Freeport NIP(7.5)-LR010628REPORTED TO: Duke -Weeks Realty Corporation
5495 Belt Line Road, Suite 360
Dallas, Texas 75240
ATTN: Mr. Jeff Langston
CONTRACTOR: Butler Construction
Location of Sample
Design Information
Test Results
CONCRETE CYLINDER TEST REPORT
Freeport 9
Coppell Road at Bethel Road
Coppell, Texas
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
FREEa I E 1
GEOTECHNICAL AND l IM F:I O L I P
ENVIRONMENTAL CONSULTANTS
REPORT NO. 101
REG PROJECT NO. 7888
SAMPLE DATE: 06 -28 -01
TECHNICIAN: R. Yeoman
Set Number I Location
Quantity Represented
1 Paving: 100'N, 20'W of N.E. building corner
2 Paving: 150'N, 91'W. of N.E. building corner
3 Paving: 170'N, 115'W of N.E. building corner
4 Paving: 90'N, 750'W of N.E. building corner
5 Paving: 110'N, 195'W of N.E. building corner
50/510
130/510
280/510
320/510
440/510
Source of Concrete 1 Mix Identification
Specified Strength p.s.i.
Potter
7752
4000
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
1 0067
0067
0067
2 0068
0068
0068
3 0069
0069
0069
4 0070
0070
0070
07 -05 -01
07 -26 -01
07 -26 -01
07 -05 -01
07 -26 -01
07 -26 -01
07 -05 -01
07 -26 -01
07 -26 -01
07 -05 -01
07 -26 -01
07 -26 -01
7
28
28
7
28
28
7
28
28
7
28
28
89410
110550
106540
91930
114330
109880
100770
119870
124430
97870
125350
125470
3160
3910
3770
3250
4050
3890
3570
4240
4400
3460
4440
4440
3840
3970
4320
4440
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
5 0071
0071
0071
07 -05 -01
07 -26 -01
07 -26 -01
7
28
28
106440
133010
130890
3770
4710
4630
4670
Cylinder Data
Set
No.
Cylinder
ID
Slump
Time of
Sample
Air Temp.
Concrete
Temp.
Air
Entrainment
Ticket
Number
1
2
3
4
5
0067
0068
0069
0070
0071
5.00
4.50
5.25
5.00
5.00
9:50AM
11:OOAM
12:50PM
2:20PM
4:OOPM
80
82
82
88
89
89
89
89
89
89
4.9
4.8
5.0
4.7
4.9
612486
612499
61252
104601
104613
Mail
Distribution: (1) Duke -Weeks Realty Corporation/
Mr. Jeff Langston
(1) Butler Construction /Mr. David Husted
(1) Pacheco Koch, Inc. /Mr. Jack Evans
(1) City of Coppel /Mr. Lee Stone
(1) City of Coppel /Mr. Larry Davis
(1) HBC Engineering /Mr. Bob Baker
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je
REPORTED TO: Duke -Weeks Realty Corporation
5495 Belt Line Road, Suite 360
Dallas, Texas 75240
ATTN: Mr. Jeff Langston
CONTRACTOR: Butler Construction
Location of Sample
Design Information
Test Results
CONCRETE CYLINDER TEST REPORT
Freeport 9
Coppell Road at Bethel Road
Coppell, Texas
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
REED E IGII I EERI r7 G
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORT NO. 101
REG PROJECT NO. 7888
SAMPLE DATE: 06 -28 -01
TECHNICIAN: R. Yeoman
Set Number I Location
Quantity Represented
1
2
3
4
5
Paving: 100'N, 20'W of N.E. building corner
Paving: 150'N, 91'W. of N.E. building corner
Paving: 170'N, 115'W of N.E. building corner
Paving: 90'N, 750'W of N.E. building corner
Paving: 110'N, 195'W of N.E. building corner
50/510
130/510
280/510
320/510
440/510
Source of Concrete 1 Mix Identification
Specified Strength p.s.i.
Potter
7752
4000
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
1 0067
0067
0067
2 0068
0068
0068
3 0069
0069
0069
4 0070
0070
0070
07 -05 -01
07 -26 -01
07 -26 -01
07 -05 -01
07 -26 -01
07 -26 -01
07 -05 -01
07 -26 -01
07 -26 -01
07 -05 -01
07 -26 -01
07 -26 -01
7 89410
28
28
7 91930
28
28
7 100770
28
28
7 97870
28
28
3160
3250
3570
3460
GROU
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
5 0071
0071
0071
07 -05 -01
07 -26 -01
07 -26 -01
7 106440
28
28
3770
Cylinder Data
Set
No.
Cylinder
ID
Slump
Time of
Sample
Air Temp.
Concrete
Temp.
Air
Entrainment
Ticket
Number
1
2
3
4
5
0067
0068
0069
0070
0071
5.00
4.50
5.25
5.00
5.00
9:50AM
11:OOAM
12:50PM
2:20PM
4:OOPM
80
82
82
88
89
89
89
89
89
89
4.9
4.8
5.0
4.7
4.9
612486
612499
61252
104601
104613
Mail
Distribution: (1) Duke -Weeks Realty Corporation/
Mr. Jeff Langston
(1) Butler Construction /Mr. David Husted
(1) Pacheco Koch, Inc. /Mr. Jack Evans
(1) City of Coppel /Mr. Lee Stone
(1) City of Coppel /Mr. Larry Davis
(1) HBC Engineering /Mr. Bob Baker
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je