Freeport NIP(7.5)-LR010822 GEOTECHNICALAND J ~ J~J O I I F~
ENVIRONHENTAL CONSULTANTS
I
CONCRETE CYLINDER TEST REPORT
Freeport 9
Coppell Road at Bethel Road
Coppell, Texas
REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 138
5495 Belt Line Road, Suite 360 REG PROJECT NO. 7888
Dallas, Texas 75240 SAMPLE DATE: 08-22-01
ATTN: Mr. Jeff Langston TECHNICIAN: A. Chairez
CONTRACTOR: Butler Construction
Location of Sample
Set Number I Location I Quantity Represented
1 Paving: 150'S, 340'W of S.W. building corner 40/780
2 Paving: 165'S, 300'W of S.W. building corner 130/780
3 Paving: 155'S, 250'W of S.W. building corner 230/780
4 Paving: 150'S, 200'W of S.W. building corner 320/780
5 Paving: 160'S, 150'W of S.W. building corner 450/780
6 Paving: 165'S, IO0'W of S.W. building corner 520/780
7 Paving: 130'S, 75'W of S.W. building corner 640/780
8 Paving: 125'S, 15'W of S.W. building corner 760/780
Design Information
l Source of Concrete I Mix Identification I Specified Strength p.s.i.
Potter 7752 4000
Test Results
Set Cy, inderI Age@ Total Load I CompressiveI Average
No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
1 2303 08-29-01 7 102090 3610
2303 09-19-01 28
2303 09-19-01 28
2303 Hold H
2 2304 08-29-01 7 124450 4400
2304 09-19-01 28
2304 09-19-01 28
2304 Hold H
3 2305 08-29-01 7 119330 4220
2305 09-19-01 28
2305 09-19-01 28
2305 Hold H
4 2306 08-29-01 7 106980 3790
2306 09-19-01 28
2306 09-19-01 28
2306 Hold H
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019
FlEE:I:] I E I--1E~ I I--1E E F;ilI--1E~i
GEOTECHNICALAND J~ J~ I'--I I I F~
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Freeport 9
Coppell Road at Bethel Road
Coppell, Texas
REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 138
5495 Belt Line Road, Suite 360 REG PROJECT NO. 7888
Dallas, Texas 75240 SAMPLE DATE: 08-22-01
ATTN: Mr. Jeff Langston TECHNICIAN: A. Chairez
CONTRACTOR: Butler Construction
Location of Sample
Set Number J Location J Quantity Represented
1 Paving: 150'S, 340'W of S.W. building corner 40/780
2 Paving: 165'S, 300'W of S.W. building corner 130/780
3 Paving: 155'S, 250'W of S.W. building corner 230/780
4 Paving: 150'S, 200'W of S.W. building corner 320/780
5 Paving: 160'S, 150'W of S.W. building corner 450/780
6 Paving: 165'S, 100'W of S.W. building corner 5201780
7 Paving: 130'S, 75'W of S.W. building corner 640/780
8 Paving: 125'S, 15'W of S.W. building corner 760/780
Design Information
IS°urce °f C°ncrete IPotter Mix Identification 7752 I Specified Strength P's'i' I 4000
Test Results
Set Cylinder Age (~ Total Load J Compressive Average
No. ID Date Tested Test lbs. J Strength p.s.i.Strength p.s.i.
1 2303 08-29-01 7 102090 3610
2303 09-19-01 28 122360 4330
2303 09-19-01 28 121290 4290 4310
2303 Hold H
2 2304 08-29-01 7 124450 4400
2304 09-19-01 28 137710 4870
2304 09-19-01 28 144110 5100 5990
2304 Hold H
3 2305 08-29-01 7 119330 4220
2305 09-19-01 28 140700 4980
2305 09-19-01 28 138580 4900 4940
2305 Hold H
4 2306 08-29-01 7 106980 3790
2306 09-19-01 28 134530 4760
2306 09-19-01 28 139650 4940 4850
2306 Hold H
2424 STUTZ DR, · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · F^X [214] 350 0019
Set Cylinder I Age @ Total Load I Compressive Average
No. ID I Date Tested Test lbs. I Strength p.s.i.Strength p.s.i.
5 2307 08-29-01 7 119240 4220
2307 09-19-01 28 135260 4790
2307 09-19-01 28 134560 4760 4780
2307 Hold H
6 2308 08-29-01 7 109180 3860
2308 09-19-01 28 127500 4510
2308 09-19-01 28 129260 4570 4540
2308 Hold H
7 2309 08-29-01 7 98170 3470
2309 09-19-01 28 123210 4360
2309 09-19-01 28 122880 4350 4360
2309 Hold H
8 2310 08-29-01 7 100210 3550
2310 09-19-01 28 122500 4340
2310 09-19-01 28 118850 4210 4280
2310 Hold H
Cylinder Data
Set Cylinder I Time of Concrete Air I Ticket
No. ID Slump I Sample AirTemp. Temp. EntrainmentJ Number
1 2303 6.00 7:45AM 81 86 2.5 613961
2 2304 6.00 9:15AM 81 93 3.5 613970
3 2305 5.50 10:15AM 86 92 4.0 613980
4 2306 5.00 11:45AM 95 94 4.0 613981
5 2307 5.50 12:30AM 98 94 3.5 614002
6 2308 6.00 1:30AM 98 95 9.0 614004
7 2309 6.00 2:30PM 98 96 3.5 614021
8 2310 6.00 3:15PM 100 98 4.0 614030
Mail Submitted by:
Distribution: (1) Duke-Weeks Realty Corporation/
Mr. Jeff Langston REED ENGINEERING GROUP, INC.
(1) Butler Construction/Mr. David Husted
(1) Pacheco Koch, Inc./Mr. Jack Evans Original Signed By
(1) City of Coppel/Mr. Lee Stone
(1) City of Coppel/Mr. Larry Davis Keith Atkins
(1) HBC Engineering/Mr. Bob Baker KENje