CF-Coppell Rd SC-EM000808Coppell Service Center Project No. 99080.000 Date: August 08, 2000 CONSTRUCTION BUD(~ET ESTIMATE RECAP Site Work - 5.6 Acres (243,936 SF) Service Center (Main Building)- 15,904 SF Exterior Storage Out-Buildings - 21,450 SF S.F. COST $3.32 $66.29 $16.29 TOTAL $703,622 $916,702 $303,874 Construction Subtotal General Conditions @ 5% Subtotal $1,924,198 $96,210 $2,020,408 General Contractors Profit @ 5% Contigency @ 5% Total Estimated Construction Budget - Base Bid Additive Bid Item - Landscape & Irrigation - 69660 SF General Conditions @ 5% General Contractors Profit @ 5% Contigency @ 5% Subtotal $1.44 $101,020 $101,020 $2,222,449 $87,250 $4,363 $4,363 $4,363 $100,338 Total Estimated Construction Budget $2,322,786 REQUESTED ADDITIONAL CONSTRUCTION ITEM ALTERNATES 1 .Exterior unisex restroom - 100 SF 2.Southern landscape screen - 300 LF 3.North side solid screen wall - 3,000 SF 4.Building extedor brick veneer - 10,550 SF 5.Metal roof for Service Center - 15,904 SF Total Estimated Adds $86.25 $7,500 $19.17 $5,000 $11.50 $30,000 $9.20 $84,400 $5.76 $79,600 $206,500 *Square footage costs include f 5% mark-up for General Conditions, G.C. profit and contigency. ITotal Estimated Construction Budget Page 1 $2,629,286 CopDell Service Center Project No. 99080.000 Date: August 08, 2000 CONSTRUCTION BUDGET ESTIMATE SITEWORK 1. Site Preparation Acres 5.3 3,000.00 15,900 2. Asphalt Paving And Base Material SF 62,000 2.00 124,000 3. Concrete Paving And Base Material SF 71,500 4.00 286,000 4. Concrete Curbs And Gutters LF 3,950 10.00 39,500 6. Entry Sign 7. Perimeter Fencing (6' High Chainlink) 8. 5' Wide Concrete Sidewalks 9. 10' High Precast Concrete Screen Wall 10. Electric Entry Gates (Chainlink) 11. Trash Enclosure (8' Brick Wall) 12. Trash Enclosure (Wood Gate) 13. 4' Wide Personnel Gates 14. 3(7 High Flagpole And Base EA I 4,000.00 4,000 LF 890 15.00 13,350 SF 3,600 3.00 10,800 SF 3,300 9.00 29,700 PR 2 2,000.00 4,000 SF 560 8.00 4,480 PR I 500.00 500 EA 3 200.00 600 EA 1 2,000.00 2,000 16. 6'' Sanitary Sewer Main 17. 4" Water Main 18. 2" Water Service 19. 12" RCP Storm Sewer Main 20. Pdmary Electrical Site Distribution 21. Fire Hydrants 22. Relocate Fuel Storage Tank 23. Fuel Containment System 24. Gravel Base Material (Trash Area) 25. Decorative Entrance Wall (Brick) 26. Final Grading 27. 6" Concrete Filled Steel Bollards 28. 6" Gravel Flexible Paving If 485 45.00 21,825 LF 485 35.00 16,9'75 JOB 1 3,500.00 3,500 If 500 20.00 10,000 JOB 1 10,000.00 10,000 EA 2 1,500.00 3,000 EA 1 2,000,00 2,000 SF 1,200 10.00 12,000 CY 8 20.00 160 JOB 1 4,000.00 4,000 SY 28,652 1.00 25,652 EA 16 250.00 4,000 CY 384 20.00 7,680 Sitework Subtotal ,$7'03,622 Page 2 Coooell Service Center Project No. 99080.000 Date: August 08, 2000 CONSTRUCTION, BUDGET ESTIMATE LANDSCAPING AND IRRIGATION Landscaping And Irrigation Subtotal SERVICE CENTER ( MAIN BUILDING ) I $87,2S0 ,I 1. Building Pad Preparation 2. Select Fill And Moisture Barrier 3. Concrete Piers And Excavation 4. Foundation Grade Beams And Formwork 5. 