Loading...
Freeport NIP(7.5)-LR010611 (2)REPORTED TO: Duke -Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston CONTRACTOR: Butler Construction Location of Sample Design Information Test Results FREEn CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT NO. 54 REG PROJECT NO. 7888 SAMPLE DATE: 06 11 01 TECHNICIAN: R. Yeoman Set Number 1 Location Quantity Represented 1 2 3 4 5 6 7 Floor Slab E -21.5 Floor Slab E -20.2 Floor Slab E -19.5 Floor Slab E -18.5 Floor Slab E -18.8 Floor Slab E -17.5 Floor Slab E -16.5 40/710 140/710 230/710 320/710 450/710 540/710 670/710 Source of Concrete Mix Identification Specified Strength p.s.i. Potter 9349 4000 Set No. Cylinder ID Date Tested Age Test Total Load lbs. Compressive Strength p.s.i. Average Strength p.s.i. 1 9015 9015 9015 9015 2 9016 9016 9016 9016 3 9017 9017 9017 9017 4 9018 9018 9018 9018 06 -18 -01 07 -09 -01 07 -09 -01 Hold 06 -18 -01 07 -09 -01 07 -09 -01 Hold 06 -18 -01 07 -09 -01 07 -09 -01 Hold 06 -18 -01 07 -09 -01 07 -09 -01 Hold 7 28 28 H 7 28 28 H 7 28 28 H 7 28 28 H 119330 119920 119980 106690 4220 4240 4250 3780 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019 En�inEERin� C ROUP Set No. Cylinder ID Date Tested Age Test Total Load lbs. Compressive Strength p.s.i. Average Strength p.s.i. 5 9019 06 -18 -01 7 116580 4130 9019 07 -09 -01 28 9019 07 -09 -01 28 9019 Hold H 6 9020 06 -18 -01 7 96490 3410 9020 07 -09 -01 28 9020 07 -09 -01 28 9020 Hold H 7 9021 9021 9021 9021 06 -18 -01 07 -09 -01 07 -09 -01 Hold 7 111030 3930 28 28 H Cylinder Data Set No. Cylinder ID Slump Time of Sample Air Temp. Concrete Temp. Air Entrainment Ticket Number 1 9015 4.75 7:25AM 76 88 N/A 103783 2 9016 5.00 8:10AM 78 88 N/A 103870 3 9017 4.50 9:10AM 79 88 N/A 103802 4 9018 5.50 9:50AM 82 88 N/A 103811 5 9019 5.00 10:40AM 84 88 N/A 103824 6 9020 4.50 11:25AM 88 88 N/A 103833 7 9021 4.75 12:40AM 89 88 N/A 103846 Mail Distribution: (1) Duke -Weeks Realty Corporation/ Mr. Jeff Langston (1) Butler Construction /Mr. David Husted (1) Pacheco Koch, Inc. /Mr. Jack Evans (1) City of Coppel /Mr. Lee Stone (1) City of Coppel /Mr. Larry Davis (1) HBC Engineering /Mr. Bob Baker Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je REPORTED TO: Duke -Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston CONTRACTOR: Butler Construction Location of Sample Design Information Test Results CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT NO. 54 REG PROJECT NO. 7888 SAMPLE DATE: 06 -11 -01 TECHNICIAN: R. Yeoman Set Number I Location 1 Quantity Represented 1 2 3 4 5 6 7 Floor Slab E -21.5 Floor Slab E -20.2 Floor Slab E -19.5 Floor Slab E -18.5 Floor Slab E -18.8 Floor Slab E -17.5 Floor Slab E -16.5 40/710 140/710 230/710 320/710 450/710 540/710 670/710 Source of Concrete Mix Identification Specified Strength p.s.i. Potter 9349 4000 Set No. Cylinder ID Date Tested Age Test Total Load lbs. Compressive Strength p.s.i. Average Strength p.s.i. 1 9015 9015 9015 9015 2 9016 9016 9016 9016 3 9017 9017 9017 9017 4 9018 9018 9018 9018 06 -18 -01 07 -09 -01 07 -09 -01 Hold 06 -18 -01 07 -09 -01 07 -09 -01 Hold 06 -18 -01 07 -09 -01 07 -09 -01 Hold 06 -18 -01 07 -09 -01 07 -09 -01 Hold 7 28 28 H 7 28 28 H 7 28 28 H 7 28 28 H 119330 150120 152410 119920 159030 159320 119980 154050 154880 106690 144140 144810 4220 5310 5390 4240 5630 5640 4250 5450 5480 3780 5100 5130 5350 5640 5470 5120 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019 EI lEI1 1EEF�Ir1I GI=OU Set No. Cylinder ID Date Tested Age Test Total Load lbs. Compressive Strength p.s.i. Average Strength p.s.i. 5 9019 9019 9019 9019 6 