Loading...
Gateway BP(1.7)-PT210622Wildstone Construction, LLC 12850 Hwy 287 Fort Worth, Texas 76052 Phone: 817-847-8660 Fax: 817-847-8019 Quote To: Date: 6/22/2021 Phone: Attn: Jay Mcgee Fax: Project: Coppell, TX Item No.Quantity Unit Description Unit Price Extension 1 880 LF $35.00 $30,800.00 2 37 LF $427.00 $15,799.00 3 2 EA $2,879.00 $5,758.00 4 1 EA $2,617.00 $2,617.00 5 1 EA $1,647.00 $1,647.00 6 2 EA $1,762.00 $3,524.00 7 1 LS $1,990.00 $1,990.00 8 880 LF $1.00 $880.00 9 880 LF $0.50 $440.00 Sub Total- $63,455.00 Item No.Quantity Unit Description Unit Price Extension 1 3740 LF $35.00 $130,900.00 2 460 LF $31.00 $14,260.00 3 720 LF $20.00 $14,400.00 4 10 EA $3,898.00 $38,980.00 5 12 EA $1,642.00 $19,704.00 6 12 EA $1,211.00 $14,532.00 7 2 EA $17,938.00 $35,876.00 8 4 EA $2,146.00 $8,584.00 9 2 EA $3,698.00 $7,396.00 10 4 EA $446.00 $1,784.00 11 1 LS $20,682.00 $20,682.00 12 4920 LF $1.00 $4,920.00 13 4920 LF $0.50 $2,460.00 Sub Total- $314,478.00 Item No.Quantity Unit Description Unit Price Extension 1 14 LF $37.00 $518.00 2 1 EA $8,125.00 $8,125.00 3 1 EA $1,025.00 $1,025.00 4 1 LS $500.00 $500.00 5 1 LS $500.00 $500.00 Sub Total- $10,668.00 Item No.Quantity Unit Description Unit Price Extension 1 752 LF $37.00 $27,824.00 2 276 LF $33.00 $9,108.00 Public Water Connect To Existing SSMH Adjust Existing SSMH To Grade 8" SDR-26 PVC 6" SDR-26 PVC Fire Hydrant Gateway Business Park Bollard Ductile Iron Fittings Water Testing Trench Safety 8" Gate Valve & Box 6" Gate Valve & Box 8" DDC Valut 6" In Building Fire Riser 1' AFF 6" Remote FDC Sewer Testing Trench Safety Private Sewer Public Sewer 8" SDR-26 PVC FCL Builders 2401 E Randol Mill Rd 150 Arlington, Tx 76011 8" DR-14 PVC 16" Steel Casing(BOTOC) 8"X2" Domestic Water Service W/BFP 8"X1.5" Irrigation Water Service W/BFP 8" Gate Valve & Box Connect To Existing 8" Water Stubout Ductile Iron Fittings Water Testing Trench Safety Private Water 8" DR-14 PVC 6" DR-14 PVC 2" SDR-9 Poly Gateway Business Park CO Page 1 of 2 3 2 EA $10,982.00 $21,964.00 4 1 EA $10,296.00 $10,296.00 5 2 EA $6,232.00 $12,464.00 6 4 EA $1,425.00 $5,700.00 7 1028 LF $1.00 $1,028.00 8 1028 LF $1.00 $1,028.00 Sub Total- $89,412.00 Item No.Quantity Unit Description Unit Price Extension 1 850 LF $343.00 $291,550.00 7 1 EA $18,497.00 $18,497.00 8 1 EA $6,002.00 $6,002.00 9 3 EA $2,698.00 $8,094.00 10 12 EA $1,234.00 $14,808.00 11 134 LF $18.00 $2,412.00 12 30 LF $11.00 $330.00 13 1 EA $1,324.00 $1,324.00 14 1 EA $1,295.00 $1,295.00 15 1 EA $1,596.00 $1,596.00 16 2244 LF $1.00 $2,244.00 17 2244 LF $0.50 $1,122.00 18 20 LF $18.00 $360.00 Sub Total- $349,634.00 Item No.Quantity Unit Description Unit Price Extension 1 44 LF $82.00 $3,608.00 2 116 LF $66.00 $7,656.00 3 226 LF $53.00 $11,978.00 4 130 LF $27.00 $3,510.00 5 5 EA $3,326.00 $16,630.00 6 7 EA $6,459.00 $45,213.00 7 2 EA $5,082.00 $10,164.00 8 3 EA $849.00 $2,547.00 9 516 LF $1.00 $516.00 10 516 LF $0.50 $258.00 11 763 LF $253.00 $193,039.00 12 83 LF $82.00 $6,806.00 13 287 LF $66.00 $18,942.00 14 261 LF $53.00 $13,833.00 15 8 EA $3,328.00 $26,624.00 16 6 EA $2,179.67 $13,078.02 Sub Total- $374,402.02 TOTAL QUOTE: $1,202,049.02 Item No.Quantity Unit Description Unit Price Extension 1 2540 CY $8.40 $21,336.00 2 1 LS $13,031.00 $13,031.00 Sub Total- $34,367.00 18" CL III RCP 5' STD. Curb Inlet(AVG. 5' Depth) 24" CL III RCP 24" Catch Basin 18.5'X10.5' Junction Box(9.5' Depth) 6'X6' Junction Box(6.5' Depth) Connect To Existing RCB 30" CL III RCP 24" CL III RCP 18" CL III RCP 6" N-12 HDPE Remove Existing Headwall TV Public Storm Trench Safety Private Storm Concrete Collar Remove Existing 6'X5' RCB Remove Existing 18" RCP Remove Existing Junction Box Remove Existing Wye Inlet 6" Double Cleanout Sewer Testing Trench Safety Public Storm 5' Dia. SSMH W/Coating(AVG. 15.5' Depth) 5' Dia. Drop SSMH W/Coating(12' Depth) 4' Dia. SSMH W/Coating(AVG. 8.5' Depth) 6'X5' RCB 5'X4' RCB 30" CL III RCP Remove Existing 7'X5' RCB Miscellaneous Adds If Needed Haul Spoils Offsite PP&M Bond For Public Portion Trench Safety 5' STD. Curb Inlet(AVG. 5' Depth) 6- Grate Inlet(4.5' Depth) 4- Grate Inlet(4' Depth) 12" Catch Basin TV Private Storm Gateway Business Park CO Page 2 of 2 BBiidd DDaattee:: 0033//1155//22002211 AAddddeenndduumm:: 0011,,0022 REVISED Turn-Key Proposal Gateway Business Park – Coppell, TX We propose to provide all labor, materials, and equipment to perform the following concrete work as shown below and per the attachments for a lump sum price of…$5,120,000.00 Alternates: (1) Pumping of Paving Add $39,800.00 (2) Rebar for Lifting/Bracing of Tilt-wall Panels Included (3) Backfill of Curbs (within 2’-0” of back of curb) Included (4) Haul-off of Spoils (TAS estimates 2,082 cy) Included (5) Light Pole Bases (TAS estimates 5 ea) Included (6) Pipe Bollards – No Coring (TAS estimates 28 ea) Included (7) Dock Leveler Pits (TAS estimates 67 ea) Add $100,500.00 (8) Dowel Baskets at Bldg 1 speed bay Included (9) Dowel Baskets at Bldg 2 speed bay Included (10) Ductilcrete Slab ILO Traditional SOG Building 1 Add $87,600.00 Building 2 Add $69,100.00 (11) Formliner Concrete Panels ILO Metal Panels Building 1 (5,600 sf - $2.50/sf material allowance) Add $28,000.00 Building 2 (5,400 sf - $2.50/sf material allowance) Add $27,000.00 Unit Prices: (1) Light Pole Bases Add $850.00 / EA (2) Pipe Bollards – No Coring Add $185.00 / EA (3) Casting Beds (including demo/haul-off) Add $2.50 / SF (4) Stacking of Tiltwall Panels Add $2,500.00 / EA (5) Deadmen (including demo/haul-off) Add $110.00 / LF (6) 4” Housekeeping Pads Add $12.00 / SF Base Bid Considerations: Sales Tax Included Yes Payment & Performance Bond Included No Gateway Business Park – Coppell, TX TAS Commercial Concrete Construction, L.L.C. Page 2 of 8 Proposal subject to Natural and Political Force Majeure events. This proposal is good for 30 days and conditioned upon the use of Consensus DOCS 750 or other acceptable language and mutually agreeable schedule. Questions regarding this project should be directed to Jay McWhorter at (214) 905-4112. Please do not hesitate to call. Sincerely, TAS Commercial Concrete Construction, L.L.C. Jay McWhorter Joe Hiebert Jay.mcwhorter@tasconcrete.com jhiebert@tasconcrete.com Attached: Exhibit “A” – Scope of Work Summary, Exhibit “B” – Drawings and Specifications Gateway Business Park – Coppell, TX TAS Commercial Concrete Construction, L.L.C. Page 3 of 8 Exhibit “A” – Scope of Work Summary