Loading...
CF-Coppell Rd SC-PR 991221FRO~ : UID~UD+~SSOC. FAX NO. : 9?24582323 Dec. 21 1999 06:57PM P1 v~daud + associates incorporated 13649 monffort drive · suite 200 dallas · texas 75240 (972) 934-8888 PH · (972) 458-2323 FX architecture . engineering o interiors To: From: Datm Brad Reid, Coppe]l Leisure Services Department; 972-304-3547 Ken Crosby: VA~ Coppell Service Center December 21, 1999 P~ge$: 11. including this cover sheet. FACSIMILE COMMENTS: Brad: Here is our fee proposa! and revised Scope of Work for the Service Center, as we discussed. Ill be back m the office on Monday, 12J27/99, and then out until the end of [he month. If we need to get toge,'her before 1/3/99, please call me at home (972-393-3994). I'll be in and out. but will break away to meet you. We want to get started on this and the Senior Center as soon as we can. Kenn~~%s by, AIA Prfncip~/Arcill~,,~ File · Page 1 FPON ' UIDQUD*~SSOC. FAN HO, ; 9724582525 Dec. 21 1999 06:57PM P2 December 21, 1999 vel Brad Reid City of Coppell: Leisure Services Department 732 Deforest Road P.O. Box 478 CoppelJ, Texas 75019 RE: AlE Fee Proposal & Scope of Work for Field Service Offices & Facilities City of Coppell, Texas Dear Brad; We are pleased to submit the following fee prcposa[ for your consideration. Our fees are based on the a~ached Scope of Work dated December 20. 1999, and a totai project budget of S1.500,000. As previously discussed, we estimate the construction budget to breakdown as follows- · Sitework (3-acres): · Service Center Building: · Storage Buildings: Miscellaneous Site Improvements: Total Estimated Construction Cos,': 675,000 450,000 100,000 ?5,000 $1,300,000 VAI wil~ provide the Basic Services required to complete this work for the following firm, fixed price amount, plus reimbursable expenses. · Pre-design: $ 10,000 · Preliminary Design: $ 25,000 · Design Development: $ 40,000 o Construction Documents: $ 75,_000 Total for Basic Services: $150.000 We estimate reimbursable expenses to be an additional $15,000. including topographic survey, boundary survey, platting, reproduction, travel and miscellaneous expenses. We also understand that Bidding & Negotiation phase services and Construction Administration are not included Jn the Basic Services, but may be added as an additional service to be invoiced hourly. Based on the description of services in the Scope of Work, we estimate these services to be approximately; ,, Bidding & Negotiation: · Constructon Administration: $10,000 $25,000 Please review this information and let us know how we are to I:roceed. We will be happy to discuss the proposal, as soon as you've had a chance to review ,t. If you have any questions, please call Russell Himes, our Chief Financial Officer, or me at 97593,4-8888 We are excited about this opportunity and look fo,ward to your favorable response. Kennbth M.'Crosby. ~,tA ~ P.rincipal/Architect t. ~'~ Vfdaud -~ AssociateSHn¢orporated ~ v~dau¢ ~ assoc:ates Incorpora~ed - architecture * er;gineerm9 ' ',Pier:ors ' 3649 momltor~ Or,va - ~tJ~te 200 - d~ltes, t~as - 75240.4503 * telephone (972) g34-B888 FROM ; UIDAUD+A559C, FAX NO. : ~724582525 Dec. 21 1999 06:58PM P3 CITY OF COPPELL FIELD SERVICE OFFICES & FACILITIES SCOPE OF WORK AlE Scope of Work: The Architect/Engineer shall enter into a contractual agreement with the City of Coppell to provide basic professional services for the site layout, design and construction documents for a new Field Service Office and Facilities. Project Description: The City of Coppell intends to construct a new 10,000 SF Field Operation Office and related facilities on approximately three (3) acres of an overall 47-acre site located at Coppell and Bethel Roads. The primary facility shall consist of: · Office Space for Public Works and Leisure Services Departments - 5,000 SF · Two (2) Vehicle Service Bays - 4,400 SF · Vehicle Wash Bay- 600 SF Related on-site facilities are to include: Outdoor Covered Equipment and Parts Storage - 3,000 SF · New explosion-proof, Chemical Storage Building. · Concrete Parking areas for visitors, staff and City vehicles and equipment - asphalt paving may be considered for storage areas to reduce cost. · Chain-link fencing around perimeter of site. The facility shall be designed using concrete tilt-wall construction to meet applicable City zoning codes, The proposed location for the new Service Center