5" Concrete Slab, Forms & Finish - Reinforced 6. 6" Concrete Slab, Forms & Finish - Reinforced 7. Mezzanine Metal Deck And Concrete Topping 8. Ext. Conc. Tilt Wall, Finish, Furring, Insulation- 12' High 9. Intedor Metal Stud Partitioning With Finish - 10' High 10. Interior Sound Insulation 11. Interior Concrete Masonry Walls - 10' High S F 15,920 2.00 31,840 CY 1,180 11.00 12,960 EA 36 750.00 27,000 LF 1,000 20.00 20,000 CY 158 110.00 17,380 CY 104 110.00 11,440 SF 1,178 4.00 4,712 SF 6,360 11.50 73,1 40 SF 9,740 3.50 34,090 SF 9,740 1 .iX:) 9,740 LF 1,140 12.00 13,680 13. Aluminum Windows, Sills And Sealant EA 22 500.00 11,000 14. Aluminum Storefront Doors And Hardware EA 12 1,200.00 14,400 15. Exterior Metal Doors And Hardware EA 6 500.00 3,000 16. Interior S.C. Wood Doors And Hardware EA 40 350.00 14,000 18. Water Heater, 100 Gallons EA 1 5,000.00 5,000 19. Suspended Ceiling System SF 8,150 3.00 24,450 20. Suspended Gypsum Board Ceiling System SF 2,150 2.00 4,300 21. Interior Cabinetry And Millwork LF 260 150.00 39,000 22. Steel Joist Roof Structure And Metal Deck LF 4,000 15.00 60,000 24. Roof Drainage System LF 586 15.00 8,790 25. Mezzanine Steel Floor Joists LF 400 7.00 2,800 26. t2' x 14' Overhead Doors - Electdc EA 6 2,500.00 15,000 Page 3 Coppell Service Center Project No. 99080.000 Date: August 08, 2000 Item CONSTRUCTION BUDGET ESTIMATE Quantity SERVICE CENTER ( MAIN BUILDING ) CONTINUED 27. CMU Screen Wall - Pierced Block 28. Metal Toilet Partitions 29. Fire Sprinkler System 30. Metal Lockers 31. Fire Extinguisher Cabinets 32. Marker Board And Projection Screen Cabinet 33. Dual EWC Unit 34. Mail Slot Center 35. Refrigerator And Dishwasher 36. Light Switches And Wiring 37. Electrical Outlets And Wiring 38. Telephone Jacks And Wiring 39. Telephone System zlO. Computer LAN System Wiring And Jacks 41. Light Fixtures And Wiring 42. Electrical Panels And Swirch Gear 43. Plumbing Fixtures 44. Fixture Controls 45. Plumbing Piping System 46. HVAC Supply And Return Registers 47. HVAC Duct Work 48. Mini-blinds zt9. Toilet Accessories 50. A/C Unit - 12 Tons 51. Mezzanine Steel Access Stair And Railing 52. Floor Drains 53. Trench Drains 54. Wash Bay Drain 55. Oil Separator 56. Metal Parts Bin Shelving 57. Miscellaneous Shelving 58. Service Bay Unit Heaters 59. Service Bay Exhaust System 60 Entrance Portico 61. Intedor Signage Rate S F 512 10.00 EA 6 500.00 JOB 1 47,760.00 EA 65 100.00 EA 7 150.00 JOB 1 1,000.00 EA 2 1,500.00 LF 14 100.00 JOB 1 1,500.00 EA 60 50.00 EA 192 50.00 EA 75 50.00 EA 1 20,000.00 JOB 1 300.00 EA 190 200.00 JOB 1 7,500.00 EA 25 1,000.00 E A 25 1 00.00 JOB 1 15,000.00 EA 70 100.00 JOB 1 10,990.00 SF 1,750 5.00 JOB 1 6,000.00 JOB 1 25,000.00 EA 1 2,000.00 EA 10 350.00 LF 48 65.00 EA 1 500.00 EA I 1,800.00 LF 72 25.00 LF 116 59.00 EA 6 