Loading...
Freeport NIP(7.5)-LR010530 GEOTECHNICALAND J ~ J~JJ J~J I I p ENVIP,.ONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 27 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7888 Dallas, Texas 75240 SAMPLE DATE: 05-30-01 ATTN: Mr. Jeff Langston TECHNICIAN: J. Johnson CONTRACTOR: Butler Construction Location of Sample I Set Number I Location I Quantity Represented 1 Piers: G-17, F-17 and E-17 10/10 Grade beam: B.1-13 Design Information l Source of Concrete I Mix Identification I Specified Strength p.s.i. Potter 9337 3000 Test Results No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 8563 06-06-01 7 110820 3920 8563 06-06-01 7 106790 3780 3850 8563 06-27-01 28 8563 06-27-01 28 Cylinder Data Set J CylinderI Time of I Concrete Air I Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 8563 4.00 1:15PM 90 95 N/A 103141 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Butler Construction/Mr. David Husted (1) Pacheco Koch, Inc./Mr. Jack Evans Original Signed By (1) City of Coppel/Mr. Lee Stone (1) City of Coppel/Mr. Larry Davis Keith Atkins (1) HBC Engineering/Mr. Bob Baker KEA/je 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICALAND J J~J F~J r-i I I j~= ENVlRONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 27 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7888 Dallas, Texas 75240 SAMPLE DATE: 05-30-01 ATTN: Mr. Jeff Langston TECHNICIAN: J. Johnson CONTRACTOR: Butler Construction Location of Sample Set Number I Location I Quantity Represented 1 Piers: G-17, F-17 and E-17 10/10 Grade beam: B.1-13 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. Potter 9337 3000 Test Results Set CylinderI Age@ I Total Load [ Compressive I Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 8563 06-06-01 7 110820 3920 8563 06-06-01 7 106790 3780 3850 8563 06-27-01 28 140420 4970 8563 06-27-01 28 144890 5130 5050 Cylinder Data ISet J Cylinder [ Time of I Concrete Air Ticket N1o. J ID Slump Sample AirTemp. Temp. Entrainment Number 8563 4.00 1:15PM 90 95 N/A 103141 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Butler Construction/Mr. David Husted (1) Pacheco Koch, Inc./Mr. Jack Evans Original Signed By (1) City of Coppel/Mr. Lee Stone (1) City of Coppel/Mr. Larry Davis Keith Atkins ('1) HBC Engineering/Mr. Bob Baker KEA/je 2424 STUTZ DR. o SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019