Town Center L4B1-LR011212ALPHA TESTING, INC.
2209 Wisconsin St., Suite 10
Dallas, Texas 75229
(972) 620-8911
Concrete Compression Test
Report
Tested For: CONSTRUCTION MANAGEMENT GROUP
ATTN: MR. JEFF MILLER
5207 MCKINNEY AVENUE, SUITE 12
DALLAS, TX 75205
Project D~_~OPPELL TOWN CENTER AD~I~ ~
Our Report No.: 01612-39
Issue Date: 12/12/2001
FIELD DA TA
Placement Location: SEE NOTES
Date Placed: 11/9/01
Time Placed: 10:07 AM
Slump (ASTM C-143): 3.75
Air Content: 5.25 (ASTM C-173)
Air Temperature: 51
Specimen Temperature: 70
Date Received: 11/10/01
Delivery Method: PICKED UP BY ALPHA
Field Date Submitted By: TIMMONS, SCOTT
Mix Date Submitted By: BEALL
Plant Number: 88-4000
Delivery Ticket No.: 88003897
Made By: ALPHA
Cured Specification: ASTM C-31
CYLINDER COMPRESSION TEST RESUL TS
Notes:
CC:
Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max
No.: Type: Spec: Tested: (Days): Length Width Diameter Sq. In. Load: PSI:
64 LAB C-1231 11/16101 7 12 N/A 6 28.27 139120 4920
66 LAB C-1231 12/7101 28 12 N/A 6 28.27 18248(~
67 LAB HOLD HOLD 12 N/A 6 28.27 0
Specifications: 28 3600
PASS
Results to Date:
DECELERATION LANE ON DENTON TOP RD., 150'E & 25'N FROM THE SE CORNER OF THE BUILDING.
HIS, CITY OF COPPELL, CONSTRUCTION MANAGEMENT GROUP
Our test dudve
wl~ express approval of ALPHA. The use of our name atd test results must receive our wdtten approval Test results and reports apply only to the samples tested and/or
observed, and are not Indicative of ~e qualifies of apparently Identical or dmllar spedmens.