is currently zoned Industrial. Limited landscaping and irrigation is to be included in the design. The structural system for the office building is to be designed to accommodate a future second story addition. Pre-engineered building designs are not permitted. The design shall provide for future expansion of the office building and related facilities, including: · Additional Administrative Office Space- 27,000 SF · Sign & Signal Shop- 3,000 SF · Additional Covered Equipment & Parts Storage - 7,000 SF · Additional paved parking areas · Exterior masonry veneer for Service Facility · Upgraded fencing around perimeter of site. Project Budget: The City's total project budget for the building and related site improvements is $1.5 million. The A/E will be required to design the project within the project budget~ The City anticipates that the overall scope of the project may be modified or adjusted, in order to bring the project design within the budget, Modifications to the project scope will be reviewed with the City for approval. 12/21/99 Page 1 of 9 FROM U I DAUD+ASSOC, C1'~¢ OF COPPELL FrELD SERVICE OFFICES & FACIUTIES FRM N0, ; ~724582323 D~c. 21 1999 0G:58PM P4 SCOPE OF WORK Design Phases: The project will be broken into the following design phases: · Pre-design Phase · Preliminary Design Phase · Design Development Phase · Construction Documents Phase: · 50% Midpoint Submittal · 100% Final Submittal Each phase will be submitted for review and approval by the City before the NE proceeds to the next design phase. Information to be provided by the City: The City of Coppell will provide the following information to the AJE for use during design: · Archeological and Environmental Impact Findings. · Existing Tree Survey (previously provided) · Geotechnical Survey & Report, including pavement section and foundation design recommendations; transmitted to the A/E no later than the beginning of the Design Development Phase. · Boundary Survey & Platting information as outlined below. Design Submittal Requirements: The following items outline the work performed by the AlE for each phase of the project: 1. Pre-design Phase: · Kick-off Meeting - The NE will conduct a Kick-off Meeting with the City to review the project scope and design schedule. At this meeting, the AlE will schedule initial meetings with the Parks & Leisure Services and Public Works - Utilities, Fleet and Streets departments. · Plan Review - The NE will review available plans and documents, including existing plans of the new site, plans of the existing Service Facility and the City's space requirements/criteria. · Code Analysis - The NE will conduct Code & Zoning Analysis, and meet with the following City code officials to gather special design requirements: · Planning- Gary Sieb Building Inspection: · Chief Building Official- Greg Jones · Fire Marshall-Travis Krump · Environmental- Perri Kitties · Site Inventory - The A/E wil~ conduct a site inventory, including: · Topographic Survey of the three (3) acre site: 12/21/9~ Page 2 of 9 CITY OF COPPFLL FIELD SERVICE OFFICES & FACILITIES SCOPE OF WORK · Field tieing visible points required for final design. visible improvements. Locate existing above ground utilities. Visual validation of the existing Tree Survey. Photograph the site & surrounding context. Programming - Field tie above ground The AJE will tour the existing Coppell Service Center and meet with the individual Department Managers to review the User's 'Wishlist" for the building, identify special needs, discuss spatial relationships, identify existing equipment and furnishings to relocate to the new building. The building and its contents are available for photographing the existing conditions. The AJE will prepare Programming Data, including spatial data for departments, room sizes, equipment/materials and functional relationship diagrams. The AJE will arrange a meeting with the following Municipalities, in order for the City of Coppell to tour other Service Centers that have been recently completed. Addison Carrollton Watauga 2. Preliminary Design: · The NE is to prepare and submit five (5) complete sets of the following items for the City's review: · Preliminary Design Drawings: · Topographic Survey - indicating ground surface contours at one (1) foot intervals, supplemented by appropriate spot elevations accurate to 0.1 foot elevation