Loading...
Freeport NIP(7.5)-LR010522 GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 14 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7888 Dallas, Texas 75240 SAMPLE DATE: 05-22-01 ATTN: Mr. Jeff Langston TECHNICIAN: J. Johnson CONTRACTOR: Butler Construction Location of Sample ISet Number I Location I Quantity Represented 1 Piers: H-4, J-4, K-5 and J-5 10/30 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. Hanson 9337 3000 Test Results No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 8095 05-29-01 7 114500 4050 8095 05-29-01 7 111420 3940 4000 8095 06-19-01 28 146280 5180 8095 06-19-01 28 150900 5340 5260 Cylinder Data Set I Cylinder TimeofI I Concrete Air I Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number I 8095 5.00 04:30 PM 86 90 N/A 805594 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Butler Construction/Mr. David Husted (1) Pacheco Koch, Inc./Mr. Jack Evans Original Signed By (1) City of Coppel/Mr. Lee Stone (1) City of Coppel/Mr. Larry Davis Keith Atkins (1) HBC Engineering/Mr. Bob Baker KENcdl 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 * FAX [214] 350 0019 GEOTECHNICAL AND J ~ F=JJ I--1 LJ J=~ ENVlRONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 14 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7888 Dallas, Texas 75240 SAMPLE DATE: 05-22-01 ATTN: Mr. Jeff Langston TECHNICIAN: J. Johnson CONTRACTOR: Butler Construction Location of Sample Set Number J Location J Quantity Represented 1 Piers: H-4, J-4, K-5 and J-5 10/30 Design Information J Source of Concrete J Mix Identification J Specified Strength p.s.i. Hanson 9337 3000 Test Results Set Cylinder J Age@ [ Total Load J Compressive J Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 8095 05-29-01 7 114500 4050 8095 05-29-01 7 111420 3940 4000 8095 06-19-01 28 8095 06-19-01 28 Cylinder Data Set J Cylinder I1 Time°f I I Concrete Air Ticket J INo. ID Slump Sample Air Temp. Temp. Entrainment Number 8095 5.00 04:30 PM 86 90 N/A 805594 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Butler Construction/Mr. David Husted (1) Pacheco Koch, Inc./Mr. Jack Evans Original Signed By (1) City of Coppel/Mr. Lee Stone (1) City of Coppel/Mr. Larry Davis Keith Atkins (1) HBC Engineering/Mr. Bob Baker KEAJcdl 2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019