER TOTAL 4 $ 150.28 Cost breakdowns may be obtained from Public Works by written request. FEES.HLP.WTRSEDII Revised 12/15/92 COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: January 13, 1993 Ken Griffin, P.E., City Engineer Public Works Staff Development Fees for Waters Edge Phase II Attached is a revised compilation of the fees due for Waters Edge Phase II. Due to misinformation regarding the date of the preliminary plat approval the fees listed for park fees were incorrect. The correct fees will be 20 residential lots at $350.00 each for a total of $7,000.00. We hope this did not cause a problem. RSW/dm