Loading...
Freeport NIP(7.5)-LR010822 GEOTECHNICALAND J ~ J~J O I I F~ ENVIRONHENTAL CONSULTANTS I CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 138 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7888 Dallas, Texas 75240 SAMPLE DATE: 08-22-01 ATTN: Mr. Jeff Langston TECHNICIAN: A. Chairez CONTRACTOR: Butler Construction Location of Sample Set Number I Location I Quantity Represented 1 Paving: 150'S, 340'W of S.W. building corner 40/780 2 Paving: 165'S, 300'W of S.W. building corner 130/780 3 Paving: 155'S, 250'W of S.W. building corner 230/780 4 Paving: 150'S, 200'W of S.W. building corner 320/780 5 Paving: 160'S, 150'W of S.W. building corner 450/780 6 Paving: 165'S, IO0'W of S.W. building corner 520/780 7 Paving: 130'S, 75'W of S.W. building corner 640/780 8 Paving: 125'S, 15'W of S.W. building corner 760/780 Design Information l Source of Concrete I Mix Identification I Specified Strength p.s.i. Potter 7752 4000 Test Results Set Cy, inderI Age@ Total Load I CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 2303 08-29-01 7 102090 3610 2303 09-19-01 28 2303 09-19-01 28 2303 Hold H 2 2304 08-29-01 7 124450 4400 2304 09-19-01 28 2304 09-19-01 28 2304 Hold H 3 2305 08-29-01 7 119330 4220 2305 09-19-01 28 2305 09-19-01 28 2305 Hold H 4 2306 08-29-01 7 106980 3790 2306 09-19-01 28 2306 09-19-01 28 2306 Hold H 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 FlEE:I:] I E I--1E~ I I--1E E F;ilI--1E~i GEOTECHNICALAND J~ J~ I'--I I I F~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 138 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7888 Dallas, Texas 75240 SAMPLE DATE: 08-22-01 ATTN: Mr. Jeff Langston TECHNICIAN: A. Chairez CONTRACTOR: Butler Construction Location of Sample Set Number J Location J Quantity Represented 1 Paving: 150'S, 340'W of S.W. building corner 40/780 2 Paving: 165'S, 300'W of S.W. building corner 130/780 3 Paving: 155'S, 250'W of S.W. building corner 230/780 4 Paving: 150'S, 200'W of S.W. building corner 320/780 5 Paving: 160'S, 150'W of S.W. building corner 450/780 6 Paving: 165'S, 100'W of S.W. building corner 5201780 7 Paving: 130'S, 75'W of S.W. building corner 640/780 8 Paving: 125'S, 15'W of S.W. building corner 760/780 Design Information IS°urce °f C°ncrete IPotter Mix Identification 7752 I Specified Strength P's'i' I 4000 Test Results Set Cylinder Age (~ Total Load J Compressive Average No. ID Date Tested Test lbs. J Strength p.s.i.Strength p.s.i. 1 2303 08-29-01 7 102090 3610 2303 09-19-01 28 122360 4330 2303 09-19-01 28 121290 4290 4310 2303 Hold H 2 2304 08-29-01 7 124450 4400 2304 09-19-01 28 137710 4870 2304 09-19-01 28 144110 5100 5990 2304 Hold H 3 2305 08-29-01 7 119330 4220 2305 09-19-01 28 140700 4980 2305 09-19-01 28 138580 4900 4940 2305 Hold H 4 2306 08-29-01 7 106980 3790 2306 09-19-01 28 134530 4760 2306 09-19-01 28 139650 4940 4850 2306 Hold H 2424 STUTZ DR, · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · F^X [214] 350 0019 Set Cylinder I Age @ Total Load I Compressive Average No. ID I Date Tested Test lbs. I Strength p.s.i.Strength p.s.i. 5 2307 08-29-01 7 119240 4220 2307 09-19-01 28 135260 4790 2307 09-19-01 28 134560 4760 4780 2307 Hold H 6 2308 08-29-01 7 109180 3860 2308 09-19-01 28 127500 4510 2308 09-19-01 28 129260 4570 4540 2308 Hold H 7 2309 08-29-01 7 98170 3470 2309 09-19-01 28 123210 4360 2309 09-19-01 28 122880 4350 4360 2309 Hold H 8 2310 08-29-01 7 100210 3550 2310 09-19-01 28 122500 4340 2310 09-19-01 28 118850 4210 4280 2310 Hold H Cylinder Data Set Cylinder I Time of Concrete Air I Ticket No. ID Slump I Sample AirTemp. Temp. EntrainmentJ Number 1 2303 6.00 7:45AM 81 86 2.5 613961 2 2304 6.00 9:15AM 81 93 3.5 613970 3 2305 5.50 10:15AM 86 92 4.0 613980 4 2306 5.00 11:45AM 95 94 4.0 613981 5 2307 5.50 12:30AM 98 94 3.5 614002 6 2308 6.00 1:30AM 98 95 9.0 614004 7 2309 6.00 2:30PM 98 96 3.5 614021 8 2310 6.00 3:15PM 100 98 4.0 614030 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Butler Construction/Mr. David Husted (1) Pacheco Koch, Inc./Mr. Jack Evans Original Signed By (1) City of Coppel/Mr. Lee Stone (1) City of Coppel/Mr. Larry Davis Keith Atkins (1) HBC Engineering/Mr. Bob Baker KENje