9020 9020 9020 9020 7 9021 9021 9021 9021 06 -18 -01 07 -09 -01 07 -09 -01 Hold 06 -18 -01 07 -09 -01 07 -09 -01 Hold 06 -18 -01 07 -09 -01 07 -09 -01 Hold 7 28 28 H 7 28 28 H 7 28 28 H 116580 154330 152890 96490 141610 144810 111030 140760 142480 4130 5460 5410 3410 5010 5130 3930 4980 5040 5440 5070 5010 Cylinder Data Set No. Cylinder ID Slump Time of Sample Air Temp. Concrete Temp. Air Entrainment Ticket Number 1 2 3 4 5 6 7 9015 9016 9017 9018 9019 9020 9021 4.75 5.00 4.50 5.50 5.00 4.50 4.75 7:25AM 8:10AM 9:10AM 9:50AM 10:40AM 11:25AM 12:40AM 76 78 79 82 84 88 89 88 88 88 88 88 88 88 N/A N/A N/A N/A N/A N/A N/A 103783 103870 103802 103811 103824 103833 103846 Mail Distribution: (1) Duke -Weeks Realty Corporation/ Mr. Jeff Langston (1) Butler Construction /Mr. David Husted (1) Pacheco Koch, Inc. /Mr. Jack Evans (1) City of Coppel /Mr. Lee Stone (1) City of Coppel /Mr. Larry Davis (1) HBC Engineering /Mr. Bob Baker Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je Set No. Cylinder ID Slump Time of Sample Air Temp. Concrete Temp. Air Entrainment Ticket Number 1 9094 5.00 2:30PM 94 95 N/A 103855 REPORTED TO: Duke -Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston CONTRACTOR: Butler Construction Location of Sample Design Information Test Results Cylinder Data CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas Mail Distribution: (1) Duke -Weeks Realty Corporation/ Mr. Jeff Langston (1) Butler Construction /Mr. David Husted (1) Pacheco Koch, Inc. /Mr. Jack Evans (1) City of Coppel /Mr. Lee Stone (1) City of Coppel /Mr. Larry Davis (1) HBC Engineering /Mr. Bob Baker 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019 FEED I Er1ES r1 FEE EF=4 GEOTECHNICAL AND I IM R O LJ I ENVIRONMENTAL CONSULTANTS REPORT NO. 53 REG PROJECT NO. 7888 SAMPLE DATE: 06 -11 -01 TECHNICIAN: J. Johnson Set Number I Location 1 Quantity Represented 1 Piers: H -1.5, H -1 and H -2 10/10 Source of Concrete 1 Mix Identification Specified Strength p.s.i. Potter 9337 3000 Set No. Cylinder ID Date Tested Age Test Total Load lbs. Compressive Strength p.s.i. Average Strength p.s.i. 1 9094 9094 9094 9094 06 -18 -01 06 -18 -01 07 -09 -01 07 -09 -01 7 7 28 28 83910 86990 101670 109790 2970 3080 3600 3890 3030 3750 Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je Set No. Cylinder ID Slump Time of Sample Air Temp. Concrete Temp. Air Entrainment Ticket Number 1 9094 5.00 2:30PM 94 95 N/A 103855 REPORTED TO: Duke -Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston CONTRACTOR: Butler Construction Location of Sample Design Information Test Results Cylinder Data 1=1 1= CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas Mail Distribution: (1) Duke -Weeks Realty Corporation/ Mr. Jeff Langston (1) Butler Construction /Mr. David Husted (1) Pacheco Koch, Inc. /Mr. Jack Evans (1) City of Coppel /Mr. Lee Stone (1) City of Coppel /Mr. Larry Davis (1) HBC Engineering /Mr. Bob Baker GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS Keith Atkins KEA/je EnGFnEEFRinG REPORT NO. 53 REG PROJECT NO. 7888 SAMPLE DATE: 06 -11 -01 TECHNICIAN: J. Johnson Set Number I Location 1 Quantity Represented 1 Piers: H -1.5, H -1 and H -2 10/10 Source of Concrete Mix Identification Specified Strength p.s.i. Potter 9337 3000 Set No. Cylinder ID Date Tested Age Test Total Load lbs. Compressive Strength p.s.i. Average Strength p.s.i. 1 9094 9094 9094 9094 06 -18 -01 06 -18 -01 07 -09 -01 07 -09 -01 7 83910 7 86990 28 28 2970 3080 3030 Submitted by: REED ENGINEERING GROUP, INC. Original Signed By 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019 GF=1IDUFri