Loading...
CF-Coppell Rd SC-LR011106 (2)Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 01.1054 CLIENT: Texas Unified Constructors, Inc. DATE: 6 November 2001 PROJECT: Field Service Offices & Maint. Fac., Coppell SUPPLIER: Lattimore LOCATION OF POUR SET 1: Piers: FD/11, FD/10, FD/9, FD/8, FD/3, FD/2, FD/1, C/12, D/12 and F/12 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 54 Truck No. 761 Cement 414 Type I Ticket No. 6163941 Flyash 103 Time Batched 2:59pm Sand ' 1433 Time Sampled 3:35pm in. Concrete Temp. (ASTM C1064) 75°F 1.0 in. 1850 Air Content (ASTM C231) Water 250 Unit Weight (ASTM C138) Admix //1 Plastocrete 161 @ 15.5 oz. Admix //2 AEA COMPRESS/VE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM C143) psi Strength 37 5.25 7 11/13/01 103,900 3670 38 5.25 28 12/04/01 151,800 4660 39 5.25 28 12/04/01 ;134,400 4750 40 5.25 56 01/01/02 149,00O 5Z70 28-Day Average 4710 3000 TECHNICIAN: DISTRIBUTION: EWM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214),351-5148