Freeport NIP(7.5)-LR010801REPORTED TO: Duke -Weeks Realty Corporation
5495 Belt Line Road, Suite 360
Dallas, Texas 75240
ATTN: Mr. Jeff Langston
CONTRACTOR: Butler Construction
FREEn
REPORT OF FIELD DENSITY TESTS
Freeport 9
Coppell Road at Bethel Road
Coppell, Texas
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
E Fl InEEFri 1rl
REPORT NO. 106
REPORT DATE: 08 -01 -01
REG PROJECT NO. 7888
TECHNICIAN: L. Johnson
PAGE: 1 of 1
Proctor
No.
ASTM
Standard
Description
Optimum
Moisture,
Maximum
Density, PCF
1
2
2a
3
3a
4
4a
5
5a
6
7
D -698
D -698
D -698
D -698
D -698
D -698
D -698
D -698
D -698
D -698
D -698
Dark brown clay
Dark brown and yellow clay
Brown clay (lime- treated)
Yellow brown sandy clay
Light brown clay
Brown clay w /traces red sand
Reddish brown sandy clay
Dark gray sandy clay
Dark gray sandy clay
Light brown clayey sand
Yellow brown clayey sand
165
18.5
21 0
12.5
180
15.0
160
185
18.5
11.5
12.5
103.0
102.0
97.0
113.0
102.0
104.0
99.0
99.5
99.5
112.5
113.0
Test
No.
Date
Location
Depth
Below
Final S. G.
(feet)
Field
Density
(pcf)
Field
Moisture
Proctor
ID
Compaction
Level
556 07 -17 -01 Site Fill: 300'N, 550'E(1)
557 Site Fill: 300'N, 450'E(1)
558 Site Fill: 300'N, 350'E(1)
559 Site Fill: 300'N, 250'E(1)
560 Site Fill: 300'N, 150'E(1)
561 Site Fill: 300'N, 50'E(1)
562 Site Fill: 400'N, 50'E(1)
563 Site Fill: 400'N, 150'E(1)
564 Site Fill: 400'N, 250'E(1)
565 Site Fill: 400'N, 350'E(1)
566 Site Fill: 400'N, 450'E(1)
567 Site Fill: 400'N, 550'E(1)
1.8
1.8
1.8
1.3
1.3
1.3
1.3
1.3
1.3
1.8
1.8
1.8
97.1
98.2
99.2
94.8
95.2
96.8
96.2
94.9
95.1
98.1
47.7
95.0
21.2
21.3
21.1
20.0
18.8
18.2
20.8
22.1
21.9
21.3
21.8
19.1
2
2
2
4a
4a
4a
5a
5a
5a
2
2
4
95.2
96.3
97.3
95.8
96.2
97.8
96.7
95.4
95.6
96.2
95.8
96.0
Comments: Where tested, materials were in compliance with project specifications.
Footnote: (1) Measurements referenced from N.W. building corner.
Submitted by:
Mail
Distribution: (1) Duke -Weeks Realty Corporation/
Mr. Jeff Langston
(1) Butler Construction /Mr. David Husted
(1) Pacheco Koch, Inc. /Mr. Jack Evans
(1) City of Coppel /Mr. Lee Stone
(1) City of Coppel /Mr. Larry Davis
(1) HBC Engineering /Mr. Bob Baker
REED ENGINEERING GROUP, INC.
Original Signed By
Ronald F. Reed, P.E.
BW /cg
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
G F=1oLJF'
REPORTED TO: Duke -Weeks Realty Corporation
5495 Belt Line Road, Suite 360
Dallas, Texas 75240
ATTN: Mr. Jeff Langston
CONTRACTOR: Butler Construction
Location of Sample
Design Information
Test Results
CONCRETE CYLINDER TEST REPORT
Freeport 9
Coppell Road at Bethel Road
Coppell, Texas
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
F=4EEID I E I GII 1EERI
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORT NO. 122
REG PROJECT NO. 7888
SAMPLE DATE: 08 01 01
TECHNICIAN: J. Johnson
Set Number 1 Location
1 Quantity Represented
1
2
3
4
5
6
Paving: 75'S, 45'E of N.E. building corner
Paving: 35'S, 40'E of N.E. building corner
Paving: 50'N, 38'E of N.E. building corner
Paving: 90'N, 45'E of N.E. building corner
Paving: 60'W, 40'N of N.E. building corner
Paving: 350'W, 50'N of N.W. building corner
40/600
130/600
250/600
330/600
490/600
550/600
Source of Concrete I Mix Identification
Specified Strength p.s.i.
