VariSpace Coppell-PT210630Adolfson & Peterson Construction 1600 N. Collins Blvd, Suite 2000 Richardson, TX 75080 Phone: 972-387-1700 Varispace Coppell Estimator: CM Coppell, TX Taxes:Excluded Site - Civil Scope GMP Project SF: 184,252 Schedule: 12.5 Date: 6/30/2021 DESCRIPTION QUANTITY UNIT UNIT $ TOTAL $ $/SF DIVISION 3 Concrete Concrete 032000 Concrete Reinforcing 1 LS included included 316329 Drilled Concrete Piers 1 LS included included Building & Garage Connector Canopy - Cased Piers 1 LS included included 321314 Concrete Paving for Landscape Flatwork 1 LS included included 9" Approach & Decel Lane off 121 Frontage 1 LS not included not included Private Scope - Concrete Paving 722,200.00 722,200.00 Pumping of Paving 1 LS included included 5" Paving at Parking Spaces 1 LS included included 6" Paving at Drive Isles 1 LS included included Public Paving Scope - Concrete Paving 73,000.00 73,000.00 6" Paving at Decel lanes at Northwestern 1 LS included included 6" Mono Curb 1 LS included included Mow Strip - Landscaping Curb 1 LS included included Transformer Pad - No Foundation 1 LS included included 4" Standard Gray Sidewalk 1 LS included included Public/ROW Scope - Sidewalks 1 LS 90,500.00 90,500.00 Private Scope - Sidewalks 1 LS 97,000.00 97,000.00 Light Pole Foundation - Pier Size Note Listed 3/S3.01 1 LS included included ADA Pavers 1 LS included included Monument Sign Foundations 1 LS 5,000.00 5,000 Traffic Control Allowance 1 LS 25,000.00 25,000 Pad for "Signage NIC" - A1.01 - Not Designed (6 Shown)1 LS 15,000.00 15,000 1,027,700$ $5.58/SF DIVISION 33 Utilities Utilities Public/ROW Scope 1 LS included included Maintenance Bond 1 LS included included City Inspection Fee 1 LS included included Traffic Control 1 LS included included Storm 1 LS 53,063.00 53,063.00 24" RCP 62 LF included included 10' Inlet 1 LS included included Remove & Replace Street Paving 538 SF included included TV Storm 1 LS included included Concrete TOTAL Water 1 LS 48,789.00 48,789.00 Connect Existing 8" Stub out 2 EA included included 8x8 Tee 1 EA included included 8" DR18 PVC 32 LF included included 4" Valve 1 EA included included 8" Valve 3 EA included included 2" Meter & Service Deadhead 1 EA included included Domestic Water 5' Max Depth 1 LS 90,000.00 90,000.00 Connect Existing 8" via Cut In Tee 1 EA included included 8x4 Tee 1 EA included included 4" Meter & Service 1 EA included included Sanitary 1 LS 1,500.00 1,500.00 Connect Existing 1 LS included included Private Scope 1 LS included included Domestic Water 5' Max Depth 1 LS 53,537.00 53,537.00 4" DR18 PVC Piping 285 LF included included Fire Water 1 LS 43,155.00 43,155.00 8" DDC 2 EA included included 6" Valve 7 EA included included 8" Valve 7 EA included included Fire Hydrants 6 EA included included 6" DR14 PVC Piping 457 LF included included 8" DR18 PVC Piping 2,186 LF included included Remote FDC 1 EA included included 8" Riser 2 EA included included Storm Drain 8' Max Depth 1 LS 188,798.00 188,798.00 Connect to Existing 1 EA included included Piping - RCP 1 LS included included 12"373 LF included included 18"568 LF included included 24"1,300 LF included included 30"195 LF included included 36"82 LF included included Inlets 1 LS included included 5' Curb Inlet 3 EA included included 10' Curb 2 EA included included 24x24 Grate inlet Std Depth 6 EA included included 4' Manhole 2 EA included included SWPPP 8 EA included included Sanitary Sewer 11' Max Depth 1 LS 78,096.00 78,096.00 6" Clean out 5 EA included included 6" SDR35 PVC Piping 816 LF included included 4' Manhole 3 EA included included Spoils Haul Off 2,250 CY included included 556,938$ $3.02/SF Site - Civil Scope TOTALS 1,584,638$ $8.60/SF Utilities TOTAL