Freeport NIP(7.5)-LR010625Set
No.
Cylinder
ID
Slump
Time of
Sample
Air Temp.
Concrete
Temp.
Air
Entrainment
Ticket
Number
1 9790 5.00 3:10PM 92 90 N/A 104474
REPORTED TO: Duke -Weeks Realty Corporation
5495 Belt Line Road, Suite 360
Dallas, Texas 75240
ATTN: Mr. Jeff Langston
CONTRACTOR: Butler Construction
Location of Sample
Design Information
Test Results
CONCRETE CYLINDER TEST REPORT
Freeport 9
Coppell Road at Bethel Road
Coppell, Texas
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
E I I 1EEFRI1 IG
REPORT NO. 91
REG PROJECT NO. 7888
SAMPLE DATE: 06 -25 -01
TECHNICIAN: J. Johnson
Set Number I Location
Quantity Represented
1
Piers: L -23, L -21 and L -20.9
10/10
Source of Concrete I Mix Identification
Specified Strength p.s.i.
Potter
9337
3000
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
1 9790
9790
9790
9790
07 -02 -01
07 -02 -01
07 -23 -01
07 -23 -01
7
7
28
28
119160
119780
148420
154870
4220
4240
5250
5480
4230
5370
Cylinder Data
Mail
Distribution: (1) Duke -Weeks Realty Corporation/
Mr. Jeff Langston
(1) Butler Construction /Mr. David Husted
(1) Pacheco Koch, Inc. /Mr. Jack Evans
(1) City of Coppel /Mr. Lee Stone
(1) City of Coppel /Mr. Larry Davis
(1) HBC Engineering /Mr. Bob Baker
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
GFROLJF2
REPORTED TO: Duke -Weeks Realty Corporation
5495 Belt Line Road, Suite 360
Dallas, Texas 75240
ATTN: Mr. Jeff Langston
CONTRACTOR: Butler Construction
Location of Sample
Design Information
Test Results
1=1EE
CONCRETE CYLINDER TEST REPORT
Freeport 9
Coppell Road at Bethel Road
Coppell, Texas
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORT NO. 90
REG PROJECT NO. 7888
SAMPLE DATE: 06 -25 -01
TECHNICIAN: R. Yeoman
Set Number 1 Location
1 Quantity Represented
1
2
3
4
5
6
Paving: 140'N, 500'W of S.E. building corner
Paving: 180'S, 420'W of S.E. building corner
Paving: 155'S, 340'W of S.E. building corner
Paving: 115'S, 185'W of S.E. building corner
Paving: 100'S, 10'W of S.E. building corner
Paving: 98'S, 200'N of S.E. building corner
20/620
140/620
270/620
340/620
440/620
560/620
Source of Concrete Mix Identification
Specified Strength p.s.i.
Potter
7750
4000
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
1 9793
9793
9793
9793
2 9794
9794
9794
9794
3 9795
9795
9795
9795
4 9796
9796
9796
9796
07 -02 -01
07 -23 -01
07 -23 -01
Hold
07 -02 -01
07 -23 -01
07 -23 -01
Hold
07 -02 -01
07 -23 -01
07 -23 -01
Hold
07 -02 -01
07 -23 -01
07 -23 -01
Hold
7 116220
28
28
H
7 91410
28
28
H
7 113470
28
28
H
7 109930
28
28
H
4110
3230
4020
3890
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
EnsinEFIIr7G
O 1=1 C3 LJ
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
5 9797 07 -02 -01 7 100600 3560
9797 07 -23 -01 28
9797 07 -23 -01 28
9797 Hold H
6 9798
9798
9798
9798
07 -02 -01
07 -23 -01
07 -23 -01
Hold
7 128900 4560
28
28
H
Cylinder Data
Set
No.
Cylinder
ID
Slump
Time of
Sample
Air Temp.
Concrete
Temp.
Air
Entrainment
Ticket
Number
1 9793 5.00 8:20AM 78 89 5.5 104416
2 9794 4.75 9:40AM 84 90 4.9 104428
3 9795 5.50 11:15AM 88 89 4.7 104441
4 9796 5.00 12:40PM 89 90 4.6 104448
5 9797 5.00 1:45PM 90 88 4.6 104458
6 9798 5.00 3:15PM 91 90 4.5 104470
Mail
Distribution: (1) Duke -Weeks Realty Corporation/
Mr. Jeff Langston
(1) Butler Construction /Mr. David Husted
(1) Pacheco Koch, Inc. /Mr. Jack Evans
(1) City of Coppel /Mr. Lee Stone
(1) City of Coppel/Mr. Larry Davis
(1) HBC Engineering /Mr. Bob Baker
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je
Set
No.
Cylinder
ID
Slump
Time of
Sample
Air Temp.
Concrete
Temp.
