Loading...
DR0002-CS011221T H E C: I T Y 0 F ? ~. December 21, 2001 Randy Brown 149 Meadowcreek Road Coppell, Texas 75240-6303 RE: Meadowcreek Drainage Project #DR 00-02 Dear Mr. Brown: This letter is being written to update you on the stares of the referenced project. The Meadowcreek Drainage project was approved for construction by City Council on December 11, 2001. The contractor R-Con, Inc. has returned the executed contracts and is preparing to begin construction. However, the contractor has notified us that the pipe necessary for the construction cannot be delivered until February (see attached letter). A preconstmction meeting has been scheduled for the end of January so work can begin as soon as the pipe arrives. If you should have any questions or need any additional information please feel free to contact to me at 972/304-3686. Sincerely, Director of Engineering/Public Works 255 PARKWAY 'Jif P O BOX 478 '/Ir COPPE:LL TX 75019 'J' TEL 972/462 0022 ,Jif FAX 972/304 :3673 December 21,2001 George Dixon 153 Meadowcreek Road Coppell, Texas 75240-6303 RE: Meadowcreek Drainage Project #DR 00-02 Dear Mr. Dixon: This letter is being written to update you on the status of the referenced project. The Meadowcreek Drainage project was approved for construction by City Council on December 11, 2001. The contractor R-Con, Inc. has remmed the executed contracts and is preparing to begin construction. However, the contractor has notified us that the pipe necessary for the construction cannot be delivered until February (see attached letter). A preconstmction meeting has been scheduled for the end of January so work can begin as soon as the pipe arrives. If you should have any questions or need any additional information please feel fi'ee to contact to me at 972/304-3686. Sincerely, KennethM. Gri , . . Director of Engineering/Public Works ;'55 PARKWAY ~ P.O.BOX 478 'k COPPELL TX 75019 ~ TEL 97::)/462 00~'2 1~' FAX 972./304 3673 Excavation · Utilities · Paving December 19, 2001 City Of Coppell Mr. Garreth Cambell 255 Parkway Coppell, TX. 75019 RE: Meadow Creek Drainage Project DR 00-02 Dear Mr. Cambell, We have executed the contracts on the above referenced project and are ready to get started. However, Hanson pipe can not deliver the boxes until February 4, 2002. We would like to schedule a pre-construction meeting the week of January 21, 2002 so we can go to work a soon as the boxes arrive. If you have any questions please fell free to call Darrell Nichols or myself at 972-313- 1811. 3321 W. Pioneer Drive, Irving, Texas 75061 · Office (972) 313-1811 · Fax (972) 313-1372