The following are the inclusions, alternates, pricing qualifications, clarifications/variations to specs and drawings, and exclusions per the documents listed in Exhibit “B”. All quantities are for comparison purposes only. Proposal Breakdown: Site $1,215,572.00 Building 1 $2,113,128.00 Building 2 $1,791,900.00 BASE BID $5,120,600.000 *Breakdown is intended for accounting purposes only and not to be construed as stand-alone bids Site Scope Cost Breakdown: 5” Paving 72,356 sf $216,146.00 7” Paving 63,972 sf $279,077.00 8” Paving 128,669 sf $603,829.00 6” Monolithic Curb 7,884 lf $45,863.00 4” Building Sidewalks 12,484 sf $70,646.00 TOTAL $1,215,572.00 Gateway Business Park – Coppell, TX TAS Commercial Concrete Construction, L.L.C. Page 4 of 8 Building 1 Scope: 24” Piers, 48” Bells [4,000 PSI; (6) #8’s & #3’s@16”OC] 16 ea 24” Piers, 56” Bells [4,000 PSI; (6) #8’s & #3’s@16”OC] 14 ea 30” Piers, 60” Bells [4,000 PSI; (9) #8’s & #3’s@16”OC] 119 ea 30” Piers, 66” Bells [4,000 PSI; (9) #8’s & #3’s@16”OC] 10 ea Pier Caps [3,000 PSI; 150 pounds per cap reinforcing] 20 ea Continuous Footings [3,000 PSI; #4’s trans & (3) #5’s long T&B] 232 lf 7” Slab on Grade [4,000 PSI; #3’s @18” OCEW; 10-mil vapor barrier] 175,107 sf 6” Ramp Slab [4,000 PSI; wire mesh] 2,028 sf 8.0” Tilt-wall Panels [4,000 PSI; 4.0 PSF reinforcing] 44,998 gsf 8.5” Tilt-wall Panels [4,000 PSI; 4.0 PSF reinforcing] 22,869 gsf 9.25” Tilt-wall Panels [4,000 PSI; 4.0 PSF reinforcing] 1,005 gsf 10.0” Tilt-wall Panels [4,000 PSI; 4.0 PSF reinforcing] 6,223 gsf 11.0” Tilt-wall Panels [4,000 PSI; 4.0 PSF reinforcing] 2,473 gsf 11.25” Tilt-wall Panels [4,000 PSI; 4.0 PSF reinforcing] 9,269 gsf Casting Beds 20,000 sf 6” Slab on Deck [3” thick w/3” flutes; 3,000 PSI; wire mesh] 256 sf Concrete Walls [3,000 PSI; 5.0 PSF reinforcing] 2,300 sf Building 2 Scope: 24” Piers, 48” Bells [4,000 PSI; (6) #8’s & #3’s@16”OC] 13 ea 24” Piers, 56” Bells [4,000 PSI; (6) #8’s & #3’s@16”OC] 14 ea 30” Piers, 60” Bells [4,000 PSI; (9) #8’s & #3’s@16”OC] 101 ea 30” Piers, 66” Bells [4,000 PSI; (9) #8’s & #3’s@16”OC] 8 ea Pier Caps [3,000 PSI; 150 pounds per cap reinforcing] 19 ea Continuous Footings [3,000 PSI; #4’s trans & (3) #5’s long T&B] 234 lf 7” Slab on Grade [4,000 PSI; #3’s @18” OCEW; 10-mil vapor barrier] 138,171 sf 6” Ramp Slab [4,000 PSI; wire mesh] 2,056 sf 8.0” Tilt-wall Panels [4,000 PSI; 4.0 PSF reinforcing] 43,181 gsf 8.5” Tilt-wall Panels [4,000 PSI; 4.0 PSF reinforcing] 20,842 gsf 9.25” Tilt-wall Panels [4,000 PSI; 4.0 PSF reinforcing] 455 gsf 10.0” Tilt-wall Panels [4,000 PSI; 4.0 PSF reinforcing] 6,073 gsf 11.25” Tilt-wall Panels [4,000 PSI; 4.0 PSF reinforcing] 9,182 gsf Casting Beds 20,000 sf 6” Slab on Deck [3” thick w/3” flutes; 3,000 PSI; wire mesh] 352 sf Concrete Walls [3,000 PSI; 5.0 PSF reinforcing] 2,340 sf Gateway Business Park – Coppell, TX TAS Commercial Concrete Construction, L.L.C. Page 5 of 8 Site Qualifications/Clarifications: 1) Proposal is based on paving sub-grade preparation by others. Price includes fine grading with on-site material provided by others. No import fill material for fine grading is included. Sub-grade to be +/- .10’ balanced (by others). 