ST0004-CS011205 (2)12/26/01 17:0;:> CITY OF COPPELL --> 9'72 304 7041 1,10.021 B02
FROM TI-IF,
DEPARTMENT OF PUBLIC WORKS
To: Larry Davis, Construction Inspector F-~glneering
From: Danny Hightower, Utilities Division Public Works
Date: December $, 2001
RE: Walk-thru Freeport Parkway Reconstruction 12/4/01
1. Need pad at curb stop valve stake - all 5.
2. Ali irrigation DC's need plugs - all $.
3. All irrigation DC's to be tested after meters are installed.
4. No meter at this time - cannot check for leak.
$. Clean meter cans to bypass cutoff.
6. Need irrigation valve stack lid on 2'" meter from Bethel Rd.
7. Clean FH valve stack so can get on valve at Minyard and mark curb in red.
8. Mark all MLV in blue on curb and paint lids on valve stacks blue.
9. Mark IRR on curb in blue at all meter cam.
10. Mark MH in red on curb at ail sewer manholes.
11. Clean manhole at Fritz of trash in bottom.
12. Irrigation cam at Gateway raise to curb height.
13. Storm drainage manhole at Freeport and Southwestern southeast corner reset top.
14. Sewer manhole at RR regrout inside at top.
Call 972-304-3S45 for Danny Hightower to check punch list.
CITY OF COPPF, LL PU~BLIC WOItI~$ D,~sAII~