Loading...
Freeport NIP(7.5)-LR010607 (2) GEOTECHNICALAND J J:~ F~J r-i I I F~ ENVIRONHENTAL CONSULTANTS REPORT OF PIER OBSERVATION Freeport 9 Coppell Road at Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 1 5495 Belt Line Road, Suite 360 REPORT DATE: 06-07-01 Dallas, Texas 75240 REG PROJECT NO. 7888 ATTN: Mr. Jeff Langston TECHNICIAN: J. Johnson PAGE: 1 of 1 - CONTRACTOR: Butler Construction Date Pier No. (inches) (inches) Bell (feet) of Pier (feet) Length (feet) 05-17-01 B-4 24 66 15.2 15.5 15.3 B-5 24 66 15.5 15.8 15.4 B-6 24 66 15.3 15.5 15.4 B-8 24 66 15.0 15.1 15.1 C-4 24 66 15.7 16.0 16.0 C-5 24 66 15.4 15.4 14.9 C-6 24 66 15.2 15.8 15.5 C-8 24 66 15.0 15.7 15.1 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Butler Construction/ Mr. David Husted Original Signed By (1) Pacheco Koch, Inc./Mr. Jack Evans (1) City of Coppel/Mr. Lee Stone James F. Phipps, P.E. (1) City of Coppel/Mr. Larry Davis JP/cg 2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTFCHNICAL AND ~ F::JJ r'l LJ F:::= ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 47 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7888 Dallas, Texas 75240 SAMPLE DATE: 06-07-01 A-I-TN: Mr. Jeff Langston TECHNICIAN: R. Yeoman CONTRACTOR: Butler Construction Location of Sample Set Number I Location I Quantity Represented 1 Floor slab at C-22 50/800 2 Floor slab at C-21.5 140/800 3 Floor slab at C-19.8 250/800 4 Floor slab at C-20.5 330/800 5 Floor slab at C-18.5 430/800 6 Floor slab at C-17~5 550/800 7 Floor slab at C-17 640/800 8 Floor slab at C-16.2 730/800 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. Potter 9349 4000 Test Results Set Cylinder Age@ Total Load J Compressive J Average No. ID Date Tested Test lbs. J JStrength p.s.i. Strength p.s.i. 1 8901 06-14-01 7 119330 4220 8901 07-05-01 28 158520 5610 8901 07-05-01 28 160120 5670 5640 8901 Hold H 2 8902 06-14-01 7 133650 4730 8902 07-05-01 28 155910 5520 8902 07-05-01 28 160450 5680 5600 8902 Hold H 3 8903 06-14-01 7 133870 4740 8903 07-05-01 28 148750 5260 8903 07-05-01 28 153720 5440 5350 8903 Hold H 4 8904 06-14-01 7 119330 4220 8904 07-05-01 28 143220 5070 8904 07-05-01 28 147180 5210 5140 8904 Hold H 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 * TEL [214] 350 5600 · FAX [214] 350 0019 No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 5 8905 06-14-01 7 125960 4460 8905 07-05-01 28 149510 5290 8905 07-05-01 28 158380 5610 5450 8905 Hold H 6 8906 06-14-01 7 117660 4160 8906 07-05-01 28 143440 5080 8906 07-05-01 28 147650 5230 5160 8906 Hold H 7 8907 06-14-01 7 126480 4480 8907 07-05-01 28 162530 5750 8907 07-05-01 28 159090 5630 5690 8907 Hold H 8 8908 06-14-01 7 123860 4380 8908 07-05-01 28 162530 5750 8908 07-05-01 28 167120 5910 5830 8908 Hold H Cylinder Data Set CylinderI Timeof [ I ConcreteI Air Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 8901 5.00 7:35AM 75 88 N/A 103635 2 8902 5.00 8:15AM 76 87 N/A 103644 3 8903 5.00 9:10AM 78 86 N/A 103655 4 8904 4.50 9:50AM 77 88 N/A 103663 5 8905 4.50 10:40AM 78 88 N/A 103673 6 8906 5.00 11:30AM 80 88 N/A 103685 7 8907 5.00 12:50PM 80 87 N/A 103694 8 8908 4.50 1:48PM 88 87 N/A 103703 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Butler Construction/Mr. David Husted (1) Pacheco Koch, Inc./Mr. Jack Evans Original Signed By (1) City of Coppel/Mr. Lee Stone (1) City of Coppel/Mr. Larry Davis Keith Atkins (1) HBC Engineering/Mr. Bob Baker KEA/je F:IEE/-~ I EI'--I[~ I F-IEEF~IIF'Ir'~ GEOTECHNICALAND G R O I I ~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 48 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7888 Dallas, Texas 75240 SAMPLE DATE: 06-07-01 ATTN: Mr. Jeff Langston TECHNICIAN: R. Yeoman CONTRACTOR: Butler Construction Location of Sample Set Number I Location I Quantity Represented 1 Manhole line G STA 9+00 10/10 Design Information IS°urce °f C°ncrete IRedi-Mix Mix Identification 604 I Specified Strength p.s.i. Unknown I Test Results Set CylinderI I Age @ I Total Load I Compressive I Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 8895 06-14-01 7 139060 4920 8895 07-05-01 28 177650 6290 8895 07-05-01 28 181810 6430 6360 8895 Hold H Cylinder Data No. ID Slump Sample Air Temp. Temp. Entrainment Number I 8895 5.00 2:40PM 80 87 N/A 17374 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Butler Construction/Mr. David Husted (1) Pacheco Koch, Inc./Mr. Jack Evans Original Signed By (1) City of Coppel/Mr. Lee Stone (1) City of Coppel/Mr. Larry Davis Keith Atkins (1) HBC Engineering/Mr. Bob Baker KEA/je 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND G F;q r-1 i i F~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 49 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7888 Dallas, Texas 75240 SAMPLE DATE: 06-07-01 ATTN: Mr. Jeff Langston TECHNICIAN: J. Johnson CONTRACTOR: Butler Construction Location of Sample Set Number I Location I Quantity Represented 1 Piers: A-5.1, A-5.3, A-5.5 and A-5.7 10/10 I Design Information IS°urce °f C°ncrete IPotter Mix Identification 9337 I Specified Strength p.s.i. 3000 I Test Results Set CylinderI I Age @ I Total Load I CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 8824 06-14-01 7 105330 3730 8824 06-14-01 7 107120 3790 3760 8824 07-05-01 28 136670 4840 8824 07-05-01 28 138190 4890 4870 Cylinder Data SetI Cylinder I Timeof J ConcreteI Air Ticket No. I ID Slump Sample Air Temp. Temp. Entrainment Number I 8824 5.50 3:20PM 89 94 N/A 10371 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Butler Construction/Mr. David Husted (1) Pacheco Koch, Inc./Mr. Jack Evans Original Signed By (1) City of Coppel/Mr. Lee Stone (1) City of Coppel/Mr. Larry Davis Keith Atkins (1) HBC Engineering/Mr. Bob Baker KEA/je 2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 * FAX [214] 350 0019 GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 49 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7888 Dallas, Texas 75240 SAMPLE DATE: 06-07-01 ATTN: Mr. Jeff Langston TECHNICIAN: J. Johnson CONTRACTOR: Butler Construction Location of Sample ISet Number I Location I Quantity Represented 1 Piers: A-5.1, A-5.3, A-5.5 and A-5.7 10/10 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. Potter 9337 3000 Test Results Set CylinderI I Age@ Total Load Compressive [ Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 8824 06-14-01 7 105330 3730 8824 06-14-01 7 107120 3790 3760 8824 07-05-01 28 8824 07-05-01 28 Cylinder Data set I Cy,inderI Time ofI [Concrete Air I Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number i 8824 5.50 3:20PM 89 94 N/A 103711 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Butler Construction/Mr. David Husted (1) Pacheco Koch, Inc./Mr. Jack Evans Original Signed By (1) City Of Coppel/Mr. Lee Stone ('1) City of Coppel/Mr. Larry