Air
Entrainment
Ticket
Number
1 9790 5.00 3:10PM 92 90 N/A 104474
REPORTED TO: Duke -Weeks Realty Corporation
5495 Belt Line Road, Suite 360
Dallas, Texas 75240
ATTN: Mr. Jeff Langston
CONTRACTOR: Butler Construction
Location of Sample
Design Information
Test Results
Cylinder Data
CONCRETE CYLINDER TEST REPORT
Freeport 9
Coppell Road at Bethel Road
Coppell, Texas
Mail
Distribution: (1) Duke -Weeks Realty Corporation/
Mr. Jeff Langston
(1) Butler Construction /Mr. David Husted
(1) Pacheco Koch, Inc. /Mr. Jack Evans
(1) City of Coppel /Mr. Lee Stone
(1) City of Coppel /Mr. Larry Davis
(1) HBC Engineering /Mr. Bob Baker
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
REEa EI ICSII IEERII1 ES
GEOTECHNICAL AND I E R O L I P
ENVIRONMENTAL CONSULTANTS
Keith Atkins
KEA/je
REPORT NO. 91
REG PROJECT NO. 7888
SAMPLE DATE: 06 -25 -01
TECHNICIAN: J. Johnson
Set Number I Location
1 Quantity Represented
1
Piers: L -23, L -21 and L -20.9
10/10
Source of Concrete 1 Mix Identification
Specified Strength p.s.i.
Potter
9337
3000
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
1 9790
9790
9790
9790
07 -02 -01
07 -02 -01
07 -23 -01
07 -23 -01
7
7
28
28
119160
119780
4220
4240 4230
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
REPORTED TO: Duke -Weeks Realty Corporation
5495 Belt Line Road, Suite 360
Dallas, Texas 75240
ATTN: Mr. Jeff Langston
CONTRACTOR: Butler Construction
Location of Sample
Design Information
Test Results
CONCRETE CYLINDER TEST REPORT
Freeport 9
Coppell Road at Bethel Road
Coppell, Texas
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
REED CES
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORT NO. 90
REG PROJECT NO. 7888
SAMPLE DATE: 06 -25 -01
TECHNICIAN: R. Yeoman
Set Number I Location
Quantity Represented
1
2
3
4
5
6
Paving: 140'N, 500'W of S.E. building corner
Paving: 180'S, 420'W of S.E. building corner
Paving: 155'S, 340'W of S.E. building corner
Paving: 115'S, 185'W of S.E. building corner
Paving: 100'S, 10'W of S.E. building corner
Paving: 98'S, 200'N of S.E. building corner
20/620
140/620
270/620
340/620
440/620
560/620
Source of Concrete
Mix Identification
Specified Strength p.s.i.
Potter
7750
4000
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
I bs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
1 9793
9793
9793
9793
2 9794
9794
9794
9794
3 9795
9795
9795
9795
4 9796
9796
9796
9796
07 -02 -01
07 -23 -01
07 -23 -01
Hold
07 -02 -01
07 -23 -01
07 -23 -01
Hold
07 -02 -01
07 -23 -01
07 -23 -01
Hold
07 -02 -01
07 -23 -01
07 -23 -01
Hold
7
28
28
H
7
28
28
H
7
28
28
H
7
28
28
H
116220
140880
146700
91410
119610
120880
113470
136170
140460
109930
132180
135130
4110
4990
5190
3230
4230
4280
4020
4820
4970
3890
4680
4780
5090
4260
4900
4730
GROU
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
5 9797
9797
9797
9797
6 9798
9798
9798
9798
07 -02 -01
07 -23 -01
07 -23 -01
Hold
07 -02 -01
07 -23 -01
07 -23 -01
Hold
7
28
28
H
7
28
28
H
100600
123960
128620
128900
144430
151280
3560
4390
4550
4560
5110
5350
4470
5230
Cylinder Data
Set
No.
Cylinder
ID
Slump
Time of
Sample
Air Temp.
Concrete
Temp.
Air
Entrainment
Ticket
Number
1
2
3
4
5
6
9793
9794
9795
9796
9797
9798
5.00
4.75
5.50
5.00
5.00
5.00
8:20AM
9:40AM
11:15AM
12:40PM
1:45PM
3:15PM
78
84
88
89
90
91
89
90
89
90
88
90
5.5
4.9
4.7
4.6
4.6
4.5
104416
104428
104441
104448
104458
104470
Mail
Distribution: (1) Duke -Weeks Realty Corporation/
Mr. Jeff Langston
(1) Butler Construction /Mr. David Husted
(1) Pacheco Koch, Inc. /Mr. Jack Evans
(1) City of Coppel /Mr. Lee Stone
(1) City of Coppel /Mr. Larry Davis
(1) HBC Engineering /Mr. Bob Baker
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je