Loading...
Freeport NIP(7.5)-LR010628REPORTED TO: Duke -Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston CONTRACTOR: Butler Construction Location of Sample Design Information Test Results CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019 FREEa I E 1 GEOTECHNICAL AND l IM F:I O L I P ENVIRONMENTAL CONSULTANTS REPORT NO. 101 REG PROJECT NO. 7888 SAMPLE DATE: 06 -28 -01 TECHNICIAN: R. Yeoman Set Number I Location Quantity Represented 1 Paving: 100'N, 20'W of N.E. building corner 2 Paving: 150'N, 91'W. of N.E. building corner 3 Paving: 170'N, 115'W of N.E. building corner 4 Paving: 90'N, 750'W of N.E. building corner 5 Paving: 110'N, 195'W of N.E. building corner 50/510 130/510 280/510 320/510 440/510 Source of Concrete 1 Mix Identification Specified Strength p.s.i. Potter 7752 4000 Set No. Cylinder ID Date Tested Age Test Total Load lbs. Compressive Strength p.s.i. Average Strength p.s.i. 1 0067 0067 0067 2 0068 0068 0068 3 0069 0069 0069 4 0070 0070 0070 07 -05 -01 07 -26 -01 07 -26 -01 07 -05 -01 07 -26 -01 07 -26 -01 07 -05 -01 07 -26 -01 07 -26 -01 07 -05 -01 07 -26 -01 07 -26 -01 7 28 28 7 28 28 7 28 28 7 28 28 89410 110550 106540 91930 114330 109880 100770 119870 124430 97870 125350 125470 3160 3910 3770 3250 4050 3890 3570 4240 4400 3460 4440 4440 3840 3970 4320 4440 Set No. Cylinder ID Date Tested Age Test Total Load lbs. Compressive Strength p.s.i. Average Strength p.s.i. 5 0071 0071 0071 07 -05 -01 07 -26 -01 07 -26 -01 7 28 28 106440 133010 130890 3770 4710 4630 4670 Cylinder Data Set No. Cylinder ID Slump Time of Sample Air Temp. Concrete Temp. Air Entrainment Ticket Number 1 2 3 4 5 0067 0068 0069 0070 0071 5.00 4.50 5.25 5.00 5.00 9:50AM 11:OOAM 12:50PM 2:20PM 4:OOPM 80 82 82 88 89 89 89 89 89 89 4.9 4.8 5.0 4.7 4.9 612486 612499 61252 104601 104613 Mail Distribution: (1) Duke -Weeks Realty Corporation/ Mr. Jeff Langston (1) Butler Construction /Mr. David Husted (1) Pacheco Koch, Inc. /Mr. Jack Evans (1) City of Coppel /Mr. Lee Stone (1) City of Coppel /Mr. Larry Davis (1) HBC Engineering /Mr. Bob Baker Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je REPORTED TO: Duke -Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston CONTRACTOR: Butler Construction Location of Sample Design Information Test Results CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019 REED E IGII I EERI r7 G GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT NO. 101 REG PROJECT NO. 7888 SAMPLE DATE: 06 -28 -01 TECHNICIAN: R. Yeoman Set Number I Location Quantity Represented 1 2 3 4 5 Paving: 100'N, 20'W of N.E. building corner Paving: 150'N, 91'W. of N.E. building corner Paving: 170'N, 115'W of N.E. building corner Paving: 90'N, 750'W of N.E. building corner Paving: 110'N, 195'W of N.E. building corner 50/510 130/510 280/510 320/510 440/510 Source of Concrete 1 Mix Identification Specified Strength p.s.i. Potter 7752 4000 Set No. Cylinder ID Date Tested Age Test Total Load lbs. Compressive Strength p.s.i. Average Strength p.s.i. 1 0067 0067 0067 2 0068 0068 0068 3 0069 0069 0069 4 0070 0070 0070 07 -05 -01 07 -26 -01 07 -26 -01 07 -05 -01 07 -26 -01 07 -26 -01 07 -05 -01 07 -26 -01 07 -26 -01 07 -05 -01 07 -26 -01 07 -26 -01 7 89410 28 28 7 91930 28 28 7 100770 28 28 7 97870 28 28 3160 3250 3570 3460 GROU Set No. Cylinder ID Date Tested Age Test Total Load lbs. Compressive Strength p.s.i. Average Strength p.s.i. 5 0071 0071 0071 07 -05 -01 07 -26 -01 07 -26 -01 7 106440 28 28 3770 Cylinder Data Set No. Cylinder ID Slump Time of Sample Air Temp. Concrete Temp. Air Entrainment Ticket Number 1 2 3 4 5 0067 0068 0069 0070 0071 5.00 4.50 5.25 5.00 5.00 9:50AM 11:OOAM 12:50PM 2:20PM 4:OOPM 80 82 82 88 89 89 89 89 89 89 4.9 4.8 5.0 4.7 4.9 612486 612499 61252 104601 104613 Mail Distribution: (1) Duke -Weeks Realty Corporation/ Mr. Jeff Langston (1) Butler Construction /Mr. David Husted (1) Pacheco Koch, Inc. /Mr. Jack Evans (1) City of Coppel /Mr. Lee Stone (1) City of Coppel /Mr. Larry Davis (1) HBC Engineering /Mr. Bob Baker Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je