Loading...
Freeport NIP(7.5)-LR010730REPORTED TO: Duke -Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston CONTRACTOR: Butler Construction Location of Sample Design Information Test Results REEL? CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS Er1GIr1EER111G REPORT NO. 119 REG PROJECT NO. 7888 SAMPLE DATE: 07 -30 -01 TECHNICIAN: F. Steadman Set Number Location 1 Quantity Represented 1 2 3 4 Paving: 75'N, 70'w of N.W. building corner Paving: 130'N, 20'E of N.W. building corner Paving: 35'N, 90'E of N.W. building corner Paving: 145'N, 5'E of column A -10 130/620 250/620 420/620 580/620 Source of Concrete I Mix Identification Specified Strength p.s.i. Potter 7752 4000 Set No. Cylinder ID Date Tested Age Test Total Load I bs. Compressive Strength p.s.i. Average Strength p.s.i. 1 1296 1296 1296 1296 2 1297 1297 1297 1297 3 1298 1298 1298 1298 4 1299 1299 1299 1299 08 -06 -01 08 -27 -01 08 -27 -01 Hold 08 -06 -01 08 -27 -01 08 -27 -01 Hold 08 -06 -01 08 -27 -01 08 -27 -01 Hold 08 -06 -01 08 -27 -01 08 -27 -01 Hold 7 28 28 H 90610 7 94520 28 28 H 7 96290 28 28 H 7 101390 28 28 H 3210 3340 3410 3590 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019 GROUP Cylinder Data Set No. Cylinder ID Slump Time of Sample Air Temp. Concrete Temp. Air Entrainment Ticket Number 1 1296 6.00 7:50AM 84 94 4.5 105161 2 1297 5.50 10:05AM 91 95 4.2 105173 3 1298 5.50 11:35AM 91 95 4.7 105190 4 1299 5.75 1:50PM 94 99 4.7 105206 Mail Distribution: (1) Duke -Weeks Realty Corporation/ Mr. Jeff Langston (1) Butler Construction /Mr. David Husted (1) Pacheco Koch, Inc. /Mr. Jack Evans (1) City of Coppel /Mr. Lee Stone (1) City of Coppel /Mr. Larry Davis (1) HBC Engineering /Mr. Bob Baker Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je