Loading...
Old Town Phase 3- PT221221Page 1 of 3CONS22-10-026044 CONSTRUCTION DEVELOPMENT PERMIT Name of Applicant Date SubmittedWilliam Peck 10/14/2022 Address of Applicant 105 W Main ST, Lewisville, TX 75057 Phone Number Email214-707-0304 bill@peckarchitects.com Project Name Description 767 W Main St - Old Town Mixed Use (Old Town Addition, Lot 4R, Block D) Location of Construction 767 WEST MAIN ST, Coppell, Subdivision AcreageOld Town 0 Section Block LotD 4R Location Description located in old town development on the last lot on the west main side. 1. Type of proposed construction or development: Non-Residential 2. Description of Construction Permit requested: : Parking Lot, Paving, Sanitary Sewer Main, Sidewalk Provide an attachment containing the name and 24-hr. contact phone number of supervisor(s) for every contractor working under this general permit. 3. All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance. Amount Due: $1,940.60 Date Paid: 12/19/2022 > Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department @ 972-304-3600 Fire Department @ 972-304-3512 Street Department @ 972-462-5150 Engineering Dept. @ 972-304-3679 NOTE: Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY unless otherwise approved by City Engineer. > Provide barricade plan / trench safety plan of a lane or street closure. (Required) > It is a requirement of this permit that As-Built Drawings be turned in at the end of this project. As-Builts consist of a .pdf and CD with Autocad .dwg files. Printing your name indicates your acceptance of the terms and conditions of this form: Page 2 of 3CONS22-10-026044 William Peck Signature of Applicant Contact Number 214-707-0304 Signature of Inspector Contact Number NoIs the fill area located in an identified flood hazard area? FOR CITY USE ONLY If YES, a Floodplan Development Permit is required before any construction can begin. Has a Floodplain Development Permit been issued?No City Approval Date 12/21/2022 Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. Page 3 of 3CONS22-10-026044 INSPECTION FEE CALCULATION SHEET Project Name Date 12/21/2022 As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and inspected by the Engineering Department and dedicated to the City. The Developer shall pay 3% of the items to be inspected by the Engineering Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees are due on or before the date of the Pre-construction Meeting. The fees shown below have been calculated based on the development contract or cost estimate provided by the developer. Paving Grading Water Sanitary Sewer Storm Sewer Alleys Sidewalks Other PUBLIC IMPROVEMENTS CONTRACT AMOUNT $0.00 $0.00 $3,774.00 $0.00 $0.00 $0.00 $7,706.51 $0.00 X 4% = $0.00 $0.00 $150.96 $0.00 $0.00 $0.00 $308.26 $0.00 $17,550.00 $0.00 $22,186.00 $1,500.00 $0.00 $0.00 $8,143.49 $0.00 X 3% = $526.50 $0.00 $665.58 $45.00 $0.00 $0.00 $244.30 $0.00 Total $11,480.51 $459.22 $49,379.49 $1,481.38 PRIVATE IMPROVEMENTS CONTRACT AMOUNT Grand Total (total of both colored fields)$1,940.61