750.00 EA 6 1,200.00 SF 768 20.00 EA 36 50.00 Total 5,120 3,000 47,760 6,500 1,050 1,000 3,000 1,zl00 1,500 3,000 9,600 3,750 7,500 2,500 15,000 7,000 8,750 6,000 25,000 2,000 3,500 3,120 1,800 1,800 5,800 4,500 7,200 15,360 1,800 Service Center Subtotal $916,702 Page 4 CODDell Service Center Project No. 99080.000 Date: August 08, 2000 CONSTRUCTION BUDGET ESTIMATE EXTERIOR STORAGE OUT-BUILDINGS Equipment Storaqe Buildinq 1. Building Pad Preparation 2. Select Fill And Moisture Barrier 3. Foundation Grade Beams And Formwork 4. 5" Concrete Slab, Forms And Finish - Reinforced 5. Rigid Frame Pre-engineered Steel Frame 6. Precast Concrete Tilt Walls (lo' High) 7.8" Concrete Masonry Walls 8. 10' High Wire Mesh Partitions 9. 10' Wide Gate 10. 8' x 10' Overhead Doors (Manual) 11. Roof Insulation With Mesh Retainer 12. A/C System -4 Tons Rate Chemical Storaqe Buildinq 1. Building Pad Preparation 2. Select Fill And Moisture Barrier 3. Foundation Grade Beams And Formwork 4. 5'' Concrete Slab, Forms And Finish - Reinforced 5. Rigid Frame Prs-engineered Steel Frame 6.8" Concrete Masonry Walls 7. 8' x 10' Overhead Doors (Manual) 8. Floor Drains 9. Chemical Recapture SF 9,500 2.00 CY 700 11.00 LF 390 20.00 CY 146 110.00 SF 9,500 3.00 SF 2,400 9.00 SF 2,100 8.00 LF 220 40.00 EA 3 1,000.00 EA 2 2,000.QO SF 3,000 1.00 JOB 1 4,000.00 Vehicle Storaqe Buildinq 1. Building Pad Preparation 2. Select Fill And Moisture Barrier 3. Drilled Piers 4. 6" Concrete Slab, Forms And Finish - Reinforced 5. Rigid Frame Pre-engineered Steel Frame 6. 1(~ High Wire Mesh Partitions 7. 10. Wide Gate 8.6" Concrete Filled Steel Bollards SF 1,200 2.00 CY 89 11.00 LF 160 20.00 CY 15 110.00 SF 1,200 3.00 SF 1,600 8.00 EA 3 2,000.00 EA 3 350.00 EA 1 1,500.00 SF 11,000 2.00 CY 815 11.00 EA 18 750.00 CY 204 t 10.00 SF 11,000 3.00 LF 480 40.00 EA 8 1,000.00 EA 12 250.00 Total 19,000 7,700 7,800 16,060 28,500 21,600 16,800 8,800 3,000 4,000 3,000 4,000 2,400 979 3,200 1,980 3,600 12,800 6,000 1,050 1,500 22,000 8,965 13,500 22,440 33,000 19,200 8,000 3,000 Exterior Storage Out-Buildings Subtotal $303,874 Page 5 Coppell Service Center Project No. 99080.000 Date: July 20,2000 CONSTRUCTION BUDGET ESTIMATE RECAP Site Work Landscape & Irrigation Service Center (Main Building) Exterior Storage Out-Buildings $738,742 $87,25O $1,030,422 $303,874 Construction Subtotal General Conditions @ 5% Subtotal $2,160,288 $108,014 $2,268,302 General Contractors Profit @ 5% Contigency @ 5% Total Estimated Construction Budget $113,415 $113,415 I $='4es, t3a I REDUCTION ITEMS - ( ADDITIVE BID ) ACTION I TOTAL 1. Change concrete pavement to asphalt NO $164,450.00 2. Provide curb and gutter at front of building NO $22,425.00 4. Delete flagpole NO $2,300.00 8. Reuse existing telephone system 9. Delete 2 vehicle storage bays NO $23,OOO.OO NO $29,924.00 Total Estimated Budget Reduction I $~,~,847 , I ITotal Estimated Construction Budget I $1,953,286 I Page 1