Loading...
PA9702-LR000117REPORT OF STRUCT /"rRAL STEEL INSP C i,. N E T a division of'l~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 01/11/2000 Report No.: 0001755 Report Date 01/17/2000 Client No.: COPPELL ProjectNo.: 94991118 Client: City of Coppell Project: CoppellAquatic/RecreationCtr Attn: Brad Reid 300 Block of parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Structural steel inspection. On this date, an HBC Engineering representative arrived at the above referenced jobsite as scheduled for structural steel inspection. A visual inspection was conducted on the Roof Level Framing as noted below. Roof Level, metal deck installation between lines A to B and 1 to 4 and also between lines B to D and 1 to 2, puddle welds and side lap screws were determined to be compliant. Technician: Randy Walcker I"BC ~'~ring, Inc. Report Distribution: (1) City of CoppeH (1) City ofCoppell - Engineering (1) BrinkIcy Sargent Architects (1) City ofCoppcll - Bldg. Insp. Paul D. Smith, P.E. (1) Turner Engineers (I) City of Coppell - Leisure Serv Dept Senior Project Engineer (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in thl] without the written approval of HBC Engineering, Inc. 99SDS Page I of l