Loading...
Freeport NIP(7.5)-LR010521 GEOTECHNICAL AND J ~ ~ r-1 U I~m ENVIRONi~IENTAL CONSULTANTS I CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 13 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7888 Dallas, Texas 75240 SAMPLE DATE: 05-21-01 ATTN: Mr. Jeff Langston TECHNICIAN: J. Johnson CONTRACTOR: Butler Construction Location of Sample ISet Number I Location I Quantity Represented 1 Piers: D-17, D-18, D-19 and D-20 10/10 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. Hanson 9337 3000 Test Results Set Cylinder[ Age@ I Total Load CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 8094 05-28-01 7 84300 2980 8094 05-28-01 7 80010 2830 2910 8094 06-18-01 28 8094 06-18-01 28 Cylinder Data Set I Cylinder I Time of Concrete Air Ticket I No. ID Slump Sample Air Temp. Temp. Entrainment Number I 1 8094 4.50 01:00 PM 61 75 N/A 805446 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Butler Construction/Mr. David Husted (1) Pacheco Koch, Inc./Mr. Jack Evans Original Signed By (1) City of Coppel/Mr. Lee Stone (1) City of Coppel/Mr. Larry Davis Keith Atkins (1) HBC Engineering/Mr. Bob Baker KEA/cdl 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICALAND J J:~ ~ I'"'1 I I J~ I~NVIRONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport 9 Coppell Road at Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 13 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7888 Dallas, Texas 75240 SAMPLE DATE: 05-21-01 ATTN: Mr. Jeff Langston TECHNICIAN: J. Johnson CONTRACTOR: Butler Construction Location of Sample ISet Number I Location I Quantity Represented 1 Piers: D-17, D-18, D-19 and D-20 10/10 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. Hanson 9337 3000 Test Results Set CylinderI I ^ge~ Total Load I CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. I 8094 05-28-01 7 84300 2980 8094 05-28-01 7 80010 2830 2910 8094 06-18-01 28 115870 4100 8094 06-18-01 28 114030 4040 4070 Cylinder Data Set J Cylinder Timeof J I Concrete Air J Ticket l No. ID Slump Sample Air Temp. Temp. Entrainment Number I 8094 4.50 01:00 PM 61 75 N/A 805446 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Butler Construction/Mr. David Husted (1) Pacheco Koch, Inc./Mr. Jack Evans Original Signed By (1) City of Coppel/Mr. Lee Stone (1) City of Coppel/Mr. Larry Davis Keith Atkins (1) HBC Engineering/Mr. Bob Baker KEA/cdl 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019