Freeport NIP(7.5)-LR010611 (2)REPORTED TO: Duke -Weeks Realty Corporation
5495 Belt Line Road, Suite 360
Dallas, Texas 75240
ATTN: Mr. Jeff Langston
CONTRACTOR: Butler Construction
Location of Sample
Design Information
Test Results
FREEn
CONCRETE CYLINDER TEST REPORT
Freeport 9
Coppell Road at Bethel Road
Coppell, Texas
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORT NO. 54
REG PROJECT NO. 7888
SAMPLE DATE: 06 11 01
TECHNICIAN: R. Yeoman
Set Number 1 Location
Quantity Represented
1
2
3
4
5
6
7
Floor Slab E -21.5
Floor Slab E -20.2
Floor Slab E -19.5
Floor Slab E -18.5
Floor Slab E -18.8
Floor Slab E -17.5
Floor Slab E -16.5
40/710
140/710
230/710
320/710
450/710
540/710
670/710
Source of Concrete
Mix Identification
Specified Strength p.s.i.
Potter
9349
4000
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
1 9015
9015
9015
9015
2 9016
9016
9016
9016
3 9017
9017
9017
9017
4 9018
9018
9018
9018
06 -18 -01
07 -09 -01
07 -09 -01
Hold
06 -18 -01
07 -09 -01
07 -09 -01
Hold
06 -18 -01
07 -09 -01
07 -09 -01
Hold
06 -18 -01
07 -09 -01
07 -09 -01
Hold
7
28
28
H
7
28
28
H
7
28
28
H
7
28
28
H
119330
119920
119980
106690
4220
4240
4250
3780
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
En�inEERin�
C ROUP
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
5 9019 06 -18 -01 7 116580 4130
9019 07 -09 -01 28
9019 07 -09 -01 28
9019 Hold H
6 9020 06 -18 -01 7 96490 3410
9020 07 -09 -01 28
9020 07 -09 -01 28
9020 Hold H
7 9021
9021
9021
9021
06 -18 -01
07 -09 -01
07 -09 -01
Hold
7 111030 3930
28
28
H
Cylinder Data
Set
No.
Cylinder
ID
Slump
Time of
Sample
Air Temp.
Concrete
Temp.
Air
Entrainment
Ticket
Number
1 9015 4.75 7:25AM 76 88 N/A 103783
2 9016 5.00 8:10AM 78 88 N/A 103870
3 9017 4.50 9:10AM 79 88 N/A 103802
4 9018 5.50 9:50AM 82 88 N/A 103811
5 9019 5.00 10:40AM 84 88 N/A 103824
6 9020 4.50 11:25AM 88 88 N/A 103833
7 9021 4.75 12:40AM 89 88 N/A 103846
Mail
Distribution: (1) Duke -Weeks Realty Corporation/
Mr. Jeff Langston
(1) Butler Construction /Mr. David Husted
(1) Pacheco Koch, Inc. /Mr. Jack Evans
(1) City of Coppel /Mr. Lee Stone
(1) City of Coppel /Mr. Larry Davis
(1) HBC Engineering /Mr. Bob Baker
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je
REPORTED TO: Duke -Weeks Realty Corporation
5495 Belt Line Road, Suite 360
Dallas, Texas 75240
ATTN: Mr. Jeff Langston
CONTRACTOR: Butler Construction
Location of Sample
Design Information
Test Results
CONCRETE CYLINDER TEST REPORT
Freeport 9
Coppell Road at Bethel Road
Coppell, Texas
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORT NO. 54
REG PROJECT NO. 7888
SAMPLE DATE: 06 -11 -01
TECHNICIAN: R. Yeoman
Set Number I Location
1 Quantity Represented
1
2
3
4
5
6
7
Floor Slab E -21.5
Floor Slab E -20.2
Floor Slab E -19.5
Floor Slab E -18.5
Floor Slab E -18.8
Floor Slab E -17.5
Floor Slab E -16.5
40/710
140/710
230/710
320/710
450/710
540/710
670/710
Source of Concrete
Mix Identification
Specified Strength p.s.i.
Potter
9349
4000
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
1 9015
9015
9015
9015
2 9016
9016
9016
9016
3 9017
9017
9017
9017
4 9018
9018
9018
9018
06 -18 -01
07 -09 -01
07 -09 -01
Hold
06 -18 -01
07 -09 -01
07 -09 -01
Hold
06 -18 -01
07 -09 -01
07 -09 -01
Hold
06 -18 -01
07 -09 -01
07 -09 -01
Hold
7
28
28
H
7
28
28
H
7
28
28
H
7
28
28
H
119330
150120
152410
119920
159030
159320
119980
154050
154880
106690
144140
144810
4220
5310
5390
4240
5630
5640
4250
5450
5480
3780
5100
5130
5350
5640
5470
5120
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
EI lEI1 1EEF�Ir1I
GI=OU
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
5 9019
9019
9019
9019
6 9020
9020
9020
9020
7 9021
9021
9021
9021
06 -18 -01
07 -09 -01
07 -09 -01
Hold
06 -18 -01
07 -09 -01
07 -09 -01
Hold
06 -18 -01
07 -09 -01
07 -09 -01
Hold
7
28
28
H
7
28
28
H
7
28
28
H
116580
154330
152890
96490
141610
144810
111030
140760
142480
4130
5460
5410
3410
5010
5130
3930
4980
5040
5440
5070
5010
Cylinder Data
Set
No.