in areas where the new facility is proposed. · Preliminary Site Plan, indicating proposed location of the Service Center building, landscaped areas, vehicular and pedestrian circulation, parking, outdoor storage areas, perimeter fencing and other related facilities. · Preliminary Floor Plans of Service Center building, indicating entries, office layouts, circulation and service areas. · Exterior Building Elevations, including outdoor storage structures · Design Narrative- brief outline of proposed design, including building materials and engineering systems. · Preliminary Color/Sample Board: · Identifying proposed materials and colors for the exterior and intedor of the Service Center. · Preliminary Cost Estimate · The NE shall meet with the City to review design comments, and to incorporate applicable comments into the design. · After review, the A/E will present the Preliminary Design to the City Council in a Work Session Format. No other public hearings or presentations are required for this phase. · The City's approval of the Preliminary Design is required prior to beginning the Design Development Phase. 12/21/99 Page 3 of 9 FROM CITY OF COPF'ELL FIELD SERVICE OFFICE.~ & FACILITIES F~× ~0, ' ~72~5~2323 Dec. 2i i999 06:59P~ P6 SCOPE OF WORK 3. Design Development: The NE is to prepare and submit five (5) complete sets of the following items for the City's review: Design Drawings including: · Civil: · Boundary Survey (1 "-- 50' scale): · The survey will be performed in accordance with the Manual of Practice for Land Surveying in Texas for a Category lA, Condition II survey, and will incorporate a boundary survey certificate. · Record research is to be provided by the City of Coppell. If additional research is required to facilitate the boundary survey, this work will be performed on a cost plus basis as additional services. · The City is to provide the NE with an updated title commitment, including all schedules and exceptions, no later than 10 working days before the proposed delivery date, in order to meet the project schedule. Names of the entities to be certified, including the buyer, seller, lender, title company, etc., is required five (5) working days before the proposed delivery date. · Preliminary Grading Plan - indicating the elevation of the building and pavement areas, and drainage requirements. · Landscape: Planting Plan - showing quantity, species, sizes and spacing of plantings. · Architectural: · Final Site Plan - including Service Center building, landscaped areas, vehicular and pedestrian circulation, parking, outdoor storage areas, perimeter fencing and other related facilities. · Final Building Plans & Elevations · Preliminary Building & Wall Sections, if needed to convey design concept. · Final Color/Sample Board - one (1) board. · Initial Development of Engineering Systems, including civil, structural, mechanical, electrical and plumbing. · Copies of Proposed Equipment & Product "Cut-sheets" · Outline Specifications · Detailed Cost Estimate The NE is to submit documents for Building Inspection and Code review by the City. The NE shall meet with the City to review design comments, and to incorporate applicable comments into the design. Presentations - After review, the NE will present the design to the City's Planning and Zoning Board for .~ite plan review. No other public hearings or preeentations are required. The City's approval of the Design Development documents is required prior to beginning the Construction Document Phase. 12~/99 Page 4 of 9 FRGM ; 9IDRUD+RSSDC. FAX NO, : 9724582J2J Dec. 21 1999 O?:00PM P? CITY OF COPPELL FIELD SERVICE OFFICES & FACILITIES SCOPE OFWORK 4. Construction Documents: 50% Mid-point Submittal: · The A/E is to submit five (5) sets of construction documents to the City to review the AJE's progress on the construction documents. The submittal includes; · Construction Drawings: · Civil: · Final Grading Plan - including existing and proposed ground contour lines, and spot elevations needed to grade the site for drainage. · Site-Drainage Design - including improvements to allow for proper storm water drainage of the site, such as proposed inlets, storm sewers, flumes, swales, headwalls and other drainage features limited to a point five (5) feet outside the building lines. · Overall Drainage Area Map- delineating drainage areas and storm sewer runoff data