Davis Keith Atkins (1) HBC Engineering/Mr. Bob Baker KEA/je 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICALAND J G F~ J~J I I ~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 48 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7888 Dallas, Texas 75240 SAMPLE DATE: 06-07-01 ATTN: Mr. Jeff Langston TECHNICIAN: R. Yeoman CONTRACTOR: Butler Construction Location of Sample I Set Number I Location I Quantity Represented I Manhole line G STA 9+00 10/10 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. Redi-Mix 604 Unknown Test Results Set CylinderI I Age @ J Total Load [ Compressive I Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 8895 06-14-01 7 139060 4920 8895 07-05-01 28 8895 07-05-01 28 8895 Hold H Cylinder Data Set I Cylinder Timeof I Concrete Air I Ticket l No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 8895 5.00 2:40PM 80 87 N/A 17374 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Butler Construction/Mr. David Husted (1) Pacheco Koch, Inc./Mr. Jack Evans Original Signed By (1) City of Coppel/Mr. Lee Stone (1) City of Coppel/Mr. Larry Davis Keith Atkins (1) HBC Engineering/Mr. Bob Baker KEA/je 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICALAND J r~ J~j i'-1 I I EN¥1RONHENTAL CONSULTANTS I CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 47 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7888 Dallas, Texas 75240 SAMPLE DATE: 06-07-01 ATTN: Mr. Jeff Langston TECHNICIAN: R. Yeoman CONTRACTOR: Butler Construction Location of Sample Set Number I Location I Quantity Represented 1 Floor slab at C-22 50/800 2 Floor slab at C-21.5 140/800 3 Floor slab at C-19.8 250/800 4 Floor slab at C-20.5 330/800 5 Floor slab at C-18.5 430/800 6 Floor slab at C-17.5 550/800 7 Floor slab at C-17 640/800 8 Floor slab at C-16.2 730/800 Design Information I Source of Concrete t Mix Identification I Specified Strength p.s.i. Potter 9349 4000 Test Results Set Cylinder Age~ TotalLoad J Compressive J Average No. ID Date Tested Test lbs. J JStrength p.s.i. Strength p.s.i. 1 8901 06-14-01 7 119330 4220 8901 07-05-01 28 8901 07-05-01 28 8901 Hold H 2 8902 06-14-01 7 133650 4730 8902 07-05-01 28 8902 07-05-01 28 8902 Hold H 3 8903 06-14-01 7 133870 4740 8903 07-05-01 28 8903 07-05-01 28 8903 Hold H 4 8904 06-14-01 7 119330 4220 8904 07-05-01 28 8904 07-05-01 28 8904 Hold H 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 5 8905 06-14-01 7 125960 4460 8905 07-05-01 28 8905 07-05-01 28 8905 Hold H 6 8906 06-14-01 7 117660 4160 8906 07-05-01 28 8906 07-05-01 28 8906 Hold H 7 8907 06-14-01 7 126480 4480 8907 07-05-01 28 8907 07-05-01 28 8907 Hold H 8 8908 06-14-01 7 123860 4380 8908 07-05-01 28 8908 07-05-01 28 8908 Hold H Cylinder Data Set Cylinder Time of I Concrete Air I Ticket No. ID Slump Sample AirTemp.I Temp. EntrainmentI Number 1 8901 5.00 7:35AM 75 88 N/A 103635 2 8902 5.00 8:15AM 76 87 N/A 103644 3 8903 5.00 9:10AM 78 86 N/A 103655 4 8904 4.50 9:50AM 77 88 N/A 103663 5 8905 4.50 10:40AM 78 88 N/A 103673 6 8906 5.00 11:30AM 80 88 N/A 103685 7 8907 5.00 12:50PM 80 87 N/A 103694 8 8908 4.50 1:48PM 88 87 N/A 103703 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Butler Construction/Mr. David Husted (1) Pacheco Koch, Inc./Mr. Jack Evans Original Signed By (1) City of Coppel/Mr. Lee Stone (1) City of Coppel/Mr. Larry Davis Keith Atkins (1) HBC Engineering/Mr. Bob Baker KEA/je