Loading...
Freeport NIP(7.5)-LR010709REPORTED TO: Duke -Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston CONTRACTOR: Butler Construction Location of Sample Design Information Test Results I=1 CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT NO. 109 REG PROJECT NO. 7888 SAMPLE DATE: 07 -09 -01 TECHNICIAN: A. Chairez Set Number I Location 1 Quantity Represented 1 2 3 4 5 6 Panel 40 Panel 47 Panel 54 Panel 63 Panel 68 Panel 75 30/590 130/590 130/590 330/590 430/590 530/590 Source of Concrete 1 Mix Identification Specified Strength p.s.i. Potter 9349 3000 Set No. Cylinder ID Date Tested Age Test Total Load lbs. Compressive Strength p.s.i. Average Strength p.s.i. 1 0278 0278 0278 2 0279 0279 0279 3 0280 0280 0280 4 0281 0281 0281 5 0282 0282 0282 07 -16 -01 08 -06 -01 08 -06 -01 07 -16 -01 08 -06 -01 08 -06 -01 07 -16 -01 08 -06 -01 08 -06 -01 07 -16 -01 08 -06 -01 08 -06 -01 07 -16 -01 08 -06 -01 08 -06 -01 7 28 28 7 28 28 7 28 28 7 28 28 7 28 28 112130 120210 89240 113520 102750 3970 4250 3160 4020 3640 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019 E I G I I E E 1=1 G1=1OlJP Set No. Cylinder ID Date Tested Age Test Total Load lbs. Compressive Strength p.s.i. Average Strength p.s.i. 6 0283 0283 0283 07 -16 -01 08 -06 -01 08 -06 -01 7 107080 28 28 3790 Cylinder Data Set No. Cylinder ID Slump Time of Sample Air Temp. Concrete Temp. Air Entrainment Ticket Number 1 2 3 4 5 6 0278 0279 0280 0281 0282 0283 5.00 4.50 5.50 5.00 5.00 4.50 7:30AM 8:15AM 9:30AM 10:30AM 11:30AM 1:OOPM 84 85 87 91 99 97 91 91 91 91 91 92 N/A N/A N/A N/A N/A N/A 104887 104897 104908 104917 104927 104939 Mail Distribution: (1) Duke -Weeks Realty Corporation/ Mr. Jeff Langston (1) Butler Construction /Mr. David Husted (1) Pacheco Koch, Inc. /Mr. Jack Evans (1) City of Coppel /Mr. Lee Stone (1) City of Coppel /Mr. Larry Davis (1) HBC Engineering /Mr. Bob Baker Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je REPORTED TO: Duke -Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston CONTRACTOR: Butler Construction R IE E n REPORT OF PIER OBSERVATION Freeport 9 Coppell Road at Bethel Road Coppell, Texas GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS EnGinEE REPORT NO. 59 REPORT DATE: 07 -09 -01 REG PROJECT NO. 7888 TECHNICIAN: J. Johnson PAGE: 1 of 1 Date Pier No. Pier Diameter (inches) Bell Diameter (inches) Depth Before Bell (feet) Final Depth of Pier (feet) Concrete Length (feet) 06 -21 -01 06 -22 -01 B.5 -23 D.5 -23 E.1 -23 E.5 -23 F.1 -23 F.5 -23 G.1 -23 G.5 -23 H.1 -23 H.5 -23 J.1 -23 J.5 -23 J.9 -423 K.3 -23 K.7 -23 L -22.7 L -22.3 L -21.8 L -21.5 L -21.3 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 14.0 14.0 13.9 14.2 13.7 13.6 14.3 15.0 13.8 12.7 12.7 13.1 13.2 13.0 13.9 13.2 13.4 13.6 12.0 12.7 14.0 14.1 14.0 14.2 13.7 13.7 14.6 15.8 14.4 14.1 12.8 13.1 12.6 13.0 13.9 13.2 13.6 14.6 12.3 13.4 14.1 14.0 13.8 13.7 13.0 13.0 14.1 15.4 14.0 13.5 12.2 13.1 12.4 13.0 13.6 13.0 13.4 14.3 12.1 13.1 Mail Distribution: (1) Duke -Weeks Realty Corporation/ Mr. Jeff Langston (1) Butler Construction /Mr. David Husted (1) Pacheco Koch, Inc. /Mr. Jack Evans (1) City of Coppel /Mr. Lee Stone (1) City of Coppel /Mr. Larry Davis (1) HBC Engineering /Mr. Bob Baker Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. BW /cg 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019 GROUP REPORTED TO: Duke -Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston CONTRACTOR: Butler Construction Location of Sample Design Information Test Results CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT NO. 109 REG PROJECT NO. 7888 SAMPLE DATE: 07 -09 -01 TECHNICIAN: A. Chairez Set Number Location 1 Quantity Represented 1 Panel 40 2 Panel 47 3 Panel 54 4 Panel 63 5 Panel 68 6 Panel 75 30/590 130/590 130/590 330/590 430/590 530/590 Source of Concrete I Mix Identification Specified Strength p.s.i. Potter 9349 3000 Set No. Cylinder ID Date Tested Age Test Total Load I bs. Compressive Strength p.s.i. Average Strength p.s.i. 1 0278 07 -16 -01 7 112130 3970 0278 08 -06 -01 28 133540 4730 0278 08 -06 -01 28 135860 4810 2 0279 07 -16 -01 7 120210 4250 0279 08 -06 -01 28 150210 5320 0279 08 -06 -01 28 152100 5380 3 0280 07 -16 -01 7 89240 3160 0280 08 -06 -01 28 122500 4340 0280 08 -06 -01 28 125300 4430 4 0281 07 -16 -01 7 113520 4020 0281 08 -06 -01 28 108630 3840 0281 08 -06 -01 28 112690 3990 5 0282 07 -16 -01 7 102750 3640 0282 08 -06 -01 28 132130 4680 0282 08 -06 -01 28 134090 4750 4770 5350 4390 3920 4720 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019 EI 1GII IEEFRIr1G G F=1 LI Fa Set No. Cylinder ID Date Tested Age Test Total Load lbs. Compressive Strength p.s.i. Average Strength p.s.i. 6 0283 0283 0283 07 -16 -01 08 -06 -01 08 -06 -01 7 28 28 107080 126160 135870 3790 4470 4810 4640 Cylinder Data Set No. Cylinder ID Slump Time of Sample Air Temp. Concrete Temp. Air Entrainment Ticket Number 1 2 3 4 5 6 0278 0279 0280 0281 0282 0283 5.00 4.50 5.50 5.00 5.00 4.50 7:30AM 8:15AM 9:30AM 10:30AM 11:30AM 1:OOPM 84 85 87 91 99 97 91 91 91 91 91 92 N/A N/A N/A N/A N/A N/A 104887 104897 104908 104917 104927 104939 Mail Distribution: (1) Duke -Weeks Realty Corporation/ Mr. Jeff Langston (1) Butler Construction /Mr. David Husted (1) Pacheco Koch, Inc. /Mr. Jack Evans (1) City of Coppel /Mr. Lee Stone (1) City of Coppel /Mr. Larry Davis (1) HBC Engineering /Mr. Bob Baker Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je