for the site and adjacent properties that may affect drainage of this site. · Water & Sanitary Sewer Plan - coordinating the location and layout of water and sanitary sewer services to serve the proposed facility, to a point five (5) feet outside the building line. Fire protection facilities, such as freestanding hydrants and water supply lines beyond the five (5) · Dimension Control - building corners and pavement curb lines, and preparation of paving details. · Erosion Control Plan - design drawings and associated details only. SWP3 plan, including but not limited to the Notice of Intent (NOI). project description, inspection forms, Notice of Termination (NOT), etc. are not included, and shall be prepared by the Contractor. Landscape: · Planting Plan - planting and arrangement of plant materials and harms. Quantity, species, sizes and spacing of materials will be specified on each plan sheet. Fine grading of landscaped areas and area drain design for planting areas where required. · Irrigation Plan - zoned system to maximize efficient water management. The system will be designed to permit separate watering of turfgrass. Details for the proper installation of sprinkler heads, valves, pipe, service connection, controller and other items will be indicated. Architectural: · Overall site plan · Floor plans & enlarged partial plans · Roof plan & details · Exterior elevations & details · Building & wall sections · Reflective ceiling plan · Intedor elevations & details 12/21199 Page 5 of 9 FROM U ! DAUD+ASSOCi, CITY OF COPPELL FIELD SERVICE OFFICES & FACILITIES F~× NO. ; ~724582323 Dec. 2~ ~999 07:00PM P8 SCOPE OF WORK · Door, window & finish schedules & details Millwork details Exterior & interior signage Miscellaneous details · Structural: · Foundation Plans & Details, including pre-packaged above ground tanks. · Roof Plans & Framing Details. · Mezzanine & miscellaneous details. Tilt-wall details, not including panel layout or detailing. · Overhead crane. · Mechanical: · Diagrammatic duct layout. · Diffuser and grille locations. · Mechanical equipment locations, showing layout for mechanical space and equipment schedules. · Mechanical details. Relocation of existing equipment, including compressed air system, oil dispensing systems, etc. · Electrical: · Coordination for utility service with electrical and telephone utility companies. · Electrical service & distribution. · Lighting design - extedor & interior, including connection, circuiting and switching. - Emergency Power distribution. · Fire Alarm Systems. · Panel, switchboard and lighting schedules. · Connection of mechanical equipment. · Electrical details. · Plumbing: · Diagrammatic piping layouts. · Plumbing details. · Conceptual fire protection/sprinkler system. · Specifications: · The NE is to obtain and review Divisions 0-1 from the Contracting Officer (Jim Ragsdill) · The NE is to edit and provide technical Divisions 2-16. , Final Cost Estimate: · The NE is to submit the Construction Documents for review of ADA Compliance with the required governing agencies. · The A/E shall meet with the City to review design comments, and to incorporate applicable comments into the design. 100% Final Submittal: · The AJE is to submit the following documents 100% complete, and in the quantities indicated, to the City of Coppetl for bidding: 12/21/99 Page 6 of 9 FROM : UIDAUD+ASSOC. FAX NO. ; 9724582323 Dec. 21 lggg D?=DlPM P9 CITy OF COPPELL FIELD SERVICE OFFICES & FACILITIES SCOPE OF WORK Construction Drawings: · One (1) copy of electronic files on CD · One (1) full size set of reproducible originals · Five (5) sets of full size prints · Specifications: · One (1) complete unbound set of original specifications, including Divisions 0-16. · Five (5) complete bound sets · Final Cost Estimate: · Three (3) bound sets Final Platting (1" = 50' scale): · The NE will submit the final plat for the proposed three (3) acre site to the City of Coppell for approval. · Record research is to be provided by the City of Coppeil. If additional research is required to facilitate the boundary survey, this work will be performed as an additional service. · The City is to provide the NE with an updated title commitment, including all schedules and exceptions, no later than five (5) working days before the proposed delivery date, in order to meet the project schedule. Names of the