2) No provisions have been made for pumping of concrete paving. Proposal is based on backing over in place reinforcing as needed. 3) All concrete paving to be placed and finished by hand (no paving machine). 4) All curing to be by spray/roll on clear dissipating compound. 5) All curbs poured monolithically with paving (no separate curbs & gutter). 6) Proposal is predicated upon a maximum of 10 paving pours to complete this scope of work. Additional pours will incur additional costs. 7) TAS has assumed a 5 day, 45 hour work week. Building Qualifications/Clarifications: 1) Proposal is based on paving sub-grade preparation by others. Price includes fine grading with on-site material provided by others. No import fill material for fine grading is included. Sub-grade to be +/- .10’ balanced (by others). 2) Backfill for foundations and tilt-wall panels is based on using onsite-excavated materials. 3) Pumping of concrete (excluding drilled piers) as required is included. 4) All spoils will be stockpiled on-site. Hauling spoils offsite is excluded. 5) All drilled piers are 15 ft deep from the top of finished floor for estimating purposes. 6) Proposal predicated upon concrete slab on grade Ff & Fl testing (by others) and acceptance per Div. 3 specifications (ASTM E 1155-96). Remedial work in accordance with Div. 9 specifications is specifically excluded. 7) All slab-on-grade control joints will be soff-cut. 8) Proposal is predicated upon a maximum of 11 slab-on-grade pours (excluding the pour strip) to complete this scope of work. Additional pours will incur additional costs. 9) Proposal is predicated upon a maximum of 8 tilt-wall panel pours to complete this scope of work. Additional pours will incur additional costs. 10) At all slabs-on-deck Ff & Fl tolerances will not be applicable, decks will either be pinned or gauged for depth of concrete poured only. 11) TAS has assumed a 5 day, 45 hour work week. Pier Unit Prices: Greater Lesser Casing 24’’ piers $ __46.00__ /lf $ __17.00__ /lf $ ___NA___ /lf 30’’ piers $ __67.00__ /lf $ __27.00__ /lf $ ___NA___ /lf • MINIMUM CASING CHARGES: NA • STANDBY / WAITING TIME: $375.00 / HR • ADDITIONAL DRILL RIG MOBILIZATION: $2,500.00 / EA Gateway Business Park – Coppell, TX TAS Commercial Concrete Construction, L.L.C. Page 6 of 8 Exclusions: • All work not specifically shown as inclusions • Pumping of paving • Extra rebar for lifting/bracing of tilt-wall panels • Backfill of curbs • Haul-off of spoils • Light pole bases • Pipe bollards • Casting beds • Stacking of Tiltwall panels • Deadmen • Portable Concrete Washout Pits • Housekeeping/MEP pads • Bracing of walls for backfill • French drains (install, filter fabric, gravel fill) • Imported fill material • Masonry fill • Masonry reinforcing • Mass excavation and backfill • Protection of finished product • Rock excavation • Wage scale • HUB participation • Dirt work (sub-grade must be +/- 0.1 ft. balanced) • Sawcut, demo or haul-off of existing conditions • Street traffic control or barricades • Under or above ground obstructions • Concrete utilities or structures • Building corners • Joint sealing • Landscape/irrigation sleeves • Off-site work (decal or turn lanes) • Pavers • Removal of top strip in expansion joints or cleaning