Cylinder
ID
Slump
Time of
Sample
Air Temp.
Concrete
Temp.
Air
Entrainment
Ticket
Number
1
2
3
4
5
6
7
9015
9016
9017
9018
9019
9020
9021
4.75
5.00
4.50
5.50
5.00
4.50
4.75
7:25AM
8:10AM
9:10AM
9:50AM
10:40AM
11:25AM
12:40AM
76
78
79
82
84
88
89
88
88
88
88
88
88
88
N/A
N/A
N/A
N/A
N/A
N/A
N/A
103783
103870
103802
103811
103824
103833
103846
Mail
Distribution: (1) Duke -Weeks Realty Corporation/
Mr. Jeff Langston
(1) Butler Construction /Mr. David Husted
(1) Pacheco Koch, Inc. /Mr. Jack Evans
(1) City of Coppel /Mr. Lee Stone
(1) City of Coppel /Mr. Larry Davis
(1) HBC Engineering /Mr. Bob Baker
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je
Set
No.
Cylinder
ID
Slump
Time of
Sample
Air Temp.
Concrete
Temp.
Air
Entrainment
Ticket
Number
1 9094 5.00 2:30PM 94 95 N/A 103855
REPORTED TO: Duke -Weeks Realty Corporation
5495 Belt Line Road, Suite 360
Dallas, Texas 75240
ATTN: Mr. Jeff Langston
CONTRACTOR: Butler Construction
Location of Sample
Design Information
Test Results
Cylinder Data
CONCRETE CYLINDER TEST REPORT
Freeport 9
Coppell Road at Bethel Road
Coppell, Texas
Mail
Distribution: (1) Duke -Weeks Realty Corporation/
Mr. Jeff Langston
(1) Butler Construction /Mr. David Husted
(1) Pacheco Koch, Inc. /Mr. Jack Evans
(1) City of Coppel /Mr. Lee Stone
(1) City of Coppel /Mr. Larry Davis
(1) HBC Engineering /Mr. Bob Baker
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
FEED I Er1ES r1 FEE EF=4
GEOTECHNICAL AND I IM R O LJ I
ENVIRONMENTAL CONSULTANTS
REPORT NO. 53
REG PROJECT NO. 7888
SAMPLE DATE: 06 -11 -01
TECHNICIAN: J. Johnson
Set Number I Location
1 Quantity Represented
1
Piers: H -1.5, H -1 and H -2
10/10
Source of Concrete 1 Mix Identification
Specified Strength p.s.i.
Potter
9337
3000
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
1 9094
9094
9094
9094
06 -18 -01
06 -18 -01
07 -09 -01
07 -09 -01
7
7
28
28
83910
86990
101670
109790
2970
3080
3600
3890
3030
3750
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je
Set
No.
Cylinder
ID
Slump
Time of
Sample
Air Temp.
Concrete
Temp.
Air
Entrainment
Ticket
Number
1 9094 5.00 2:30PM 94 95 N/A 103855
REPORTED TO: Duke -Weeks Realty Corporation
5495 Belt Line Road, Suite 360
Dallas, Texas 75240
ATTN: Mr. Jeff Langston
CONTRACTOR: Butler Construction
Location of Sample
Design Information
Test Results
Cylinder Data
1=1 1=
CONCRETE CYLINDER TEST REPORT
Freeport 9
Coppell Road at Bethel Road
Coppell, Texas
Mail
Distribution: (1) Duke -Weeks Realty Corporation/
Mr. Jeff Langston
(1) Butler Construction /Mr. David Husted
(1) Pacheco Koch, Inc. /Mr. Jack Evans
(1) City of Coppel /Mr. Lee Stone
(1) City of Coppel /Mr. Larry Davis
(1) HBC Engineering /Mr. Bob Baker
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
Keith Atkins
KEA/je
EnGFnEEFRinG
REPORT NO. 53
REG PROJECT NO. 7888
SAMPLE DATE: 06 -11 -01
TECHNICIAN: J. Johnson
Set Number I Location
1 Quantity Represented
1
Piers: H -1.5, H -1 and H -2
10/10
Source of Concrete
Mix Identification
Specified Strength p.s.i.
Potter
9337
3000
Set
No.
Cylinder
ID
Date Tested
Age
Test
Total Load
lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
1 9094
9094
9094
9094
06 -18 -01
06 -18 -01
07 -09 -01
07 -09 -01
7 83910
7 86990
28
28
2970
3080
3030
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
GF=1IDUFri