Potter
7752
4000
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
1 1418
1418
1418
2 1419
1419
1419
3 1420
1420
1420
4 1421
1421
1421
08 -08 -01
08 -29 -01
08 -29 -01
08 -08 -01
08 -29 -01
08 -29 -01
08 -08 -01
08 -29 -01
08 -29 -01
08 -08 -01
08 -29 -01
08 -29 -01
7 81700
28
28
7 86430
28
28
7 96840
28
28
7 89220
28
28
2890
3060
3430
3160
G IRDuP
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
5 1422
1422
1422
6 1423
1423
1423
08 -08 -01
08 -29 -01
08 -29 -01
08 -08 -01
08 -29 -01
08 -29 -01
7 104560
28
28
7 93870
28
28
3700
3320
Cylinder Data
Set
No.
Cylinder
ID
Slump
Time of
Sample
Air Temp.
Concrete
Temp.
Air
Entrainment
Ticket
Number
1
2
3
4
5
6
1418
1419
1420
1421
1422
1423
6.00
5.50
5.00
6.00
5.50
6.00
7:20AM
8:24AM
9:30AM
10:30AM
12:59PM
2:20PM
86
89
95
96
97
99
91
93
94
93
94
95
N/A
N/A
N/A
N/A
N/A
N/A
105284
105293
105305
105313
105329
N/A
Mail
Distribution: (1) Duke -Weeks Realty Corporation/
Mr. Jeff Langston
(1) Butler Construction /Mr. David Husted
(1) Pacheco Koch, Inc. /Mr. Jack Evans
(1) City of Coppel /Mr. Lee Stone
(1) City of Coppel /Mr. Larry Davis
(1) HBC Engineering /Mr. Bob Baker
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je
REPORTED TO: Duke -Weeks Realty Corporation
5495 Belt Line Road, Suite 360
Dallas, Texas 75240
ATTN: Mr. Jeff Langston
CONTRACTOR: Butler Construction
Location of Sample
Design Information
Test Results
Fl E E L7
CONCRETE CYLINDER TEST REPORT
Freeport 9
Coppell Road at Bethel Road
Coppell, Texas
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORT NO. 122
REG PROJECT NO. 7888
SAMPLE DATE: 08 -01 -01
TECHNICIAN: J. Johnson
Set Number I Location
Quantity Represented
1 Paving: 75'S, 45'E of N.E. building corner
2 Paving: 35'S, 40'E of N.E. building corner
3 Paving: 50'N, 38'E of N.E. building corner
4 Paving: 90'N, 45'E of N.E. building corner
5 Paving: 60'W, 40'N of N.E. building corner
6 Paving: 350'W, 50'N of N.W. building corner
40/600
130/600
250/600
330/600
490/600
550/600
Source of Concrete I Mix Identification
Specified Strength p.s.i.
Potter
7752
4000
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
1 1418
1418
1418
2 1419
1419
1419
3 1420
1420
1420
4 1421
1421
1421
08 -08 -01
08 -29 -01
08 -29 -01
08 -08 -01
08 -29 -01
08 -29 -01
08 -08 -01
08 -29 -01
08 -29 -01
08 -08 -01
08 -29 -01
08 -29 -01
7
28
28
7
28
28
7
28
28
7
28
28
81700
119920
119860
86430
118250
119870
96840
121010
121650
89220
115010
114710
2890
4240
4240
3060
4190
4240
3430
4280
4310
3160
4070
4060
4240
4220
4300
4070
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
Er'lC� 11 IEERIr1G
GROU
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
I bs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
5 1422
1422
1422
6 1423
1423
1423
08 -08 -01
08 -29 -01
08 -29 -01
08 -08 -01
08 -29 -01
08 -29 -01
7
28
28
7
28
28
104560
122410
126360
93870
116480
116700
3700
4330
4470
3320
4120
4130
4400
4130
Cylinder Data
Set
No.
Cylinder
ID
Slump
Time of
Sample
Air Temp.
Concrete
Temp.
Air
Entrainment
Ticket
Number
1
2
3
4
5
6
1418
1419
1420
1421
1422
1423
6.00
5.50
5.00
6.00
5.50
6.00
7:20AM
8:24AM
9:30AM
10:30AM
12:59PM
2:20PM
86
89
95
96
97
99
91
93
94
93
94
95
N/A
N/A
N/A
N/A
N/A
N/A
105284
105293
105305
105313
105329
N/A
Mail
Distribution: (1) Duke -Weeks Realty Corporation/
Mr. Jeff Langston
(1) Butler Construction /Mr. David Husted
(1) Pacheco Koch, Inc. /Mr. Jack Evans
(1) City of Coppel /Mr. Lee Stone
(1) City of Coppel /Mr. Larry Davis
(1) HBC Engineering /Mr. Bob Baker
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je