of the same • Trench drains • Temp. facilities (toilets, dumpsters, etc.) • Striping • Soil erosion protection • Slip form or vibratory screed machine placement method • Work outside of property lines • Flagpole footings • Routing or relocating existing utilities for our scope of work (i.e. overhead power lines) • Backfilling beyond 3 lf of retaining walls • Wet curing • Penetrating Spray-Applied Concrete Treatment (i.e. Spray-Lock, etc.) • Dowel baskets • Fence footings • Retention, support or shoring of any existing conditions • Supply of miscellaneous steel items (anchor bolts, pipe bollards, embedded plates, angles, etc.) • Casing of piers • Slurry drilling • Rock or core drilling • Concrete testing fees (including testing of concrete flatness tolerances) • Temperature control of concrete (i.e. ice, heat, etc.) • GC to provide portable fire extinguishers for every 3,000 sf of area • Permits • Insulating concrete • Engineering stamp • Coring of concrete • Correction of surface defects visible from a distance of 20’ or less including hand rubbing of panels and filling of air holes 1/4” or less • Coarse aggregate base labor and materials • Dewatering as a result of subsurface water • Removal or pumping of water required for the completion of work for other trades • Waterproofing • Termite treatment • Work hour restrictions • Final sweeping or cleaning • Dust or noise control • Epoxy-coated rebar • Expansion joint assemblies or covers • Fiber mesh • Hardeners or sealers • Wood fill for metal pan stairs • Metal chairs • MEP sleeves or blockouts of any kind • Patch, repair or replace concrete due to crane or other trades • Setting of guardrails or handrails • Temporary handrails per OSHA Standards at slabs-on-metal deck • Closure angles for slabs on metal deck • Shoring of metal deck • Slab tolerances greater than FF35/FL25 • Special finishes (i.e. sandblasting, staining, stamping, color, etc.) • Panel erection Gateway Business Park – Coppell, TX TAS Commercial Concrete Construction, L.L.C. Page 7 of 8 • Caulking/sealing of panel joints • Sample panels • Locating, cleaning or removing caps of lifting and bracing inserts • Panel braces, strong backs or erection hardware • Special panel finishes (Rubbing, cleaning, washing, sandblasting, chipping or preparation for other special finishes i.e.: paint) • Supply or install of pre-cast items • Grout fill or packing of hollow core planks • Installation or grouting of pre-cast embeds or connections • Layout of pre-cast members • Topping slabs • Pollution Liability Insurance • All concrete bond beams in CMU walls • Handling/Disposal of Hazardous or Contaminated Material/Soil • Rigid insulation Gateway Business Park – Coppell, TX TAS Commercial Concrete Construction, L.L.C. Page 8 of 8 Exhibit “B” – Contract Documents Drawings: BLDG 1 PERMIT SET – dated 02.12.21 BLDG 2 PERMIT SET – dated 02.12.21 Civil and Landscape Plans – dated 02.08.21 Specifications: Project Manual – 02.12.21, Outline Specifications – 02.2020, Geotechnical Report – 05.22.20 Addendum #1 2pgs (8-1/2” x 11”) dated 03.02.21 BLDG 1: A601, P001, E401 BLDG 2: A601, P001, E401 Addendum #2 Dated 03.08.2021 Building 1 HVAC Permit Set Building 2 HVAC Permit Set