Loading...
ST0001-CS011206 (2)12/06/2001 14:13 817649764§ SCHRICKEL ROLLINS PAGE Bi uec O~; Ul 08:2~a Infrastructure Services 972-303-80B4 Post*ItTM brand tax transmittal memo 7671 I co. ppct/ co. $chricke], Rollins and Associates, Inc. December 6, 2001 Corporate Drive West, Ste. 200 Arlington, TX 76006 Attn: Chris $chni~Ber, P.E. Dar Mr. Schnitger, in addition lo the price on the Change Order I. sent you, l.S.l, is requesdn8 one month additional time to complele the additional work. Thank you for your help in regards to the above, and please do not hesitate to contac{ Infi'asm~cmre Sr, rvices, In(:. at (972) 240-8064 if further information should b~ required. Sincerely, Philip Bennett Replace all damaged irrigation at entrance to Wagon 514 ILS y~l~eel P,~, all work fully .p~rrr~, for t.~ lump sum of -r.-~ -- ' 6r dollars and - cents. $].,060.00 $ ].,060,00 ll ' TOTAL IRRIGATION IMPROVEMENTS ~ LIGHTING IMPROVEMENTS 601 -'~ .3 C,¥ ~L.~! pole foun~l?tion, complete a~ in place, for the sum of i [ E_A ~~. ~c,~.,,t.~ ~ dollars and '~ 0 ~ ~ - cents per linear foot. $5.50.00 $ 6,0_50.00 602 4.755 LF 2" Schedule 40 PVC conduit including embedment and ba~_~omplete and in p, lace, for the sum of dollars and ~~.~ ~/. cents per linear foot. $6.36 $ 30,241.80 603 9 EA ,,~ngle arm..J~u~inair, complete ~,.[~d in_olace, for~the sufn of /~/' ~  _.~-~_A °dollars and ccp. tS..l:~,~each.$Z,850.00 $?_.5,650.00 //,) dollars and Cc")(::) ,cents per each. $ 3,500.00 $ 7,000.00 TOTAL LIGHTING IMPROVEMENTS $ 68,94 ].. 80 BID SUMMARY PAVING AND MISCELLANEOUS ~ ~''-/'~ DRAINAGE IMPROVEMENTS ~e.~2 WATER IMPROVEMENTS ~ !4~ .~ SANITARY SEWER IMPROVEMENTS $ 33 IRRIGATION IMPROVEMENTS ~ '' LIGHTING IMPROVEMENTS $ 68,94 G~ND TOTAL W' ~1~ I - 31 Bid Schedule 412~