entities to be certified, including the buyer, seller, lender, title company, etc., are also required. · The NE is to have final platting completed by the time the Construction Contractor has the sitework completed. Additional Services: The following items are not part of the NE's basic services and are considered additional services. These services may be provided on an hourly basis at the request of the City of Coppell. If required, these services will be added by modification to the basic agreement: Design Phase Services: · General: Design Modifications after approval of Design Development. · Revisions to Construction Documents following substantial completion, which are not due to design errors or omissions. · Relocation, adjustment and/or demolition of existing improvements or infrastructure. · Civil: · Design Calculations. · Retaining wall design. · Geotechnical consulting. · Off-site utility or drainage facility extensions which may be required to serve the property. · Flood plain studies or reclamation plans, detention design or studies, · Traffic engineering reports or studies, · Environmentat impact statements and assessments. · Landscape: · Fountain or ornamental water feature design, 12/21/99 Page ? ot: 9 FROM : UIDAUD+ASSOC. FAX N~. : 9724582~ DEc. ~1 1999 O?:OiPM CITY OF COPPELL FIELD SERVICE OFFICEs & FACILITIES SCOPE OF WORK · Tree surveys or mitigation plans. · Pump design for irrigation systems · Architectural: · Masterplanning entire 47 acre site. · 3-D CAD or Architectural Renderings · Architectural Building/Site Model · Interior Design, including space planning of furnishings and systems furniture. · Structural: · Design Calculations · Structural planter design. · Mechanical, Electrical or Plumbing: · Design Calculations. · Smoke evacuation systems. a Gas, telephone, and cable design, Bidding & Negotiation Phase Services: Distribution of Bid Sets · Answering Bidder's Questions · Distributing Addenda · Conducting Pm-Bid Meeting · Distributing Addenda · Attending Bid Opening · Evaluating Bids & Check References; including Dun & Bradstreet Construction Administration Phase Services: · City intends to hire in-house Construction Manager for on-site review during construction, however, the AJE may be asked to provide: A representative at the Pre-construction Meeting · Submittal Review · A representative at the Bi-weekly Construction Meetings Only the A/E's Project Manager will be required. Additional technical support will be provided as necessary. Record Drawings prepared from the redline markups prepared by the Contractor. Reimbursable Expenses: Reproduction, travel and other miscellaneous items are not part of the A/E's basic services, and shall be considered reimbursable expenses. These expenses will be invoiced at 1.15 times the A/E's actual cost. The will provide receipts, or other supporting documentation for individual expenses over $100, at the City's request. Reimbursable expenses include, but are not limited to: · Copying & reproduction directly related to the project. · Materials for color/sample boards, etc. · Travel expenses, including mileage, parking, rental cars, airfare, per diem for out of town travel, and hotels requiring overnight travel. · Photography. · Postage, mailings or courier costs. · Long distance phone calls, 12.f21/99 Page 8 of 9 F~OM ; UIDAUD+ASSOC. FAX NO. ; 972~582323 D~o. 21 iggg 07:02PM Pl! CITY OI~ COPPELL FIELD SERVICE OFFICES & FACILITIES SCOPE OF WORK · Computer media. · Filing and permit fees. Submittal Schedule: The following is a schedule for the A/E's delivery of documents to the City of Coppell. The schedule is in calendar days after approval and receipt of the Notice to Proceed for each phase: · Pre-design: 14 days · Preliminary Design; 14 days · Design Development: 24 days · Construction Documents: · 50% Mid-point Submittal: 30 days · 100% Final Submittal: 26 days Computer Programs/Format Requirements: The AJE will provide drawings, specifications and costs estimates in the following computer programs and formats: · Drawings - AutoCAD v.14 with VAI layering standards, which are based on the AIA Drawing Layer Standards. · Specifications - AIA Masterspec in CSl Format produced on MS Word: · Cost Estimates - MS Excel spreadsheet using CSI format, identifying unit quantities, labor, material, contractor overhead and profit. END OF ITEMS Page 9 of 9